Preview

Systems Development Life Cycle

Good Essays
Open Document
Open Document
507 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Systems Development Life Cycle
System Development Life Cycle Variation

Variations of the Phases (Waterfalls Models)

Waterfall Model – each life model is completed in sequence and then the results of the phase flow on the next phase. There is no going back once a phase is completed.

Iteration across Life Cycle Models

Iteration means that the work tasks are done once, then again, and yet again.

Spiral Cycle Model – Life cycle model with heavy iteration that breaks each project into smaller pieces, each a different type of risk

Socio Technical Systems – Information systems that include both social and technical subsystems designed to work well together

Rapid application Development (RAD) - a variation of the system development life cycle that aims to speed up radically the development process using a variety of techniques.

Systems Development Life Cycle – A method of systems development that consists of planning, analysis, design, implementation, and support phases

Project – a planned undertaking that has a beginning and an end and which produces a predetermined result or product

Phase – a division of the SDLC in which similar activities are performed

Phases of Systems Development Life Cycle 1. Planning phase – The initial phase of the SDLC whose objective is to scope and plan the project Four activities in the Project planning phase i. Define the problem ii. Confirm project feasibility iii. staff the project iv. launch the project 2. Analysis Phase – one phase of SDLC whose objective is to understand the user’s needs and develop requirements Six primary activities in analysis phase i. gather information ii. define system requirements iii. build prototypes for discovery of requirements iv. prioritize

You May Also Find These Documents Helpful

  • Powerful Essays

    Nt1330 Unit 6 Paper

    • 579 Words
    • 3 Pages

    The Custom woodworking Company has been in the custom furniture business since the early 1950’s. Since their inception they have grown their business and reputation steadily. This growth has demonstrated a need for the company to expand its existing factory floor space. Therefore, the companies stakeholders have agreed to expand the existing property by adding “additional production capacity equivalent to 25% of the existing floor space” (Wideman). Moreover, the floor space would contain “air-conditioning, a dust-free paint and finishing shop, an automatic wood working production train, as well renovated offices for the President and Executive Vice President” (Wideman). The total renovation costs have been outlined not to exceed…

    • 579 Words
    • 3 Pages
    Powerful Essays
  • Powerful Essays

    Explain what project scope is and why it is important. Describe the areas of project feasibility that are examined in the analysis phase of…

    • 1348 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    Xacc/210 Final Project

    • 522 Words
    • 3 Pages

    The first stage of the system development life cycle is planning. The objective and requirements of the project are determined at this phase. An evaluation of personnel and costs, as well as ideas for new products is prepared. Once this information is gathered it is analyzed to determine if there is any alternative products to be used. At which point if there is not, then…

    • 522 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    •Project definition and planning: The scope of the project will need an outline so the work which needs to be performed is available. Prioritizing, budgets and timelines are in this phase as well.…

    • 2364 Words
    • 8 Pages
    Satisfactory Essays
  • Good Essays

    Cis207

    • 776 Words
    • 4 Pages

    The System Development Life Cycle (SDLC) is a framework and set of processes to create or alter IT information systems, using best practices, methodologies, and models.…

    • 776 Words
    • 4 Pages
    Good Essays
  • Good Essays

    “Businesses and organizations use various types of information systems to support the many processes needed to carry out their business functions. Each of these information systems has a particular purpose or focus, and each has a life of its own. This “life of its own” concept is called the systems development life cycle or SDLC, and it includes the entire process of planning, building, deploying, using, updating, and maintaining an information system. The development of a new information system involves several different, but related activities. These activities, or phases, usually include planning, analysis, design, implementation, and maintenance/support. In other words, SDLC is a conceptual model that guides project management in information system development.”(Wikibooks)…

    • 429 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    The Systems Development Life Cycle (SDLC) is an example of one way that companies use different steps to decide which program to use. The lifecycle involves six stages the systems investigation, systems analysis, systems design, programming and testing, implementation, and operation and maintenance. Systems Investigations are when developers research the existing problems with the current system. Then the developers examine the problem and determine the user requirements, which is Systems Analysis. System Design is the step when developers decide how to resolve the problem. Next the developers change the solution to the problem into computer code, which is Programming and Testing. Implementation happens when the old system is converted into the new system. To ensure the success of the new program, the developers schedule audits to assess the systems capabilities, which is Operation and Maintenance. The systems development life cycle is important because it forces…

    • 546 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    COM 220 Week 4 Checkpoint

    • 398 Words
    • 3 Pages

    Why is the systems development life cycle important (SDLC)? Who participates in the SDLC methodology?…

    • 398 Words
    • 3 Pages
    Satisfactory Essays
  • Best Essays

    1. Waterfall Model: According to Puddupakkam (2008) Waterfall model was the first Process Model to be introduced in Bed bath & beyond and followed widely in Software Engineering to ensure success of the project. (Puddupakkam, 2008)…

    • 2758 Words
    • 12 Pages
    Best Essays
  • Good Essays

    Eco / 365 Sldc Method

    • 590 Words
    • 3 Pages

    Systems development life cycle, or SDLC, is the method used to develop information systems (Kroenke, 2012). It contains a basic model for the purpose of project management that defines the stages in information system development from start to finish with the objective of keeping the project within a budget (Rouse, 2009).…

    • 590 Words
    • 3 Pages
    Good Essays
  • Better Essays

    There are many ways to develop an Information system, which is very complex. The systems development life cycle (SDLC) provides an overall efficient framework for managing the process of system development. Various organizations use information systems to support all kind of processes that a business needs to carry out its functions. There are different kind of information system and each has its own life, and system developer describe this idea as life cycle of system. During the life of an information system, it is first conceived as an idea; then it is designed, built, and deployed during a development project; and finally it is put into production and used to support the business. Projects during products phase can still be updated, modified through smaller projects. This entire process of building, deploying and updating the information system is called system development life cycle (SDLC).…

    • 947 Words
    • 4 Pages
    Better Essays
  • Satisfactory Essays

    “Gantt charts are useful for both scheduling and tracking the activities of systems implementation projects because actual progress can be indicated directly on the Gantt chart and contrasted with the planned progress. Gantt charts are straightforward, easy to understand, and can be used with PERT to compare…

    • 911 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    The Tale of Two Heros

    • 2380 Words
    • 10 Pages

    One of the main activities in the systems analysis phase is ____ modeling, which involves fact-finding to describe the current system and identification requirements for the new system.…

    • 2380 Words
    • 10 Pages
    Satisfactory Essays
  • Good Essays

    Waterfall Model

    • 854 Words
    • 2 Pages

    I will be explaining a little more in-depth of how the Systems Development Life Cycle (SDLC) operates. The SDLC process is a Systems Development Methodology (SDM) “which is basically the process most businesses go through to develop and maintain an Information System.” (Ross A. Malaga, (2005) Information Systems Technology, Published by Prentice Hall. Page 285. Copyright 2005 Pearson Education) The SDLC contains seven major phases; I am going to start on the first which is, Planning. Planning is the step taken to find out if the current system can be updated or if there needs to be a new system created. To help make that decision four feasibility analyses will need to be completed, technical, economic, operational, and schedule. The technical analysis will determine what technologies are present and what can be created to solve the aroused issue. The economic analysis will find out if the company can afford the new or upgraded Information System (IS) and if it will benefit the company at all. The operational analysis will determine the reaction that humans will have with this new system. (Likes, Dislikes, and Employee Cooperation) The schedule analysis will determine whether or not the proposed completion time is realistic. All these steps must be completed in order to move on to the next step. The second step of the SDLC is System Analysis. The System Analysis step is where the systems analyst in the IT development team determines the exact problems then details an exact IS solution to the problem as well as a to-do list for future reference in the SDLC. This step must be completed after the planning and before moving on, to ensure quality in the product being designed. The third step of the SDLC is Systems Design. Once the Systems Development Team understands the requirements needed in order to solve the issues at hand the systems design phase can start. The Systems Design phase is meant to describe how the Systems Development team will create this new system.…

    • 854 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    The Systems development life cycle is an efficient process used by a systems analyst to develop an information system and training. The objective aims to produce a high quality system that meets or exceeds customer expectations, reaches completion within time and cost estimates, works effectively and efficiently in the current and planned IT infrastructure, and is inexpensive to maintain and cost-effective to enhance.…

    • 595 Words
    • 3 Pages
    Satisfactory Essays