According the case: Kristen’s Cookie Company (A), we can draw the Flow Process Chart, which could visualize the process of making a dozen of cookies.
Q1.
As we can see from this Gantt chart 1.1, the Rush Order Time is 26 minutes for one dozen size order. Chart1.1 A One Dozen Size Order

The Gantt chart 1.2 clearly show the Rush Order Time is 36 minutes for two dozen size order.

Chart1.2 A Two Dozen Size Order

According to this Gantt chart 1.3, the rush order time is 46 minutes for three dozen size order.

Chart1.3 A Three Dozen Size Order

Q2.
One dozen size order: In this situation, the bottleneck is “setting up the oven and baking”, which takes 10 minutes to finish this process. So, the Cycle Time (CT) is 10 minutes. The Kristen’s cookie company can finish the first dozen after 26 minutes, then Kristen and her roommate can complete each order per 10 minutes. 4 hours=240 minutes. (240-26)/10=21.4, and 21.4+1=22.4.
According to the equations above, the company could fill 22 orders every night.

Two dozen size order: In this situation, the CT becomes 20 minutes. The company finished the first order after 36 minutes, then they could complete each order in every 10 minutes. 4 hours=240 minutes. (240-36)/20=10.2, and 10.2+1=11.2.
According to the equations above the company could fulfill 11 orders every night.

Three dozen size order: In this situation, the CT becomes 30 minutes. The company finished the first order after 46 minutes, then they could complete each order in every 30 minutes. (240-46)/30=6.5, and 6.5+1=7.5
According to the equations above the company could fulfill 7 orders every night.
Because they have 14 minutes left after finishing all 7 orders of three dozen size, they could make a dozen cookie for a one dozen size order.

Q3.

Time
Kristen
Kristen’s Roommate
One dozen size order
8 minutes
4 minutes
Two dozen size order
10 minutes
8 minutes
Three dozen size order
12 minutes
12 minutes
Table 3.1

You May Also Find These Documents Helpful

  • Good Essays

    Having Bob pick up the sandwich bag and put it on the order rack instead of Adam, will make the process capacity slightly go up, so it would increase the revenue a little bit.…

    • 871 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    BSOP 429 Midterm Exam 1

    • 375 Words
    • 2 Pages

    7. (TCO 4) How much of total lead time is accounted for by queue time?…

    • 375 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Ideal time: If most of the orders are for popular cookies during operating hours it will result in high ideal time.…

    • 394 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Husky project

    • 155 Words
    • 2 Pages

    Calculating the amount of days it will take to product the same amount of products with the Husky’s machine:…

    • 155 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Manzana Insurance

    • 582 Words
    • 3 Pages

    * TAT (Turnaround time) measurement: We are not measuring correctly the TAT. In exhibit #3 shows that the TAT for a particular week is 8.2 days (0,6+3.4+2.0+2.2), but this means that the process is carried as a batch process, every process must be finished in order to go to the next one, and that is not the case (The possibility is very slim (5%)4) Other observation is that the 95% STC (Standard Completion Time) used is too conservative, using the Little’s law, we can estimate a theoretical lead time of 2,1 days ( Inventory (I) = 82 requests, Job’s arrival (W) = 39 request/day, TAT = I/W). The 2,1 days is far from the 6 used by the company, losing client in this way, but it shows that we can improve the TAT number if we redesign the way we measure and handle the TAT.…

    • 582 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Donner Compnay Case

    • 1288 Words
    • 6 Pages

    3. Assume a normal process flow: How many minutes per board are needed to produce an order of 8 circuit boards; of 40 circuit boards; of 120 circuit boards; of 800 circuit boards?…

    • 1288 Words
    • 6 Pages
    Good Essays
  • Good Essays

    To produce 1 dozen we need 12 minutes (8+4), two dozen in same time 17 minutes (8.5 per 1 dozen), 3 dozen 22 minutes (7 min 20 seconds per one dozen)…

    • 900 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Bca Cs-63

    • 1608 Words
    • 7 Pages

    There are seven questions in this Assignment. Answer all the questions. You may use illustrations and diagrams to enhance explanation.…

    • 1608 Words
    • 7 Pages
    Powerful Essays
  • Satisfactory Essays

    Kristen Cookie Company

    • 588 Words
    • 3 Pages

    As the chart shown above, 4 hours of cross-training process can almost complete single dozen orders.…

    • 588 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Benihana Operations Case

    • 500 Words
    • 2 Pages

    It takes 60 minutes for one customer to eat dinner, and there are 112 seats in the dining area. Therefore 112 people eat every 60 minutes (throughput). On average a dinner cycle is completed every 60 minutes/112 people = 32 seconds per person (cycle time). We know that dinners are processed in batches of 8, so on the average a table of 8 finishes every 256 seconds…

    • 500 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    The company has a sufficient supply of brackets on hand. Assembly time is one week each for tractors, trailers, and wheel assembly. However, the wheel department can only produce wheels at the rate of 100,000 a week. The manager plans to use the wheel department to full capacity, starting in week 2 of the schedule, and order additional wheels from a supplier as needed. Ordered wheels come in sets of 6,400. The lead time for delivery from the supplier is expected to be two to three weeks.…

    • 327 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Rockness Recycling

    • 257 Words
    • 2 Pages

    (60 min per hour/0.8 minute per order) x 8 hours = 600 students per day…

    • 257 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    case 10

    • 462 Words
    • 3 Pages

    The company has a sufficient supply of brackets on hand. Assembly time is one week each for tractors, trailers, and wheel assembly. However, the wheel department can only produce wheels at the rate of 100,000 a week. The manager plans to use the wheel department to full capacity, starting in week 2 of the schedule, and order additional wheels from a supplier as needed. Ordered wheels come in sets of 6,400. The lead time for delivery from the supplier is expected to be two to three weeks.…

    • 462 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Kristens Cookie Company 2

    • 550 Words
    • 4 Pages

    The time we need for the first dozen of cookies is 26 minutes (see question 1). But the next orders…

    • 550 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Executive Shirt Company

    • 346 Words
    • 2 Pages

    • For custom shirts, the time for new cutting machine is 2.5 minutes; this includes the roll out time and cutting time.…