Kachare Ki Samasya
Ref: NKG/MAP/PH-II/GEN/167 Date: 04/12/2012

To,
Dte Gen Md Accn Project,
E-in-C’s Branch,
Integrated HQ of MOD (Army),
Kashmir House, Rajaji Marg,
New Delhi-110011

C A NO: DG MAP/PHASE-II/PKG-35/NAVY/17 OF 2010-2011 : CONSTRUCTION OF DWELLING UNITS INCLUING ALLIED SERVICES FOR OFFICERS/JCOs/OR AT GOA (VASCO)

SUBJECT: EXTENSION OF TIME
Dear Sir,

1. The subject work of 25-month duration was awarded to us on 26.08.2010. The work at site, as per work order No 1, was ordered to be commenced on 06.09.2010 and scheduled for completion in phases with phase II and III completion by 05.03.2010 and 05.10.2012 respectively. Phase –I works have already been completed.

2. Despite our best efforts and deployment of required resources at site, the contract could not gather the required pace of construction and resulted in this un-avoidable time over-run. Various reasons causing the delays in execution have been brought to notice of the Project Manager from time to time. Completion of this contract by the above-mentioned scheduled date had thus not been possible. We now request you to kindly consider the following grounds and revise the completion date by granting extension of time for Phase-II & Phase-III up to 30.06.2014 : - (a) We would like to bring to your notice that even after MAP Phase-I site and Nofra-II Structure completed upto terrace level in April 2012. Consultants had issued the revised structural details of Lift machine room slab/beam,Staircase mumty slab/beam and Overhead water tank of MAP Phase-I vide letter ref no:8001/MAP PH-II.244/E8 dt.06/12/2012. The structural details of Lift m/c room slab/beam, staircase mumty slab/beam, overhead tanks of Nofra-II & Nofra-I , not yet issued to us. (b) The structural details of P404 from foundation level to terrace level has been changed drastically and changed drawings have been issued to us vide letter no: 8001/MAP PH-II/218/E8 dtd 06/09/2012. We had asked for

You May Also Find These Documents Helpful

  • Satisfactory Essays

    The site visits for the unit 2 assignment started whilst general civil works were taken place, this involve foundation works for tanks, buildings, turbine rooms, paving and culverts for underground piping, etc. There were various types of work activities that range from Shallow to Deep foundations. Refer to photos in appendix 1 for further clarification.…

    • 456 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    The within Statutory Building Scheme is declared by Castle Rock Estates Ltd., as Grantor, this 1st…

    • 4961 Words
    • 20 Pages
    Powerful Essays
  • Powerful Essays

    • The project schedule is liberal in respect to time for completion of each phase, because not keeping up with the…

    • 1244 Words
    • 5 Pages
    Powerful Essays
  • Powerful Essays

    8 CONSULTANT’S PROPOSED DESIGN & CONSTRUCTION SCHEDULE ........................... 8 CONSULTANT DESIGN SCHEDULE ........................................................................................ 9 BID DOCUMENT CONSTRUCTION SCHEDULE…

    • 13739 Words
    • 88 Pages
    Powerful Essays
  • Good Essays

    Toolik Trips: Case Study

    • 1611 Words
    • 7 Pages

    CPS (Smith) to update Kanger site plan and building layout drawings. Sent to NSF on April 21st. Complete…

    • 1611 Words
    • 7 Pages
    Good Essays
  • Satisfactory Essays

    project management course

    • 1335 Words
    • 6 Pages

    THE INSURED PREMISIS CONSISTS OF FACE BRICK AND PLASTER HOUSE PITCH DOUBLE ROMAN TILED ROOF, DOUBLE GARAGE, SMALL MAXI BRICK WALL ON TWO ADJACENT SIDE’S OF THE STAND AND PAVING.…

    • 1335 Words
    • 6 Pages
    Satisfactory Essays
  • Good Essays

    Once on site, your team had discovered a range of difficulties with the project, starting with fundamental design faults and extending deep into the manufacturing processes. It is clear that various contracts will be breached, and litigation is likely to follow. Your team has produced a prioritised list of actions and begun working to establish a revised schedule to take the project to completion.…

    • 743 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Operational Management

    • 1120 Words
    • 5 Pages

    The contractor has given a time frame of three months from start until completion of the project taking into account disruptions caused by the weather.…

    • 1120 Words
    • 5 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Purlindesignguide

    • 43635 Words
    • 175 Pages

    This guide is an extract from the Dimond Structural Systems Manual and it is to be read in conjunction with the full Dimond Structural Systems Manual available at www.dimond.co.nz under the Architects/Specifiers section. This guide will not be updated by Dimond and it is intended that the user updates this guide using the current Dimond Structural Systems Manual on our website.…

    • 43635 Words
    • 175 Pages
    Satisfactory Essays
  • Powerful Essays

    17. Peter A. Bullen, Peter E.D. Love, (2011) "Adaptive reuse of heritage buildings", Structural Survey…

    • 15061 Words
    • 61 Pages
    Powerful Essays
  • Good Essays

    o Construction Quality – Structural quality of the project is backed by the track records of the…

    • 454 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Sony Marketing Strategy

    • 2456 Words
    • 10 Pages

    Project Work by Group D Mohd Razali Mohd Sarip (16) Hamirulizam Abdul Hamid (10) Foad Khan Abdul Rahim (9)…

    • 2456 Words
    • 10 Pages
    Powerful Essays
  • Satisfactory Essays

    The completely finished slab can be used as intermediate floor for living also in residential buildings, balcony projections can be provided along the partially precast joists, designed with an overhang carrying super imposed loads for balcony as specified in IS: 875-1964, in addition to the self-load and the load due to balcony railings. The main reinforcement of the overhang provided at the top in the in-situ concrete attains sufficient…

    • 841 Words
    • 4 Pages
    Satisfactory Essays
  • Best Essays

    Demand

    • 1175 Words
    • 5 Pages

    In response to your telephonic request on 02.10.2012, regarding the subject matter. A proper survey and inspection were carried out on 03.10.2012 to examine the proposed property and to evaluate the exact value of the property. The valuation of the property is as follows :…

    • 1175 Words
    • 5 Pages
    Best Essays
  • Satisfactory Essays

    Soft Copy

    • 306 Words
    • 2 Pages

    Fee: Rs.40, 000/= (Exclusive of Exam Fee) Entry test will be conducted before the enrolment for the Diploma Course Course Contents: Preparation of BOQ for major construction works and Civil works, Preparation of bidding documents, Procurement Methods, Interim valuation, Manage work place information & Communication, Plan work to be performed in the work place, Provide leadership & facilitates work teams. Lecture Panel: Conducted by Charted Quantity Surveyors, University Lectures & Charted Engineers. Accommodation: On request 285/= (Inclusive of Gov. Tax) Venue: CHPD – Pelawatta - Battaramulla. / Tel. No: 011-2785661, 011-2785628 / Fax: 2785629 Forward your application on or before 31st December 2012 including copy of certificates to: Assistant Director, Centre…

    • 306 Words
    • 2 Pages
    Satisfactory Essays

Related Topics