|Renovation of Shea Stadium - | |
|Home of the New York Mets | |
Background
In November 2004 Ace Builders (your employer) was awarded a contract for the renovation of Shea Stadium to house the New York Mets. An artist rendition of the proposed renovations is shown in Figure 1.

Figure 1. Proposed stadium for the
New York Mets

The construction must start on January 14, 2004 and must be completed within fifteen months. Liquidated damages (penalty clause) of $250,000 per calendar day of delay beyond March 31, 2005 is written into the contract. On the other hand, Ace will receive an Early Completion Bonus of $100,000 per day for each workday the project is completed before March 31, 2005.

In order to meet this aggressive schedule, the project will require around the clock construction crews, detailed project management, good construction weather, and some modern construction techniques.

The project will begin with mobilizing equipment, preparing a staging area, and some minor demolition work - activities that are expected to last approximately eight weeks. Once the site is ready and all equipment mobilized, the work can start simultaneously on both the structure and the playing field.

The work in the field involves excavation for installation of a new subsurface irrigation, drainage and heating facilities. This activity is followed by actual installation of water and drain pipes, valves, heating and control circuits, etc. Installation of the subsurface facilities (fourteen weeks) is followed by filling of the playing field and track. Only with the completion of the backfill material needed for the drainage

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Soil Investigation: Prior to any foundation design or excavation work to take place, soil Geotechnical Investigation using process is carried out by a competent contractor, this to explore the surface and subsurface of each foundation. A CME-45B Truck Mounted Auger Drill is used retrieve soil samples, all samples are tested in an off-site laboratory. The truck operators are usually exposed to various types of…

    • 456 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    The project is pouring a concrete patio in my backyard. The results will be a new patio to entertain guests. I am allowing two additional weeks in case there is inadequate funding or scheduling conflicts for the project ending in May of 2008. The two extra weeks are there in case there is an unexpected expense elsewhere, or I can’t get my brother to my house to help out because of scheduling conflicts. Each activity is defined within a week’s time.…

    • 784 Words
    • 4 Pages
    Satisfactory Essays
  • Good Essays

    Jim Brown

    • 770 Words
    • 4 Pages

    The reasons that we propose this are because that this is the method that will save the company the most time. Not only does it save the company time, but if the company were to ever fall into trouble with labor union strikes, this plan is guaranteed to be the most cost effective when facing with the steep penalties of not meeting the time limit. In addition if everything goes very smoothly the company will finish the project 8 weeks earlier than expected and save money on overhead expenses.…

    • 770 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    essay

    • 684 Words
    • 3 Pages

    Federal, state and local regulations and agency’s affect REI as well as every other business. The Federal Trade Commission regulates competition to avoid unfair practices. The Consumer Protection Agency helps protect the health and safety of consumers. Since REI has many private label products they must make sure that they are safe to avoid…

    • 684 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Ghost Stories

    • 749 Words
    • 3 Pages

    * Ask from the headquarter construction firm to provide him a number of workers either from the main office or countries around to enable the project to be finished in predefined time frame. However, administrative staff coordination may cause the project excessive cost.…

    • 749 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Toc in Project Management

    • 1123 Words
    • 5 Pages

    Most projects, whether big or small, are undertaken either to create a new structure, such as a plant, an airport, an Olympic stadium, a bridge, a new product, etc., or to modify an existing structure, such as a plant expansion, adding a new production line, expanding a highway, etc. In most cases, the late completion of the project, such as finishing the Olympic stadium two weeks after the opening of the Olympics, or having a new airports' opening delayed until after the elections, etc., generally carries with it some significant negative ramifications for the project owner. At the same time, there are many cases where the early completion of the project will provide the project owner with significant positive ramifications, such as the market share gained by preempting the competitions' launching of a new product, or the increase in sales achieved by bringing the plants productive capabilities on-line sooner, etc.…

    • 1123 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    MY Work of the century

    • 1924 Words
    • 8 Pages

    Brown, Maury. "Atlanta Braves Plan On Moving Into New $672 Million Ballpark In Cobb Co." Forbes. Forbes Magazine, 11 Nov. 2013. Web. 17 Nov. 2013.…

    • 1924 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    Statement of Work

    • 1946 Words
    • 8 Pages

    The complete wiring of the two buildings will be completed within a twenty-four hour window.…

    • 1946 Words
    • 8 Pages
    Good Essays
  • Powerful Essays

    Bibliography: Glavinich, Thomas. Construction Planning and Scheduling. Edited by Second Edition. The Associated General Contractors of America.…

    • 1984 Words
    • 8 Pages
    Powerful Essays
  • Satisfactory Essays

    Kachare Ki Samasya

    • 1083 Words
    • 5 Pages

    2. Despite our best efforts and deployment of required resources at site, the contract could not gather the required pace of construction and resulted in this un-avoidable time over-run. Various reasons causing the delays in execution have been brought to notice of the Project Manager from time to time. Completion of this contract by the above-mentioned scheduled date had thus not been possible. We now request you to kindly consider the following grounds and revise the completion date by granting extension of time for Phase-II & Phase-III up to 30.06.2014 : -…

    • 1083 Words
    • 5 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Chief

    • 2199 Words
    • 9 Pages

    Level: 3 Assignment Code: SIM335 Issue date: 12 November 2012 Contribution to module assessment: 100% dition, a This is an individual assignment - complete both tasks 1 and 2 Background: The assignment is intended to bring out the benefits and limitations of different approaches to project planning and control by relating these to the circumstances in the cases outlined. It is also intended to allow students to demonstrate their learning and competence in respect of the management of resources generally, but in particular elements of scope, schedule, quality, and cost. Case 1: Mangeist Ltd is an organisation which provides plant and materials to the building sector. These products include: Cement Mixers, Dump Trucks, Compressors and Pneumatic Drills, Lighting rigs, and Vibrating Plates. As part of your job as the Mangeist Ltd special projects manager, you have produced a list of activities that need to be addressed to source a new range of industrial forklift trucks for supply to the sector. The details are shown in the table provided. Please note: You must use the methodology detailed above table 1 headed “essential methodology”. Task 1 (40% marks) 1) Draw the network diagram (use activity on the node). (8 marks) 2) Explain how you determined the timing of activities and the total float. (6 marks) 3) Explain how you determined the project duration and the critical path. (6 marks) 4) If the project starts on the Monday 7 January 2013, what is the earliest date it can be completed using a 5 day working week? Assume no other holidays (explain how you calculated the figure). (4 marks) 5) If the following happened what would be the effect on the duration of the whole project? Explain the reasons. (6 marks) a) Activity B is delayed 1 day. b) Activity P is delayed 1 day. c) Activity 0 is delayed 2 days 6) Explain the limitations of Network diagrams. (10 marks) Module: SIM335 Managing Projects Module Leader: Michael Cassop-Thompson Return…

    • 2199 Words
    • 9 Pages
    Satisfactory Essays
  • Satisfactory Essays

    It involves the choice of technology, the definition of work tasks, the estimation of the required resources and durations for individual tasks, and the identification of any interactions among the different work tasks. A good construction plan is the basis for developing the budget and the schedule for work. Developing the construction plan is a critical task in the management of construction, even if the plan is not written or otherwise formally recorded. In addition to these technical aspects of construction planning, it may…

    • 315 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Ncp 26

    • 2849 Words
    • 12 Pages

    Most projects start with a need to have a new facility long before designers start designs and drawing of the projects and certainly before field construction work can commence. Elements of this phase include:…

    • 2849 Words
    • 12 Pages
    Powerful Essays
  • Satisfactory Essays

    Subject and Verb

    • 276 Words
    • 2 Pages

    9. I was told that as finalisation of design plans is pending, construction would only start in 2014 and that the developers would be given 36 months to complete the project.…

    • 276 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Essay

    • 1468 Words
    • 6 Pages

    Advertisement is play important role in our life . Advertisement give us information about different products. Here I would like to describe about my favourite advertisement is a jaggo garahak jaggo. I saw this advertisement daily on television. In this advertisement one little boy went to medical shop to buy some medicine. The shopkeeper cleverly gave him expire medicine,but boy check manufacture and expiry date of the medicine. Boy was also clever he gave based coin to shopkeeper. then shopkeeper relize his mistake. We learn to so many things in this advertisement like we should always check manufacture and expiry date of the products because if we are use these product then we can face some elregy and bad effect . this advertisement aware the people, so I like this very much. I do not want to gave any suggestion to this advertisement because according to me it is complete information package…

    • 1468 Words
    • 6 Pages
    Good Essays