Preview

Chief

Satisfactory Essays
Open Document
Open Document
2199 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Chief
Faculty of Business and Law
Level: 3 Assignment Code: SIM335 Issue date: 12 November 2012 Contribution to module assessment: 100% dition, a This is an individual assignment - complete both tasks 1 and 2 Background: The assignment is intended to bring out the benefits and limitations of different approaches to project planning and control by relating these to the circumstances in the cases outlined. It is also intended to allow students to demonstrate their learning and competence in respect of the management of resources generally, but in particular elements of scope, schedule, quality, and cost. Case 1: Mangeist Ltd is an organisation which provides plant and materials to the building sector. These products include: Cement Mixers, Dump Trucks, Compressors and Pneumatic Drills, Lighting rigs, and Vibrating Plates. As part of your job as the Mangeist Ltd special projects manager, you have produced a list of activities that need to be addressed to source a new range of industrial forklift trucks for supply to the sector. The details are shown in the table provided. Please note: You must use the methodology detailed above table 1 headed “essential methodology”. Task 1 (40% marks) 1) Draw the network diagram (use activity on the node). (8 marks) 2) Explain how you determined the timing of activities and the total float. (6 marks) 3) Explain how you determined the project duration and the critical path. (6 marks) 4) If the project starts on the Monday 7 January 2013, what is the earliest date it can be completed using a 5 day working week? Assume no other holidays (explain how you calculated the figure). (4 marks) 5) If the following happened what would be the effect on the duration of the whole project? Explain the reasons. (6 marks) a) Activity B is delayed 1 day. b) Activity P is delayed 1 day. c) Activity 0 is delayed 2 days 6) Explain the limitations of Network diagrams. (10 marks) Module: SIM335 Managing Projects Module Leader: Michael Cassop-Thompson Return

You May Also Find These Documents Helpful

  • Powerful Essays

    PROJ 592

    • 2367 Words
    • 10 Pages

    To bring the schedule in line with what the customer wanted, the corrective action I would recommend are managing the triple constraints; time, cost and scope. Builder, the ride supplier, steam fitter and electricians are performing the worst, based on the analysis. Max capacity for a builder is 600% and the max capacity for ride supplier is also 600%. Builder appears to be the lowest cost of $65.00/hr. and ride supplier is $100/ hr. I would recommend…

    • 2367 Words
    • 10 Pages
    Powerful Essays
  • Satisfactory Essays

    The following data were obtained from a project to build a pressure vessel: Activity Duration Predecessors A 6 weeks --- B 6 weeks --- C 5 weeks B D 4 weeks A, C E 5 weeks B F 7 weeks D, E, G G 4 weeks B H 8 weeks F I 5 weeks G J 3 week I Step 1: Construct a network diagram for the project. Step 2: Answer the following questions: (15 points total) a) Calculate the scheduled completion time. (5 points) b) Identify the critical path (6 points) c)…

    • 556 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    QAT1 Task 4

    • 501 Words
    • 7 Pages

    E 7.5 14 12.5 19 6.5 F 7 7 17 17 0 CRITICAL G 17 17 23.5 23.5 0 CRITICAL H 18.5 19 29.5 30 0.5 I 23.5 23.5 30 30 0 CRITICAL J 30 30 33.5 33.5 0 CRITICAL a. Duration of project: 33.5 weeks b. Slack for task A: 6.5 weeks c. Slack for task H: 0.5 weeks d. Task F scheduled start: week 7 e. Task I scheduled completion: week 30 4.…

    • 501 Words
    • 7 Pages
    Satisfactory Essays
  • Best Essays

    Is3350 Unit 1 Assignment

    • 3307 Words
    • 14 Pages

    For this purpose the company has hired our services in order to manage the whole project. This project is to be split into two major parts; first, the construction of a new premises and second, the transfer of resources from old to new premises. The project manager therefore, needs to plan the whole project first with taking all areas of the project into consideration so that nothing is left behind one of the most reliable and suggested to do this is through using the Work Breakdown Structure (WBS). This will allow the manager to have a wide-ranging grip into all concerned areas of the project, by breaking the project into smaller tasks and assigning these tasks to individuals who are considered most suitable for them. This will enhance the level of specialisation and expertise implied into the project by planning all the phases of the project with specialised human as well as capital…

    • 3307 Words
    • 14 Pages
    Best Essays
  • Satisfactory Essays

    Managerial Statement: The expected duration of the project is 31 working days. Critical Activities are I, J, K, L, and M.…

    • 678 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Is305 Project 1

    • 2310 Words
    • 10 Pages

    The project is divided into three major deliverables and four smaller assignments as detailed below:…

    • 2310 Words
    • 10 Pages
    Satisfactory Essays
  • Good Essays

    mis 302

    • 1114 Words
    • 5 Pages

    Project Management Activities: Planning-Objectives Resources Work Break-down Structure Organization Scheduling- Project Activities, Start & End Times, Activity Network Controlling-Monitor, Compare, Revise, Action Work Breakdown Structure: WBS is a hierarchical decomposition of the project into phases, deliverables and work packages. 1.Project 2. Major Tasks in the project 3. Subtasks in the major tasks 4.Activities (or “work packages”) to be completed Project Controlling: Close monitoring of Resources, Costs, Quality, Budgets. Feedback enables revising the Project Plan and Shift Resources. Computerized tools produce extensive reports Six Steps PERT & CPM: 1. Define the Project and prepare the Work Breakdown Structure 2. Develop relationships among the activities - decide which activities must precede and which must follow others 3. Draw the network connecting all of the activities 4. Assign Time and/or Cost Estimates to each activity 5. Compute the longest time path through the network – this is called the Critical Path 6. Use the network to help Plan, Schedule, Monitor, and Control the project Perform a Critical Path Analysis: The Critical Path is the Longest Path Through the Network…

    • 1114 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Master Chief

    • 1160 Words
    • 5 Pages

    John is a Commander who works on the INFINITY. John travel the universe on the INFINITY and does special missions on planets with his Squad, Which the ituxi took over. John is a Master Chief he is a spartan. Spartans get armor which increases strength and speed and agility. Master Chiefs are the best of the spartans, and John was the first to become a Master Chief.…

    • 1160 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Scavenger Hunt

    • 922 Words
    • 4 Pages

    7. What are the three projects and when are they due (day, date, and time)?…

    • 922 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    The critical activities are B, C, E, F, H, J and K. The project should be completed (earliest finish) in 43 weeks - therefore R.C. Coleman’s 40 week completion time cannot be achieved. The probability of R.C. Coleman meeting the 40 week deadline is ~10%. This is a low chance, so they should be cautioned if they make 40 weeks their deadline.…

    • 656 Words
    • 3 Pages
    Powerful Essays
  • Satisfactory Essays

    Write a 4- to 6-page paper that analyzes a work-related project using systems analysis for a selected business system at the departmental or divisional level.…

    • 501 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    “Let your fear of failure be your reason to succeed” ~ Chief Master Tom Crecelius. What describes me? What makes Nick Riddell tick? Depending upon whom you ask, you would receive drastically different answers. Some people would suggest that I am a wee bit… well, excessively “big for my britches”. Narcissistic, show off, self righteous, etc… also may be mentioned. But, some would characterize me as a confident, diligent, unfaltering, and very devoted. Personally, I find myself to be very confident, zealous, and highly competitive.…

    • 248 Words
    • 1 Page
    Satisfactory Essays
  • Satisfactory Essays

    Rccoleman

    • 850 Words
    • 4 Pages

    Develop a report that presents the activity schedule and expected project completion time for the warehouse expansion project. Include a project network in the report. In addition, take into consideration the following issues:…

    • 850 Words
    • 4 Pages
    Satisfactory Essays
  • Good Essays

    Sergeant

    • 934 Words
    • 4 Pages

    The study of leadership can be traced back centuries. In the 1890s, began the study of the came the advent of scientific management, or Taylorism. This was a theory of management that analyzed and synthesized workflows whose main objective was improving economic efficiency. (Scientific Management, 2011) One of the pioneers in the field of management consulting in the industrial world was Mary Parker Follett. Mary Parker Follett was an amazing woman whose accomplishments included, but were not limited to, author of many books in the fields of democracy, human relations, political philosophy, organizational behavior, conflict resolution, and psychology; one of the first women ever invited to address the London School of Economics, and was even sought out by the President of the United States to be his personal consultant on managing non-profit, non-governmental, and voluntary organizations.…

    • 934 Words
    • 4 Pages
    Good Essays
  • Good Essays

    1.3 Explain the project-planning methodologies appropriate to the types of projects run and the tools that can be used to assist project planning and control…

    • 1213 Words
    • 5 Pages
    Good Essays