Preview

HKH DFC USM Paper JCEM 2013

Powerful Essays
Open Document
Open Document
9802 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
HKH DFC USM Paper JCEM 2013
Uncertainty in Task Duration and Cost Estimates: Fusion of Probabilistic Forecasts and Deterministic Scheduling
Downloaded from ascelibrary.org by GEORGE WASHINGTON UNIVERSITY on 04/08/14. Copyright ASCE. For personal use only; all rights reserved.

Homayoun Khamooshi, Ph.D. 1; and Denis F. Cioffi, Ph.D. 2
Abstract: A model for project budgeting and scheduling with uncertainty is developed. The traditional critical-path method (CPM) misleads because there are few, if any, real-life deterministic situations for which CPM is a great match; program evaluation and review technique
(PERT) has been seen to have its problems, too (e.g., merge bias, unavailability of data, difficulty of implementation by practitioners). A dual focus on the distributions of the possible errors in the time and cost estimates and on the reliability of the estimates used as planned values suggests an approach for developing reliable schedules and budgets with buffers for time and cost. This method for budgeting and scheduling is executed through either simulation or a simple analytical approximation. The dynamic buffers provide much-needed flexibility, accounting for the errors in cost and duration estimates associated with planning any real project, thus providing a realistic, practical, and dynamic approach to planning and scheduling. DOI: 10.1061/(ASCE)CO.1943-7862.0000616. © 2013 American Society of Civil Engineers.
CE Database subject headings: Estimation; Scheduling; Construction costs; Budgets; Probability; Project management; Simulation;
Uncertainty principles; Forecasting.
Author keywords: Estimate; Reliability; Scheduling; Cost; Budget; Probability; Contingency; Project management; Simulation.

Introduction and Background
Inaccurate estimation has long been identified as one of the major causes of project failure (Flyvbjerg et al. 2009; Chan and
Kumaraswamy 1997; Pinto and Mantel 1990), and Standish Group reports (1998, 2009) show more projects failing and fewer successful projects.



References: Back, W. E., Boles, W. W., and Fry, G. T. (2000). “Defining triangular probability distributions from historical cost data.” J. Constr. Eng. Manage., 126(1), 29–37. Baker, W. R. (1986). “Handling uncertainty.” IJPM, 4, 205–210. Ballard, G. (1999). “Improving work flow reliability.” Proc., 7th Annual Conf Ballard, G. (2000). “Phase scheduling.” LCI White Paper No. 7, Lean Construction Institute, San Diego. Britney, B. R. (1976). “Bayesian point estimation and the PERT scheduling of stochastic activities.” Manage Buehler, R., Griffin, D., and Ross, M. (1994). “Exploring the ‘planning fallacy’: Why people underestimate their task completion times.” Burt, C. D. B., and Kemp, S. (1994). “Construction of activity duration and time management potential.” Appl Chan, D. W. M., and Kumaraswamy, M. M. (1997). “A comparative study of causes of time overruns in Hong Kong construction projects.” Int Cioffi, D. F. (2006). “Subject expertise, management effectiveness, and the newness of a project: The creation of the Oxford English Dictionary.” Cioffi, D. F., and Khamooshi, H. (2008). “A practical method to determine project risk contingency budget.” J Clark, C. E. (1961). “The greatest of a finite set of random variables.” Oper. De Meyer, L. C. H., and Pitch, M. T. (2002). “Managing project uncertainty: From variation to chaos.” MIT Sloan Management Review, Winter, 60–67. Eden, C., Williams, T., and Ackerman, F. (2005). “Analysing project cost overruns: Comparing the ‘measured mile’ analysis and system Emhejellen, M., Emhejellen, K., and Osmundsen, P. (2003). “Cost estimation overruns in the North Sea.” Proj. Manage. J, 34, 23–29. Fente, J., Schexnayder, C., and Knutson, K. (2000). “Defining a probability distribution function for construction simulation.” J Flyvbjerg, B. (2008). “Curbing optimism bias and strategic misrepresentation in planning: Reference class forecasting in practice.” Eur. Plann. Flyvbjerg, B., Garbuio, M., and Lovallo, D. (2009). “Delusion and deception in large infrastructure projects, two models for explaining and preventing executive disaster.” Calif Flyvbjerg, B., Holm, M. S., and Buhl, S. (2002). “Understanding costs in public works projects, error or lie?” J (2010). “Improving planning reliability and project performance using the reliable commitment model.” J Gutierrez, G. J., and Kouvelis, P. (1991). “Parkinson’s law and its implications for project management.” Manage. Sci., 37(8), 990–1001. Herroelen, W., De Reyck, B., and Demeulemeester, E. (1998). “Resource constrained project scheduling, a survey of recent development.” Comput Herroelen, W., and Leus, R. (2004). “The construction of stable project baseline schedules.” Eur Herroelen, W., and Leus, R. (2005). “Project scheduling under uncertainty—Survey and research potential.” Eur Howick, S. (2003). “Using system dynamics to analyze disruption and delay in complex projects for litigation: Can the modeling purposes Hughes, M. W. (1986). “Why projects fail: The effects of ignoring the obvious.” Ind

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Nt1310 Unit 4

    • 555 Words
    • 3 Pages

    | Gives a accurate estimate of the total project cost. Used for making purchasing decisions for which accurate estimates are required. Definitive estimates are created one year or less prior to project completion. The accuracy…

    • 555 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Project Costing wk4TeamB

    • 1051 Words
    • 6 Pages

    Cost estimates are the one that could have a high risk over the project and it is the one…

    • 1051 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    Mcbride Financial Services

    • 4240 Words
    • 17 Pages

    References: APEGBC, (2009). Project Cost Control Basics. Retrieved July 22, 2010 from APGE website at…

    • 4240 Words
    • 17 Pages
    Powerful Essays
  • Better Essays

    Pontrelli Recycling

    • 1790 Words
    • 8 Pages

    Eichenberger, J. (1998). Project management, part III budgets for projects. AAOHN Journal, 46(5), 268-70. Retrieved from http://search.proquest.com/docview/1013462577?accountid=35812…

    • 1790 Words
    • 8 Pages
    Better Essays
  • Satisfactory Essays

    Introduction to Project Scheduling IX. The Critical Path Method (CPM) X. Program Evaluation and Review Technique (PERT) XI. Project “Crashing”…

    • 5350 Words
    • 1 Page
    Satisfactory Essays
  • Satisfactory Essays

    One of the most important factors to the success of a project is how well the project is estimated, as well as how overall costs are managed during the execution phase by the project manager. Project costs and estimates are vital to the success of any organization to remain competitive in the market. Cost estimating for organizations rely heavily on resources that can sometimes be difficult to obtain. Forecasting and utilizing historical return costs are just a couple of ways that organizations rely on estimating. Experienced planners are often a sought trade within the market; this paper will discuss some often used project cost estimating techniques.…

    • 746 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Week Dqs

    • 274 Words
    • 2 Pages

    Accurate estimates are critical to effective project management because having accurate time and costs estimates helps ensure the project is a success. Project control is dependent on accuracy of estimates, time and cost, estimates are major inputs to project planning. Estimates are used to support good decisions to determine project duration and cost. Used to develop time phased budgets and estimating helps reduce error. Project managers can take steps to improve the accuracy of estimating projects by using techniques to scope, constrain and plan the projects conditions, this will help reduce risks, and increase the project’s success.…

    • 274 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Risk Management Plan

    • 2116 Words
    • 9 Pages

    Chapman, C. B., & Ward, S. (2011). How to manage project opportunity and risk : Why uncertainty management can be a much better approach than risk management. Chichester, West Sussex; Hoboken, NJ: Wiley.…

    • 2116 Words
    • 9 Pages
    Powerful Essays
  • Good Essays

    Leung, H., Popescu, E., Cao, Y., Lau, R. W. & Nejdl, W. (2011, December). Advances in…

    • 3443 Words
    • 14 Pages
    Good Essays
  • Powerful Essays

    Apc310

    • 2771 Words
    • 12 Pages

    References: Field, M., Keller, L. (1998) Project Management. Open University Piff, S., Swift, L. (2006) Quantitative Methods for Business, Management and Finance. Palgrave 8|Page…

    • 2771 Words
    • 12 Pages
    Powerful Essays
  • Satisfactory Essays

    5. Lientz, Bennet P. and Kathryn P. Rea (1998). 2nd edition. Project Management for the 21st Century. San Diego, California: Academic Press. (ISBN-10: 012449966X).…

    • 1051 Words
    • 5 Pages
    Satisfactory Essays
  • Good Essays

    In my opinion, parametric procedures applied to specific tasks is a much better approach. This approach allows for the project manager to plan for the project by tasks to be completed. Time management, attention to details, and communication is important in the approach. Although, this approach is a bit time-consuming it allows all parties involved in the completion of the project to be accountable for quotas prior projects being started. Although the phase estimating approach allow for planning a project in different time frames, unfortunately the customer will want an accurate estimate of…

    • 344 Words
    • 2 Pages
    Good Essays
  • Better Essays

    Loch, C. H., DeMeyer, A., & Pich, M. T. (2006). Managing the unknown: A new approach to managing high uncertainty and risk in projects. Hoboken, NJ: John Wiley &…

    • 1404 Words
    • 6 Pages
    Better Essays
  • Satisfactory Essays

    This paper explores uncertainty-based management, which derives planning, monitoring and management style from an uncertainty profile comprising four types of uncertainty: variation, foreseen uncertainty, unforeseen uncertainty, and chaos. Although each uncertainty type is unique, a single project will typically display a blend of all four.…

    • 282 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Trophy Project

    • 6347 Words
    • 26 Pages

    Project Management – A systems approach to planning scheduling and controlling, 7th Edition, Harold Kerzner, PhD…

    • 6347 Words
    • 26 Pages
    Powerful Essays