Bus 519 Assignment 3 Final Paper.
Project Management - BUS 519

Assignment #3
“Politics, Institutions, and Project Finance: The Dabhol Power Project”

Abstract
Dabhol Power Project is a massive combined-cycle power plant on the western coast of India 's Maharashtra state in which Enron had majority shares. The Dabhol power plant was initiated in 1992 and took nine years to commence operation. The project was planned to construct 2,184 megawatts, which Enron believed it was the largest gas-fired power plant in the world. Politics, institutions and finance led to a dispute between the Maharashtra state government and the plant owners, and the project was closed in June, 2001. In this case we will evaluate the role that these factors played in the Dabhol Power Project.

Prepare a Risk Breakdown Structure assessing the main categories of risks. Risk breakdown structure is the hierarchically organized depiction of the identified project risks arranged by risk category (PMI PMBOK). The RBS will prove extremely valuable to better grasp when a project needs to receive special scrutiny, in other words, when risk might happen. The RBS can help the project manager and the risk manager to better understand a recurring risks and concentrations of risks that could lead to issues that affect the status of the project. Following the concept of the Work breakdown Structures (WBS), the Risk Breakdown Structure provides a means for the project manager and risk manager to structure the risks being addressed or tracked. The Risk Breakdown Structure of Dabhol project produced hierarchical structure under various names to describe sources of risk, or risk categories or types. Each of these structures contains three or four hierarchical level to describe the types of risk faced by the project in question. RBS Level | Level 1 | Level 2 | Project risk | 1.Development Environment Risk | 1.1development system1.2 management methods1.3 Work Environment | | 2. Economical risk | 2.1 Contractual terms



References: Custom book (2011) BUS 519: Project Risk Management Case pack 2011.New York : John Wiley & Sons. Hillson, D and Simon .P (2007) Practical Project Risk Management: The Atom Methodology .Vienna VA management Concepts. PMI PMBOK, 3rd Edition Chapter 11 Risk Management The Enron Saga, http://www.rediff.com/money/enron1.htm

You May Also Find These Documents Helpful

  • Good Essays

    Case 3 Risk Management

    • 1053 Words
    • 5 Pages

    The main factor for not completing the project is team failure which is because of poor overall initial planning. When there are unrealistic goals being set, creating a chaotic working environment there is bound to be nothing but pure failure of the project and its successin the near future. There can be two major causes for the team project failures; overdue or missed time standards, and going beyond set financial plans. With the interpretation of day to day basis risk assessments into team developed projects, there is a more realistic set of guidelines, and procedures put into place. The definition of a risk assessment states , “ that it is theidentification, evaluation, and estimation of the main levels of risks involved in a situation, their comparison against benchmarks or standards, and determination of an acceptable level of risk”. With set risk assessment techniques, the team may further eradicate all possible liabilities or future occurrences within the project team.…

    • 1053 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    BUS 519

    • 266 Words
    • 2 Pages

    Based on the above results, three project risk recommendations will be presented in this assignment. The initial risk categories (RBS Level 1 and 2) will be presented based on the case study using the Example Risk Checklist (figure A-2 Hillson & Simon text).…

    • 266 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Based on the above results, three project risk recommendations will be presented in this assignment. The initial risk categories (RBS Level 1 and 2) will be presented based on the case study using the Example Risk Checklist (figure A-2 Hillson & Simon text).…

    • 2421 Words
    • 10 Pages
    Powerful Essays
  • Best Essays

    Mulcahy, Rita (2003), Risk Management, Tricks of the Trade� for Project Managers, 4th edition, RMC Publications.…

    • 3535 Words
    • 15 Pages
    Best Essays
  • Powerful Essays

    References: 1. J.R. Meredith and S.J. Mantel, “Project Management — A Managerial Approach” (New York: John Wiley & Sons, 1995); C. Chapman and S. Ward, “Project Risk Management” (Chichester, United Kingdom: Wiley, 1997), 7; and R.L. Kliem and I.S. Ludin, “Reducing Project Risk” (Hampshire, United Kingdom: Gower, 1997), 10-25. 2. C.B. Chapman, “A Risk Engineering Approach to Project Risk Management,” International Journal of Project Management 8 (1990): 5-16. 3. For more examples of projects with variation, see A. De Meyer and C.-C. Hwee, “Banyan Tree Resorts and Hotels: Building the…

    • 5514 Words
    • 23 Pages
    Powerful Essays
  • Better Essays

    Cited: Hillson, D., & Simon, P. (1995). Practical Project Risk Management: The Atom Methodology. Vienna: Management Concepts, Inc.…

    • 1069 Words
    • 5 Pages
    Better Essays
  • Better Essays

    Strategy Discussion

    • 1120 Words
    • 5 Pages

    This form evaluates the proposed system risk based on a set of standard system risk criteria in four categories: the organization, the information system, the developers, and the users (internal and external). Each criterion is considered in the context of the organization and proposed system. Each criteria is rated (-1, 0, +1) and the ratings are totaled, providing a project risk index. A positive or negative index indicates a…

    • 1120 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    Exammyydj

    • 4844 Words
    • 20 Pages

    The Program Evaluation and Review Technique (PERT) is a network analysis technique which is used to estimate project duration when there is a high degree of uncertainty about the individual activity duration estimates (Schwalbe 2013). PERT is an ‘event-oriented’ technique which uses arrow diagram to identify critical activities that need to be completed in order to finish the project. Besides, PERT also uses statistical distribution to provide probabilistic estimate of project duration derived from three estimates listed below (Marchewka 2010). Optimistic estimate: the minimum possible…

    • 4844 Words
    • 20 Pages
    Powerful Essays
  • Powerful Essays

    Pmp 175 Questions

    • 23215 Words
    • 93 Pages

    References: PMBOK® Guide, 4th Edition, page 102; Tom Kendrick, Identifying and Managing Project Risk: Essential Tools for Failure-Proofing Your Project, page 323, pmi.books24x7.com/viewer.asp?bookid=5591&chunkid=0802978591&rowid=703.…

    • 23215 Words
    • 93 Pages
    Powerful Essays
  • Powerful Essays

    Regency Plaza is a mixed-use multi million US dollar project carrying quite high stakes. So the risks of it should be evaluated beforehand and managed well in order to make sure that the project wouldn’t over run budget or time and end with a successful result. Here we use the “Four Stage Risk Management Process” to evaluate the risk management happened in Regency Plaza project.…

    • 1263 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    The Dabhol Power Project

    • 1181 Words
    • 4 Pages

    Fuel Supply RISK: The Dabhol plant utilized distillate oil, the risk that the IPP would not have sufficient quantities of fuel needed for the power plant. Also MSEB had not verified whether the price of fuel was economical and the fuel supplier was not bound to provide minimum quantity of fuel. It is interesting that Enron at the time had invested in a…

    • 1181 Words
    • 4 Pages
    Good Essays
  • Good Essays

    their experience, the loss of trained ERP analysts to consulting firms was particularly frustrating (four…

    • 1161 Words
    • 5 Pages
    Good Essays
  • Good Essays

    During the drawing up of these break down schedules, the project team will continuously make use of the project objectives, scope statement and statement of works as reference. After the WBS and RBS are complete a risk assessment is done to identify all the risks that affect the project cost, so that contingencies can also be included in the cost estimate. This than give all the stakeholders an idea of more or less what to look at in terms of cost estimation and budgeting…

    • 1360 Words
    • 6 Pages
    Good Essays
  • Satisfactory Essays

    Project Assignment

    • 979 Words
    • 4 Pages

    G. Risk Analysis. Describe possible project risks, the likelihood of these risks arising, and the risk resolution strategies developed (if any).…

    • 979 Words
    • 4 Pages
    Satisfactory Essays
  • Good Essays

    There is several risk identification to be asked in this projects, those are as follows:…

    • 846 Words
    • 4 Pages
    Good Essays