Scrum, By Ken Schwaber: Project Management
Scrum was developed by Ken Schwaber for project management (Schwaber & Sutherland, 1995). It is one of the agile methods. Its main purpose was to help in improving the productivity within the teams as previous methods were not so effective.
Scrum is characterized by:
• Prioritized work to be completed first.
• All the work is divided into small series of iterations. It helps to improve effectiveness.
• A daily scrum meeting to explain the progress, where the work is stuck, where the problems are and how to solve them.
• A small session where the backlog items can be explained and solved.
• A small session in which all the members can explain about the past sprint.
Scrum is run by scrum master, whose main role is to handle the meeting and remove
…show more content…
Every time a sprint begins with the planning meeting, in which the development team and the client who has given the requirements agree upon the work which has to be completed within the duration of this sprint. The development team has the right to say the final word that how much work has to be done in a realistic way during the sprint and the product owner has the right to the final word on setting the criteria that need to be met during this sprint that can be accepted and approved.
The time span of the sprint is decided by the scrum master and once decided all the future sprints should also last for the same time. In tradition, processes sprint used to last for 30 days.
Once the sprint begins, product owner has no right to step in between and stop the sprint until and unless it has the major issue or it answers questions. On daily basis Standup meetings are organized by the scrum master in which all the progress is being discussed. Only scrum master or project manager can interrupt the ongoing sprint. The product owner can only attend the meetings but cannot interrupt the
…show more content…
Sprint planning meeting
A Sprint Planning Meeting is also organized by scrum master and it is a two-phase meeting. The first part of the meeting is attended by the customers, management, product owner, scrum team and the users. They decide on the goals and the tasks for the next sprint (see sprint backlog below). The second phase is only attended by the scrum team and the scrum master. They concentrate on the productivity of the product and how to finish the deadlines and tasks discussed in the first phase.
Sprint Backlog
The starting point for any sprint is the Sprint Backlog. It has all the Product Backlog items that have to be implemented and completed in the next Sprint. In the Sprint Planning meeting, all the items are discussed and finalized by the scrum master, scrum team and the product owner. The sprint backlog is stable until the period of sprint that is 30 days, unlike the product backlog. When all the items in the Sprint backlog are finished, the new iteration of the system is delivered.
Daily Scrum

You May Also Find These Documents Helpful

  • Better Essays

    It Management Mgt2 Task 3

    • 4060 Words
    • 13 Pages

    The team member responsible is everyone on the project, with the PM as the lead.…

    • 4060 Words
    • 13 Pages
    Better Essays
  • Powerful Essays

    At a formal meeting participants are given notice according to the rules, Agenda items are circulated for the information of participants so prior preparation can be made, A predetermined venue is used, The chairperson directs discussion, Participants speak through the chair, they seek permission from the chairperson to address the meeting, Rules or…

    • 1947 Words
    • 8 Pages
    Powerful Essays
  • Satisfactory Essays

    Huffman Trucking Benefits

    • 278 Words
    • 2 Pages

    * Project manager and task (team) leader(s) will have bi-weekly meetings to update the progress of the tasks.…

    • 278 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    GB560 Unit 6 PaigeHarward

    • 1135 Words
    • 4 Pages

    The next stage would include project planning. This is the stage in which the team would establish a detailed project plan and would navigate from the existing plan and lead to an end result. This part of the process would include creating a chart indicating what changes are being made and help the team see the flow of the “As-Is” process and the “To-Be” process.…

    • 1135 Words
    • 4 Pages
    Good Essays
  • Best Essays

    The Scrum approach has been developed gaming for managing the systems development process. It is an empirical approach applying the ideas of industrial process control theory to gaming development resulting in an approach that reintroduces the ideas of flexibility, adaptability and productivity (Schwaber & Beedle 2002). It does not define any specific software development techniques for the implementation phase. Scrum concentrates on how the team members should function in order to produce the system flexibly in a constantly changing environment.…

    • 3180 Words
    • 13 Pages
    Best Essays
  • Powerful Essays

    liitlefield

    • 1439 Words
    • 6 Pages

    Pre­Game Activities: The team met the Tuesday before class to examine the data and discuss…

    • 1439 Words
    • 6 Pages
    Powerful Essays
  • Satisfactory Essays

    The task is now assigned to everyone from the processes listed in the forming stage. They also prepare a timely schedule for the completion of the tasks as well as meeting dates in which each stage of task is fed back to the group ( as they are all from different countries, their meeting could be done using 'Conference call' or online). They will have to prepare their schedule in line with the tight deadline they have been given.…

    • 601 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    m3&d2 unit 18

    • 963 Words
    • 3 Pages

    The meeting one hour before the event meant that the group was able to organise and iron out any flaws in the planning of the event. So we were able to look at any equipment problems and set up of any resources and tables etc, beforehand and make sure we were prepared for the learners to arrive.…

    • 963 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    i want to

    • 681 Words
    • 4 Pages

    This is to get problems out in the open for discussion and then collaborate with others to find solutions. Allow the team member to develop a plan and get back on schedule in a timely manner.…

    • 681 Words
    • 4 Pages
    Powerful Essays
  • Satisfactory Essays

    Communications Plan

    • 672 Words
    • 4 Pages

    The team will have scheduled weekly communications via telecon or Internet chat. The project manager will schedule all meetings. When a deliverable is due, the team will meet the night it is due to all sign-off on the deliverable.…

    • 672 Words
    • 4 Pages
    Satisfactory Essays
  • Good Essays

    By this stage team members should know one another better (start to appreciate eachothers differences and strengths) and also may bond with one another. Discussions are developing as they…

    • 1320 Words
    • 6 Pages
    Good Essays
  • Better Essays

    SM does not have any project manager powers but are responsible to facilitate the task that was set during the Daily Scrum meeting. SM make sure the Development test stays on track by removing any distractions or potential interruptions (Scrumtrainingseries.com, n.d.).…

    • 2238 Words
    • 9 Pages
    Better Essays
  • Good Essays

    Project Kick-Off Meeting

    • 784 Words
    • 4 Pages

    Before the kick-off meeting, the project manager and the sponsor should have met several times, and other key stakeholders should have been involved in the planning of the project, such as the project charter. So first, the project manager meets with the sponsors to talk about the planning. Second, the project manager and the key stakeholders should develop the project charter. Then the project manager should create the kick-off meeting agenda. Then the project manager should come up with the meeting attendee list and send the agenda out in advance. At the meeting, the project champion should always be the first to talk. And finally, make sure the meeting ends with an action.…

    • 784 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    The meeting will be held to brainstorm ideas & to discuss activities to be engaged in. The participants shall also come up with…

    • 1490 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    Miss: Meeting and Chair

    • 2855 Words
    • 12 Pages

    Meetings can be used in different ways and can have different agenda’s to others. They can be used to inform, seek ideas, clarification, resolve problems, discuss proposals, settle disputes and take decisions.…

    • 2855 Words
    • 12 Pages
    Powerful Essays