The Five Pmlc Models Essay Example
Introduction

Prior deciding on the project management most suitable approach, a PM must investigate the clarity of the two major variables, goal and solution (Wysocki, 2009: 299). Based on the criteria of clarity, Wysocki (2009: 327) defined 4 management “quadrants” adopting 5 PMLC models:

§ TPM: Linear and Incremental

§ APM: Iterative and Adoptive

§ xPM and MPx: Extreme

Each type of the 5 PMLC models is expected to encounter various risks and failure factors. The PM should asses the risks associated with each model, to decide the most convenient approach.

Linear PMLC Model

This model is the simplest among the illustrated models, since the 5 process groups are expected to occur once in the entire PMLC within the planned sequence (Wysocki, 2009: 343). A PM would adopt the linear model if the project undertaken is: clear in the aspects of goals and solutions, similar to previously executed projects, short in duration and falling in a single department’s authority.

However, and despite the simplicity associated with implementing this model; Wysocki (2009: 350-353) defined six weakness points for the linear model: limited flexibility to scope changes, high cost, last minute production of deliverables, requires early detailed planning, fixed sequence of work, and lake of focus on client value.

In the construction industry, and per my limited experience, this model is widely adopted. I believe that scope changes are the most challenging risk associated with this model. Hence, other than proper definitions of RBS, COS and POS, a PM should lay a contingency plan (including money and time) for those scope creeps, in addition to a very strict and rights reserving policy for scope changes’ approvals (Franchina, 2010).

Incremental PMLC Model
The model was designed to partially deliver incomplete deliverables through the PMLC through conducting sequential increments (Wysocki, 2009:358). In addition, Wysocki (2009: 360-364) defined 7

You May Also Find These Documents Helpful

  • Best Essays

    Business Plan for Pm430

    • 3109 Words
    • 13 Pages

    PMI - the World’s Leading Professional Association for Project Management. (2012). Retrieved October 21, 2012, from http://www.pmi.org/…

    • 3109 Words
    • 13 Pages
    Best Essays
  • Powerful Essays

    Risk breakdown structure is the hierarchically organized depiction of the identified project risks arranged by risk category (PMI PMBOK). The RBS will prove extremely valuable to better grasp when a project needs to receive special scrutiny, in other words, when risk might happen. The RBS can help the project manager and the risk manager to better understand a recurring risks and concentrations of risks that could lead to issues that affect the status of the project. Following the concept of the Work breakdown Structures (WBS), the Risk Breakdown Structure provides a means for the project manager and risk manager to structure the risks being addressed or tracked.…

    • 1800 Words
    • 8 Pages
    Powerful Essays
  • Best Essays

    CIS 517: Project Management

    • 2741 Words
    • 11 Pages

    Scope. The scope of the project is defined by planning, definition, Work Break-down Structure (WBS) Creation, verification and control.…

    • 2741 Words
    • 11 Pages
    Best Essays
  • Good Essays

    The objective function and all constraints are specified correctly in the model and clearly described…

    • 578 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Verwey, A., Comninos, D. (Jan 2002). Business focused project management. Management Services, 46(1), pg. 14, 8 pgs. Retrieved November 5, 2005 from ProQuest database.…

    • 3379 Words
    • 14 Pages
    Powerful Essays
  • Powerful Essays

    References: 1. Duncan Haughey, 2011, Project Planning a Step by Step Guide, Retrieved September 13,2011 from…

    • 2679 Words
    • 11 Pages
    Powerful Essays
  • Good Essays

    There are five Project Management Life Cycle (PMLC) models for managing different types of Projects but all of them follows the five process groups namely – scoping, planning, launching, monitoring and control and close out phases for sequencing the tasks. The difference lies only in the looping of these process groups depending on the complexity of the Project. The weakness of these models and mitigating strategies are discussed as follows for these models:…

    • 618 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Project Management is a methodical approach to planning and piloting project processes and tools from start to finish. According to the Project Management Institute, the processes are guided through five stages: initiation, planning, executing, controlling, and closing. Project Management tools can be applied to almost any type of project and are widely used across the world. As there are no limits to its use, Project Management, and its tools can be employed to control anything from the complex processes of software development to the building of a garden shed.…

    • 597 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Project Management

    • 1126 Words
    • 4 Pages

    Project management is one of the most important and critical tool or technique, which defines the entire course of development of any kind of project.…

    • 1126 Words
    • 4 Pages
    Powerful Essays
  • Best Essays

    Over the past few years, project managers and project management has grown tremendous growth. Project management has evolved over the past several years from an activity in an organization to a discipline in its own right. Many professional bodies exist today to represent project management as a discipline, some of which include, PMI and PM Bok.…

    • 1130 Words
    • 5 Pages
    Best Essays
  • Good Essays

    In identifying milestones, one has to visit the issue of scheduling which mainly will appear in the scoping/planning process of a PMLC.…

    • 956 Words
    • 4 Pages
    Good Essays
  • Better Essays

    Gray, Clifford F.; Larson, Erik W., Project Management – The Managerial Process, Copyright © 2001 by The McGraw-Hill Companies, Inc.…

    • 1249 Words
    • 5 Pages
    Better Essays
  • Good Essays

    One of the most important steps within a project is risk management because it plans for and responds to risks that impact the overall project deliverables including budget and timeframe. Risk management is used to mitigate risk in ways that align with each individual risk and its potential impact. During the risk management process risks are identified and defined and a plan to control, monitor and eliminate them is created. Risks from all areas are brought up during these brainstorming sessions of the risk management planning phase and are planned for accordingly. The work breakdown structure of the project is used as a guide when compiling a risk matrix that will identify potential risks, their severity and impacts. The case study in chapter 13 reflects two different risk response strategies with regards to the tender review process of a project’s deliverables. The first phase of the case study aligns more closely with a thorough and effective risk planning process plan while the second phase builds on the baselines determined by the first phase to generate a more solid and final risk assessment that will continue to be fluid throughout the project.…

    • 1084 Words
    • 5 Pages
    Good Essays
  • Good Essays

    PMLC MODEL

    • 1177 Words
    • 5 Pages

    (Wysocki, 2012, p321) stated ‘the project management/projects landscape is based on two characteristics, goal and solution’ in complexity and uncertainly classification on the project.…

    • 1177 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    performance and the possibility of multiple disruptions over time. The model differs from previous types…

    • 9584 Words
    • 39 Pages
    Powerful Essays