Preview

Week 7 Discussion

Good Essays
Open Document
Open Document
960 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Week 7 Discussion
KMGT-680-2A: Introduction to Project Management
Discussion Question (7)
H000319111

When a project comes to an end successfully, it shows that it was handled well which creates an avenue for more projects in the future. The experiences gotten by the team members will increase and they will work well because they have been appraised from the just concluded one. The reputation of the company is also rated high because the PM and the team have performed but the reverse will be the case if clients have complains from completed projects.
The PMLC is an aspect that should be carried out properly because it tells how well the preparation was done eg, planning, scoping lunching and control and monitoring. The ceremonial and formal processes are ways in which a PM can know if his/her client is happy with the outcome of the project and it simply shows the actions taken towards every task to meet the stakeholder’s requirement (Wysocki, pg.313). Before a project starts, there must be an agreement between the PM and the stakeholder. If the PM carries out all that was agreed to do during the scoping and planning phase, and he meets up with the time and budget, the stakeholder will be excited.
At the completion of every project, it is always good to hand over to the client in good condition and he should be put through on how things are operated ie, testing of equipment and presentation. This will go a long way in the rating of the firm and the PM. For instance, if a hospital is built and furnished and the building is not well done even though it was properly equipped, the sight of the poorly finished building will go a long way negatively to affect the reputation of the firm in charge of construction and that of the PM.
POST PROJECT APPRAISAL
This process is to check how well the project was executed. This proposed work is compared with what is on ground; the difference between the two can create an avenue for improvement on new projects. The consent of the end users is



References: Dimitrios,L. (2007) The Implementation of Project Closeout and Review. Retrieved 06, 2013, http://ezineArticles.com/?expert =Dimitrios Litsikakis Getting a Client’s Final Acceptance: Benefits & Risks. Studymode.com Retrieved 07, 2011,http://www.studymode.com./essays/Getting-A-Client-s-Final-Acceptance-Benefits-737105.html. Wysocki,R.K .(2012) Effective Project Management: traditional, agile, extreme. 6th edn. Indianapolis: Wiley Publishing, Pp. 311-320 Young, (2003), the handbook of Project Management: A Practical Guide Policies and Procedures, 2nd ed. Kogan Page, UK. p256.

You May Also Find These Documents Helpful

  • Satisfactory Essays

    PMBOKV4 ITTO 42 Processes

    • 1835 Words
    • 46 Pages

    ©2009 PMServicesNW. All rights Reserved. Page 1 of 9 Project Management Process…

    • 1835 Words
    • 46 Pages
    Satisfactory Essays
  • Powerful Essays

    Project Management Institute. 2004. A Guide to Project Management Body of Knowledge Third Edition. Pennsylvania, USA: Project Management Institute, Inc…

    • 13536 Words
    • 144 Pages
    Powerful Essays
  • Satisfactory Essays

    Larson, E. W. & Gray, C. F. (2006). Project Management: The Managerial Process. USA: McGraw- Hill International.…

    • 414 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Week four’s focus on the project execution process was beneficial. I was not as familiar with the procurement management process as I am with quality, risk, and communication management. This week I was most comfortable with communication management and the tools and techniques for distributing formal communication. Communication management is something I have to do daily to ensure my department has the information necessary to meet goals, which is similar for the information required of a project team. I also felt comfortable with the risk management plan and recently have been participating in a project to review all process and procedures of our service teams. The focus of this project is to identify a standard process but also identify the risks of…

    • 755 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    References: Gray, C. F., & Larson, E.W. (2006). Project management: The managerial process (3rd Ed.).…

    • 1869 Words
    • 19 Pages
    Powerful Essays
  • Better Essays

    Project Management Institute. (2000). _A Guide to the Project Management Body of Knowledge (4th ed.)._…

    • 1150 Words
    • 6 Pages
    Better Essays
  • Satisfactory Essays

    Resources: Ch. 11 of Essentials of Management Information Systems. See pages 386 to 394 for information on Project Management. This section covers everything you need to know in this assignment. The assignment must follow APA formatting and use proper citations and references. Include citations of the textbook within the paper in addition to providing a reference page…

    • 321 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Pmp 42 Processes

    • 878 Words
    • 4 Pages

    Description The process of developing a document that formally authorizes a project or a phase and documenting initial requirements that satisfy the stakeholder's needs and expectations. The process of documenting the actions necessary to define, prepare, integrate, and coordinate all subsidiary plans. The process of performing the work defined in the project management plan to achieve the project's objectives. The process of tracking, reviewing, and regulating the progress to meet the performance objectives defined in the project management plan. The process of reviewing all change requests, approving changes, and managing changes to the deliverables, organizational process assets, project documents, and the project management plan. The process of finalizing all activities across all of the Project Management Process Groups to formally complete the project or phase. The process of defining and documenting stakeholders' needs…

    • 878 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Close Out Requirements

    • 2039 Words
    • 9 Pages

    The major activities in the Closeout Phase are shown in the diagram below, (Figure 1.1) consist of tasks that are typically administrative and logistical in nature. Initially, the focus is on performing the tasks associated with dispensing and reconciling personnel, property, and funding. When these tasks are finished, the attention of the project manager is focused on documentation of lessons learned and project closure. At some predetermined point, a Post Implementation Review of the project deliverables is conducted. The primary documents prepared during this phase include the Project Transition Checklist, Project Closeout Report, and Post Implementation Report.…

    • 2039 Words
    • 9 Pages
    Powerful Essays
  • Powerful Essays

    Dia Communication Plan

    • 6799 Words
    • 28 Pages

    Kerzner, H. (2004). Advanced Project Management: Best Practices on Implementation, 2nd Edition. Copyright © 1999-2012Books24x7, Inc. and Skill soft Inc. http://library.books24x7.com.proxy.devry.edu/toc.aspx?bookid=17176…

    • 6799 Words
    • 28 Pages
    Powerful Essays
  • Good Essays

    Project Closeout Plan

    • 662 Words
    • 2 Pages

    Verify the scope of the project by reviewing all test data against the approved specification. We would want to identify and resolve any discrepancies which could include infrastructure or network issues. Then we would need to validate all supporting documents and that all deliverables are available. Finally assess customer satisfaction through a survey or questionarie. Obtaining this information from the customer will help you ensure the customer accepts the deliverables.…

    • 662 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    2. Meredith, Jack R. and Samuel J. Mantel, Jr. (2006). 4th edition: Project Management: A Managerial Approach. Hoboken, New Jersey: John Wiley & Sons, Inc. (ISBN-10: 0471715379).…

    • 1051 Words
    • 5 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Pmp Study Guide

    • 5693 Words
    • 23 Pages

    ** PMP – Project Management Professional Exam STUDY GUIDE – Fifth Edition, Kim Heldman, 2009, ISBN: 978-0470-45558-6…

    • 5693 Words
    • 23 Pages
    Satisfactory Essays
  • Powerful Essays

    Project Management

    • 689 Words
    • 3 Pages

    Project indirect cost represents overhead cost. Indirect cost varies directly in time. For instance, if our daily overhead cost is 250 euro, any reduction in project duration has to represent a saving of 250 euro per day. Project direct cost is clearly charged to a specific work package such as labor, materials and equipments. In order to create a cost-duration graph we have to apply three major steps:…

    • 689 Words
    • 3 Pages
    Powerful Essays
  • Powerful Essays

    Classification of the project—e.g., large/small, platform/incremental, complex/ typical * Analysis of information gathered * Recommendations * Lessons learned * An appendix with backup information to support recommendations. 2. Why is it difficult to perform a truly independent, objective review?In most cases those performing the review have some previous knowledge of the project, which presents opportunities for bias. Sometimes the review team, or facilitator, is perceived as a jury, but even jury members come with built-in biases. For example, internal politics have been known to enter into decisions concerning closure of a project. The simple point is that every attempt should be made to keep the review independent and objective. If the review of projects is a regular procedure for all projects, the negative stigma of audits is minimized. 3. Why should you separate performance…

    • 875 Words
    • 4 Pages
    Powerful Essays

Related Topics