BPR Case Study Honeywell
Name: Justin Dean
ID: 12232

A BPR case study at Honeywell Inc.

Summary
In this case study it has been explained how Honeywell Inc. has gone through a radical change by implementing the BPR strategies and developed a set of 10 general lessons which are as follows:
Lesson one: People are the key enablers of change
Lesson two: Question everything
Lesson three: People need a systematic methodology to map processes
Lesson four: Create team ownership and a culture of dissatisfaction
Lesson five: Management attitude and behavior can squash projects
Lesson six: Bottom-up or empowered implementation
Lesson seven: BPR must be business-driven and continuous
Lesson eight: IT is a necessary, but not a sufficient, enabler
Lesson nine: Set stretch goals
Lesson ten: Execution is the real difference between success and failure
Introduction:
Honeywell Inc. in Phoenix, Arizona teaches us a set of lessons to help others transform successfully. The Honeywell industrial automation and control (IAC) business unit designs, manufactures, and configures the sophisticated TDC 3000X family of systems. These systems enable its customers (refineries, chemical plants, and paper mills around the world) to achieve world-class process-control capability.
In late 1989, the management team began a three-year world-class manufacturing (WCM) program to examine lagging performance results. WCM established ambitious goals for defect reduction, short-cycle production, and materials management. Specific goals included reducing defects by a factor of ten (1,000 percent) and cycle time by a factor of five (500 percent). WCM was created to provide resources and take a system-wide view of the plant. WCM supported a focused-factory environment that harnesses the potential of teams. Instead of workers being assigned to a specific area on the factory floor, teams of multi-skilled workers were charged with building entire products or modules from start to finish.
WCM provided resources to teams based on the

You May Also Find These Documents Helpful

  • Powerful Essays

    As students of Operations Management, we were charged with visiting a manufacturing or service facility and to present and report on our observations. Since all of the members of our group have either worked in or visited a service facility, we were excited with the opportunity to visit a manufacturing plant as part of this project. A few emails and phone calls later, we had organized a tour of The Campbell Company of Canada’s manufacturing facility, in Etobicoke.…

    • 1111 Words
    • 5 Pages
    Powerful Essays
  • Good Essays

    MBA 575 Case 5

    • 871 Words
    • 3 Pages

    Rob Dander, project manager in the Operation Research Department (ORD) was charged with managing a large computer project for Antar’s new manufacturing process. Dander was assigned three assistants to help with this project, all with different experience levels. The team was to function as a high-performance product development team, however they lacked sufficient tools to do so. “The primary problems of poor communication and poor coordination of typical product development processes in organizations can be rectified by creating self-managing, cross-functional product development teams” (Griffin and Moorhead, 2014). Implementing an effective revamp of Antar’s manufacturing process with the installation of a robotics system lay in the findings of Dander’s team. “The ORD would run a full-scale simulation of the entire manufacturing process and determine the working requirements that would optimize production while lowering costs. A major concern of management was to establish a program that would occupy minimal computer time and which could easily adapt to changing parameters and inputs. A secondary objective was to use the simulation to train operators on how to manipulate the new computer monitors which automation would bring” (Seijts, 2006). Thus, it is clear that management had a large investment in the outcome of the project with the company’s need to stay competitive in the market by cutting manufacturing costs.…

    • 871 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Disillusionment with Naos

    • 1188 Words
    • 5 Pages

    In the past three decades or so, Western manufacturers have pursued world-class manufacturing status through a shotgun blast of three-letter acronyms: TQM (total quality management), JIT (just-in-time production), DFM (design for manufacturability), QFD (quality function deployment), QPD (quick product/process development), CIM (computer integrated manufacturing), ERP (enterprise resource planning), SCM (supply chain management), CRM (customer relationship management), and so on. The power of these NAOs (new approaches to operations) in improving quality, production scheduling, product development, supplier management, etc. has been forcefully demonstrated in a number of leading companies such as AT&T, Hewlett-Packard, Motorola, Xerox, etc. leading thousands of others to strive to emulate them and their Japanese role models.…

    • 1188 Words
    • 5 Pages
    Powerful Essays
  • Powerful Essays

    Riordan Manufacturing must implement a quality improvement process to reduce turnover rates, costs, errors, and scrap and rework, along with increase productivity and efficiency. Team B proposes to install a CMM (Coordinate- Measuring Machine) to the already linked information technology (IT) computer system Riordan has set up. The following 10 steps outline the TQM process and implementation plan to accomplish this:…

    • 2187 Words
    • 9 Pages
    Powerful Essays
  • Better Essays

    Baggage handling is at the heart of an airport. The automated baggage handling system at the Denver International Airport (DIA) was a huge undertaking. Not only would it be the largest system of its kind in the world but also the most expensive. Originally designed for only one airline, United Airlines, it grew to encompass all terminals within the airport. This enormous project had its inherent risks and uncertainties, and encountered many emerging problems. As a result, the project caused massive delays of the airport opening and budget overruns. It was regarded as a huge failure and a textbook example of how an IT project could go wrong.…

    • 5035 Words
    • 21 Pages
    Better Essays
  • Best Essays

    Product quality and production efficiency augmented as a result of implementing new technologies and new manufacturing approaches, as in example: Lean manufacturing, quality circles, self-directed work groups, and people empowerment. “NUMMI with some 170 robots is less automated than several of GM’s newer plants. Plans are to reach an annualized 200,000 units in 1986 with a work force of 2,500 – a level which rivals Japanese productivity” (Rehder et al., 1985, p. 38).…

    • 3364 Words
    • 14 Pages
    Best Essays
  • Powerful Essays

    The Goal Summary

    • 1586 Words
    • 7 Pages

    A Review and Analysis of The Goal: Looking Deeper into the Manufacturing and Business Processes Presented…

    • 1586 Words
    • 7 Pages
    Powerful Essays
  • Satisfactory Essays

    Bpr - Erp Case Study

    • 557 Words
    • 3 Pages

    Information Technology (IT) can be one of the biggest obstacles if they are handled with care while carrying out BPR. If the IT is not properly aligned with business goal, then the resultant process will not produce desired results. The heritage of the legacy systems present in the organization is another IT obstacle. Legacy systems might not be under control due to the fact that they do not have enough documentation, historical measurements, and change control processes. Legacy system’s scope and complexities which are not known must be taken at the same priority as the organizational and cultural structures during the process reengineering. These are the few obstacles posed by the IT to the BPR.…

    • 557 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Wal-Mart has difficulty developing and implementing a process that can improve the product material quality since there are so many vendors, manufacturers and international companies involved. They need to implement a set of standards that every company needs to adhere to by setting acceptable standards that must be met across the board whether the company is a local business or a foreign company. Most of the material defective products come from overseas. The process that can afford the opportunity to fix this dilemma is the process known as Six Sigma. This method is designed to manage process variations which cause defects. The concept of this process is to take an already established defect variation and use a step-by-step chain of events that will work towards managing variation in order to eliminate the established acceptable defects. The purpose behind selecting this process is because Six Sigma has the ability to provide high-performance, reliability, and value to the products Wal-Mart purchases which offers a better quality product to the customer. The process was originated by Bill Smith while working at Motorola in 1986. The process was initially defined as a metric for measuring defects and improving quality which would set precedence and standardize defective measures for all vendors and suppliers for Wal-Mart.…

    • 1864 Words
    • 8 Pages
    Powerful Essays
  • Powerful Essays

    Sdlc Business Process

    • 4548 Words
    • 19 Pages

    As discussed in class, if it costs $1 to fix an errror in the planning phase of the SDLC, approx how much would it cost to fix that same error in the implementation phase?…

    • 4548 Words
    • 19 Pages
    Powerful Essays
  • Better Essays

    Bp Operations Failure

    • 1220 Words
    • 5 Pages

    These aspects helped BP’s executive committee develop a clear and concise vision statement for the new operating management system that was officially launched in 2008. The vision statement claims “Our operating management system (OMS) provides a group-wide framework to drive a rigorous and systematic approach to safety, risk management and operational integrity across the company” (BP, 2011). The actual framework of the OMS system is divided into eight equal segments and describes how people, processes, plant and performance are required to operate throughout BP. The eight segments consist of privilege to operate, risk, procedure, assets, optimization, organization, leaders and results.…

    • 1220 Words
    • 5 Pages
    Better Essays
  • Good Essays

    Wriston Manufacturing

    • 1034 Words
    • 5 Pages

    Operationally, the Detroit plants is manufacturing products at low-volume and with significant diversity in regards to product type. This increased complexity and variability equates to a ‘job shop’ environment, as opposed to a ‘flow shop’; which is the manner in which most counterpart plants are operating. The Detroit plant is unique in that it is not only manufacturing all three product lines, making it very complex, but the lack of corporate support has led to significant demoralization of human resources, which is having a tangible impact and strain on ongoing production. Due to the diverse product range, but inversely beneficial low production quantity, Detroit is unable to leverage economies of scale; also contributing to large overhead costs. Unpredictability and erraticism in production-need do not appear conducive to the innovation and streamlining initiatives consistent with corporate strategy. The lack of support, financial and operational, appears to have diminished capital investment, resulting in the retention of longstanding and…

    • 1034 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    MU1 Assignment 2

    • 1726 Words
    • 6 Pages

    In manufacturing companies, production is usually the most important aspect of the entire process mostly due to the high cost incurred, the staffing and the complexity of the departments involved –…

    • 1726 Words
    • 6 Pages
    Powerful Essays
  • Better Essays

    Change Management, if implemented well, has the ability to make transitions positive, possible and profitable. It goes without saying that change is a part of life. From the moment we are born until the moment we pass away, change is occurring in us and around us. That being the case, it needs to be clearly stated that organizations, companies and institutions are much like individuals. No organization is able to exist without the people that work within their walls or the clients that utilize their services or products. If change is inevitable and constant then, why do so many people resist change? I would argue that while some people may be resistant to change, they are more likely to resist the act of being changed. I will discuss why people resist being changed. I will also talk about why some organizations are successful in the art of change management and why some organizations fail miserably. Finally, I will look at the impact of change management on project success or failure using case studies and personal experience. Change is indeed a part of life and change management needs to be recognized as having a significant role in success of any project.…

    • 2603 Words
    • 11 Pages
    Better Essays
  • Powerful Essays

    As Toyota established itself in the US automotive industry, other players watched in admiration as Toyota plants around the world boasted consistent production of higher quality cars, fewer worker-hours, lower inventory, and fewer defects than any other competitor (Duvall, 2008). Many credited Toyota’s continued success and its ability to roll a new Camry, Avalon, or Solara off of the assembly line every 55 seconds to its application of its core competency, the Toyota Production System (TPS) (Duvall, 2008). Among the various characteristics of this system that made it a success were concepts such as just in time production, real time defect monitoring and correction, waste reduction, and other process knowledge that offered Toyota a sustainable competitive advantage. Toyota’s unrelenting approach in manufacturing was eventually recognized simply as “The Toyota Way”.…

    • 2274 Words
    • 10 Pages
    Powerful Essays