Preview

Systems Engineering

Powerful Essays
Open Document
Open Document
3174 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Systems Engineering
System Engineering and The Air Force KC-X Replacement Effort

James Weselek
AVIA 5543
Systems Engineering For Logistics

Outline

I. Abstract
II. Introduction a. Capabilities b. History of the tanker
III. Customer Needs
IV. State the Problem
V. Investigate Alternatives
VI. Model the System a. Boeing b. Northrop Grumman
VII. Assess Performance
VII. Final Decision (sort of)

Abstract In the late 1990s – early 2000s the United States Air Force decided to replace its fleet of KC-135s. Initially the first batch of replacements was to be an air tanker version of the Boeing 767, which was selected over the Airbus A-330 based tanker. This contract fell through due to some controversies regarding the original leasing rather than an outright purchase of these aircraft. In 2006 the USAF released a request for proposal once again for the KC-X which was to be selected in 2007. On 29 February 2008 the Department of Defense announced that it had selected the Northrop Grumman KC-45A over the Boeing KC-767 as the new tanker replacement. Systems Engineering is a process that ensures that the customers needs are satisfied through a systems entire life cycle. The customer in this study is the United States Air Force. In the competition between Boeing and Northrop Grumman for the right to produce America’s next air tanker, I will show examples of the different system engineering steps that are used to satisfy the needs of the Air Force.

Introduction The term “System Engineering “is a process that ensures the customers’ needs are satisfied through a systems’ entire life. The customer in this paper is the United States Air Force. In a competition between Boeing and Northrop Grumman for the right to produce America’s next air tanker I will show examples of the different system engineering steps that are used to satisfy the needs of the Air Force. Aerial refueling aircraft are key to air



References: 1. Northrop Grumman KC-45: Why We Won Key Selection Criteria, retrieved from www.nothropgrumman.com/kc45, June 27, 2008 2 3. Wikipedia, Northrop Grumman KC-45, retrieved from http://en.wikipedia.org/wiki/Northrop_Grumman_KC-45, June 27, 2008 4 [7] Gulf War Air power Survey Summary Report, 1993 [8] Ibid

You May Also Find These Documents Helpful

  • Better Essays

    BSA 375 Week 2

    • 1147 Words
    • 3 Pages

    Valacich, J. S., George, J. F., and Hoffer, J. A. (2012). Essentials of Systems Analysis and Design (5th ed.). Upper Saddle River, NJ: Pearson Education. Retrieved from the University of Phoenix eBook Collection database.…

    • 1147 Words
    • 3 Pages
    Better Essays
  • Better Essays

    Satzinger, J. Jackson, R. Burd, S. (2004) Systems Analysis & Design in a Changing World (4th ed.). Boston: Thomson Learning, Inc.…

    • 4521 Words
    • 19 Pages
    Better Essays
  • Satisfactory Essays

    Xacc/210 Final Project

    • 522 Words
    • 3 Pages

    The first stage of the system development life cycle is planning. The objective and requirements of the project are determined at this phase. An evaluation of personnel and costs, as well as ideas for new products is prepared. Once this information is gathered it is analyzed to determine if there is any alternative products to be used. At which point if there is not, then…

    • 522 Words
    • 3 Pages
    Satisfactory Essays
  • Better Essays

    Satzinger, J. W., Jackson, R. B., & Burd, S. D. (2004). _Systems analysis and design in a changing world_. Boston, Mass.: Thomson/Course Technology.…

    • 869 Words
    • 4 Pages
    Better Essays
  • Good Essays

    BSA 375 Week 3 Individual

    • 793 Words
    • 3 Pages

    Valacich, J. S., George, J. F., and Hoffer, J. A. (2012). Essentials of Systems Analysis and Design (5th ed.). Upper Saddle River, NJ: Pearson Education. Retrieved from the University of Phoenix eBook Collection database.…

    • 793 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Traditionally, our UC-35 fleet has been used primarily for our Very Important Personnel (VIP) missions, while the C-12 fleet has assumed the workhorse cargo and troop transport missions. Initially, our fleet was flying our program flight hours, but within the last eight months, we have seen a dramatic increase in troop and cargo missions. Subsequently, our C-12’s has been flying nearly 120% of their allotted flight hours,…

    • 828 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Cutting the kiowa down

    • 459 Words
    • 2 Pages

    The government decision to remove the OH-58d(R) Kiowa Warrior from its inventory is hasty. Their quick decision to remove certain aircraft and fill in slots with other does not seem logical. The Army is also changing its inventory by playing a poorly planned game of leap frog with the AH-64 Apache and the UH-60 Blackhawk moving them between Active and the National Guard. The overall plan is to make the Apache the primary and only helicopter for recon and observation in the United States army. In the beginning the Kiowa was a single-engine and single-rotor. Primarily used for observation helicopter and a few direct fire support missions on the battle field. The army needed a recon helicopter that could fly in to hostile territory and observe from a distance without being seen and still have the fire power to return to the enemy if needed. After several modifications the OH-58D was born and pushed out to the units. The Kiowa has been serving in many missions since 1969 such as Vietnam, Iran-Iraq war, Panama, and Afghanistan and with several side missions as well. Since the war on terrorism the Kiowa has flown over 800,000 combat hours, and it has the best Operational Rate (OR) in the fleet at 85% highest in the army’s aviation fleet and it also has the highest OPTEMPO standing at 85 hours. . In 2004 the Kiowa was on the list to be replaced by the high cost RAH-66 Comanche. The Comanche was a technology advance helicopter with high versatility in the air and weaponry. Due to the high cost to build and burning more than 7 billion dollars, the army stopped the project with no replacement. The role of armed aerial scout or the armed reconnaissance helicopter (ARH) will be temporarily cover by the apache till a successor of the Kiowa is crowned by the army, which brings up the discussion of biding from competing companies. . Implementing a new helicopter will cost billions of dollars in development,…

    • 459 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    There was no funding for production, but the Boeing aircraft company took it upon themselves to begin development anyway, in hopes that with the right product, the military would indeed put in an order for more. Boeing’s best minds went to work developing prototypes that could meet the Army Air Corp’s request of an aircraft that could deliver 20,000 pounds of bombs, at a distance of 2,667 miles, and at speeds of 400 miles per hour (Anderton, 1979, p. 11). The Army Air Corp liked the design submitted by Boeing and contracted for several to be built for static and flight testing in August of 1940, followed by an order of 14 more for testing and 250 for the war effort nine months later. With more of America’s leadership getting on board with the program, the order was increased further to 500 aircraft in January of 1942. This created a logistical and production challenge to Boeing right…

    • 1497 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    Systems development and maintenance the system needs to be developed and maintained constantly to keep the work in process…

    • 776 Words
    • 6 Pages
    Good Essays
  • Satisfactory Essays

    Class 11 Mishaps

    • 395 Words
    • 2 Pages

    Previous C-130 models were proven to be reliable and had a safe track record. However, the aircraft were worn and expensive to maintain. The time had come to replace the older 130s with a more up-to-date and…

    • 395 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Located in Southern California, Aircraft Solutions has a dedicated, trained workforce and maintains a large capacity plant and extensive equipment to meet customer requirements. Much of the equipment is automated to increase production while reducing costs. The company 's workforce has a large skill base: design engineers, programmers, machinists, and assembly personnel to work its highly-automated production systems.”(DeVry) Their mission is to determine the customers’ needs and provide “products and related services, and to meet cost, quality, and schedule requirements.” (DeVry) Given the amount of influence that Aircraft Solutions has in the Defense and Aerospace Industry, I will determine the best course of action to assist in their advancement of their hardware and policies of the hardware. Aircraft Solutions Business Process Management system is an end user design. This means customers, vendors, suppliers all collaborate with Aircraft Solutions to get the desired end product. “The Business Process Management also aligns internal business operations with IT support to maintain production in support of customer…

    • 870 Words
    • 4 Pages
    Better Essays
  • Good Essays

    The first flight of the A variant plane occurred 3 years later in December 2006 and the plane has been in production since that time. As of November 2016, just over 180 F-35s have been built and sent to customers. The F-35 B variant was the first to enter service in the Marine Corps in 2015. In August of 2016, the F-35 A was introduced in the Air Force and the C variant is planned to be introduced in the Navy by 2018. The F-35 is currently in Low Rate Initial Production (LRIP) and is incrementally transitioning to full rate production by 2020. The program has been under scrutiny for several cost overruns and delays that have occurred throughout the course of the program. However, as Lockheed transitions to full rate production, the unit costs for the planes will begin to…

    • 1585 Words
    • 7 Pages
    Good Essays
  • Good Essays

    The systems development life cycle (SDLC) is also known as the waterfall model. The systems development life cycle is a SDM (systems development methodology) that consists of seven phases. The seven phases are in a specific order that is completed phase by phase. The first phase is planning. The planning stage is where an outline is drawn up for preparations. During this phase a systems analyst, who may work for the company or be an outside consultant, will outline a proposed system, develop a budget, and create a detailed development schedule. To help make the decision, the company will perform four types of feasibility analyses: (1) technical, (2) economic, (3) operational, and (4) schedule. The second phase of the waterfall model is system analysis. The systems analysis phase follows the planning phase. In this phase a systems analyst would work with a company to understand the problem fully and detail the requirements of an information systems solution. This phase uses many tools and techniques, including requirements gathering, structured…

    • 435 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    F-35 Joint Strike Fighter

    • 2812 Words
    • 12 Pages

    A good analogy of the relationship between the military and the government concerning finances is similar to siblings fighting for money from their parents. One sibling may want an action figure, while the other desires a video game. The parent is then left trying to decide which child will get their way. For years, the government has basically let each branch get their way, at least where aircraft are concerned. With defense budget cutbacks on the increase, ideas have started to arise regarding the development of one aircraft for all to share. The problem concerning the individual development of an aircraft for each branch is the huge costs associated with it. The Marines could require more than 350 new aircraft to replace its current…

    • 2812 Words
    • 12 Pages
    Powerful Essays
  • Good Essays

    Now there is a new face to the American fighter aircraft program, the Lockheed Martin F-35 Joint Strike Fighter Lightning II. The next step in air combat, with the most advanced technology and weapons ordinance ever put in an aircraft. The F-35 Joint Strike Fighter was thought to be the next great fighter plane that would secure air superiority for the next generation of fighter aircraft. The new F-35 Joint Strike Fighter has been hailed as the next step in aerial combat technology. With its stealth and radar abilities, the F-35 Joint Strike Fighter was supposed to be the best aircraft…

    • 565 Words
    • 3 Pages
    Good Essays