Suppose a firm operates gas turbine power plants in 50 different locations in the
Asia region. It is important that the power plant operates with minimal disruptions, and therefore having spare parts inventories are very important. The severity of the disruptions depends on which component fails. Hence, the different spare parts can be divided in 3 categories:
1. Very critical parts: failure will result in turbine shut down and failure to start
2. Medium critical parts: failure will not immediately result in turbine shutdown but will deteriorate the power generation quickly.
3. Non critical parts: failure will not result in turbine shut down or failure to start There are a few medium critical parts which if one of the parts fail in the plant, the firm will need the spare part latest by next day at that plant location. These parts are quite reliable, that is, their mean time to failure is as long as 1 year but they are very expensive. Each part can cost at least $100,000. Hence the parts are very costly to hold as inventory. The firm is looking for a supply chain solution that can meet its needs.
(a) What is the competitive strategy if you want to service this firm?
(b) What supply chain infrastructure and flows do you think would be appropriate to service this customer? You will need to justify your recommendation.
(You can surf the internet to get some ideas. Use keywords such as “critical spare parts”,
“next day delivery”)

1a) Since the parts that are needed only have the next day as the dateline, responsiveness is the priority. Of course, high responsiveness and low cost is the ultimate goal to work towards.

1b) Since the customer will demand spare if they require spares, the process will be a "pull" process. Infrastructure required will be a warehouse that is near to the plant if possible. Since mean failure is 1 year, we can store 2 of each medium critical and very critical spares in the warehouse for within 1 day transportation when

You May Also Find These Documents Helpful

  • Better Essays

    Equipment Availability. The probability of equipment shortage is rated as a low risk. This project does not have any specialized equipment and all items are a commercial off the shelf item. By being unable to obtain the correct equipment will cause mission degradation at the completion of this project.…

    • 2438 Words
    • 10 Pages
    Better Essays
  • Satisfactory Essays

    Replacement Ltd. has a strong network of suppliers that supply the company each week with pieces of china, crystal and silver that they locate from estate sales, auctions, flea markets and antique stores. Replacements provides its suppliers the current price the company is willing to pay for a particular piece.…

    • 497 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    To further reduce the inventory cost and improve the expected downtime. A proposed strategy is formulated based on the following table1.…

    • 295 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    ORIGINAL EQUIPMENT PARTS SUPPLIERS IN EASTERN ONTARIO ........................... 28 LIST OF COMPANIES .............................................................................................................. 28 ADDITIONAL COMPANIES .................................................................................................... 32 6.2.1 Clusters…

    • 14140 Words
    • 57 Pages
    Powerful Essays
  • Satisfactory Essays

    Qmb Final Exam

    • 2971 Words
    • 12 Pages

    item. Past records show that only 90% of the parts of that supplier are good. If the…

    • 2971 Words
    • 12 Pages
    Satisfactory Essays
  • Better Essays

    Shortly after its installation, turbine number 2 had been experiencing problems due to defects in seals and shaft vibrations. In March 2000, a complete overhaul on turbine 2 was performed where cavities of 12 mm in depth and cracks up to 130mm in length found and repaired. Despite these efforts, turbine number 2 continued to have problems resulting in further repairs in 2005 and 2009[7][5].…

    • 1908 Words
    • 8 Pages
    Better Essays
  • Powerful Essays

    3.3 Safety Consideration during Maintenance Operation........................................17 3.4 Legislations Relevant to the Maintenance of the Plant......................................17 4. Conclusion................................................................................................................18…

    • 3478 Words
    • 14 Pages
    Powerful Essays
  • Satisfactory Essays

    asdewf frstyh gygd

    • 3396 Words
    • 8 Pages

    I would recommend John Wolf to share the inventory space with his suppliers and set up the new inventory system and it can be raise the managing efficiency while Wolf Motors to adopt the new technology. At the…

    • 3396 Words
    • 8 Pages
    Satisfactory Essays
  • Powerful Essays

    The notice contains background information that identifies emergency electrical generators as a critical resource for delivery of safe care. The background information further explains that “Testing generators for sufficient lengths of time increases the likelihood of detecting generator reliability problems and reduces the risk of losing this critical resource when it (is) most needed”. A key question ASHE members should comment on is: As it is written - will the proposed requirement lead to more effective detection of generator reliability problems and in doing so reduce the risk of failure under emergency…

    • 1458 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    solar inverter

    • 5865 Words
    • 24 Pages

    A solar inverter, or PV inverter, converts the variable direct current (DC) output of a photovoltaic (PV) solar panel into a utility frequencyalternating current (AC) that can be fed into a commercial electrical grid or used by a local, off-grid electrical network. It is a critical component in a photovoltaic system, allowing the use of ordinary commercial appliances. Solar inverters have special functions adapted for use with photovoltaic arrays, including maximum power point tracking and anti-islanding protection.…

    • 5865 Words
    • 24 Pages
    Good Essays
  • Good Essays

    Additionally, you don’t have to worry about spare part and service availability from the manufacturer. This is your creative manufacturer in the US with a complete line of replacement parts and round the clock customer support.…

    • 925 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Causes: ( 1 ) analysis of turbine blades wear serious , can not afford grading effect. ( 2 ) fan flow inappropriate .…

    • 382 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    Few reliability tools elicit stronger responses from quality and reliability professionals than Failure Mode and…

    • 702 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    According the NTSB, damage was noted to the thrust reverser, left wing, and fuselage of the aircraft (2006). Further examination revealed the number one engine intermediate pressure turbine case rupture had left a gap between the intermediate and low pressure turbine cases and fractured the disk rear drive arm and all blades were missing from the blade slots. During this initial inspection it was also noticed that the high pressure and intermediate pressure turbine bearing chamber external vent tube had two holes burned through outboard of the intermediate pressure turbine connection. According to Anderson “Most turbine failures are the result of over-temperature which is usually caused by hot starts, compressor stalls, or excessive fuel” (2009, p. 8.60). As an investigator the next step will be to identify causal factors for a turbine failure and continue the…

    • 1264 Words
    • 6 Pages
    Good Essays
  • Good Essays

    Maintenance

    • 743 Words
    • 3 Pages

    Machines fail for a variety of reasons. Likewise, not all failures are the same. The term "machinery failure" or "malfunction" usually implies that the machine has stopped functioning the way in which it was intended or designed. This is referred to as “loss of usefulness” of the machine or component. For instance, if a pump is installed to pump 100 gallons of oil per minute but over time can no longer keep up and now only pumps 75 gallons per minute, this is a loss of usefulness of the asset.…

    • 743 Words
    • 3 Pages
    Good Essays