Setting Time of Cement Lab
Lab 2: Normal Consistency
And
Setting Time of Cement Paste

By

Miss Wajisa Jomworawong 54270033 ITCE Present
Dr. Boonmee Chinnaboon

This report is part of CVE 335 Cement and Concrete Materials Laboratory

King Mongkut's University of Technology Thonburi
Term 1 Year of Education 2013

Lab 2: Normal Consistency
And
Setting Time of Cement Paste

By

Miss Wajisa Jomworawong 54270033 ITCE

Present
Dr. Boonmee Chinnaboon

This report is part of CVE 335 Cement and Concrete Materials Laboratory

King Mongkut's University of Technology Thonburi
Term 1 Year of Education 2013

Preface
This report is a part of CVE 335 Cement and Concrete Materials Laboratory for civil engineering junior students. This project is about the normal consistency and the setting time of cement paste. The data on this individual report is based on our experiment which my group and I have done last Thursday.
On this project, our group had to find the water requirement for normal consistency of cement paste and determine the initial and the final of setting time. After we had done with the experiment, we need to use the recorded data to analysis and discuss the result then hand in an individual report. I also have to thanks Dr. Boonmee for advice and assistance to finish the experiment and report.
I hope that this report will be useful to anyone who is interested. If there is any mistake in this report, I would like to apologize and accept all the wrongness and I will do my best on the further project.

Wajisa Jomworawong 54270033 ITCE

Contents
Page.
Part 1: The Standard Consistency of a Cement Paste
Introduction 1
Objective 1
Experiment
* Equipment 2 *

You May Also Find These Documents Helpful

  • Better Essays

    Slime Time Lab Report

    • 1905 Words
    • 8 Pages

    1. On a piece of notebook paper make one 20 - 25 mm long mark of each of the inks you are testing (permanent marker, highlighter, Dry Erase, and Uni-ball® Roller Pen). Space the marks at least one inch apart. Use a pencil to label each mark with its description.…

    • 1905 Words
    • 8 Pages
    Better Essays
  • Satisfactory Essays

    Panera Case Study

    • 183 Words
    • 1 Page

    Table 3 shows the flow value of the mixtures containing BA. It shows that flow value for the BA blended cement mortars were decreased with increase in the percentage of BA. The control mix (BAM 0) has a flow value of 147 mm [30]. The flow value of mixes BAM 5, BAM 10, BAM 15, BAM 20, BAM 25, and BAM 30 shows decrease of 146, 146, 145, 144, 143, and 142 mm respectively. BA requires more water for proper consistency when compared to that of ordinary Portland cement due to irregular shape with rough surfaces, high porous texture and absorptive in nature [5]. Increase in water demand of BA, decreases the flow value and resulted in poor workability. W/C ratio was kept same as 0.5 for all mixes. The flow value of BAM 30 reduced to 3.4 % due to…

    • 183 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    Concrete Lab

    • 896 Words
    • 4 Pages

    Mixtures with a higher water-cement ratio had a weaker compressive strength compared to a smaller ratio but strengthened over the curing process, showing us that the water-cement ratio of concrete is crucial to determining compressive strength, density and weight.…

    • 896 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    The objective of this experiment is to learn the methods of producing concrete and concrete characteristics as well as comparing the theoretical values of the concrete’s Young’s Modulus with experimental values.…

    • 1463 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    Blaine Fineness ASTM C 204

    • 5127 Words
    • 52 Pages

    determining its suitability with regard to fineness measurements of cements with densities, or porosities that differ from…

    • 5127 Words
    • 52 Pages
    Good Essays
  • Good Essays

    cement has been investigated to give guidance for its use in fasttrack construction. Measurements of temperature rise under…

    • 7183 Words
    • 29 Pages
    Good Essays
  • Powerful Essays

    2. Pour the ready mixed concrete with certain mix proportion into the mould in 3 layers and each layer must be tamping 25 times using the compacting steel rod .Fill up the mould until overflow and levelled the surface using the hand float.…

    • 1186 Words
    • 5 Pages
    Powerful Essays
  • Good Essays

    Gypsum Seting Time

    • 872 Words
    • 4 Pages

    In civil engineering, gypsum plays a role as a building material that contributes to many products such as cement and plaster. In this experiment, we investigated some properties considering hardening of gypsum, such as the standard water content and setting time.…

    • 872 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Corrosion of Cement Paste

    • 496 Words
    • 2 Pages

    The generated calcium carbonate accumulates in the pores of hardened cement paste, forming dense protective layer to prevent the infiltration of water outside and the solution of calcium hydroxide, thus preventing the erosion. In many projects, the cement structures which will contact with soft water should get hardened in the air at first to form a layer of calcium carbonate, which may protect the structures from dissolution corrosion.…

    • 496 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    Heavyweight Concrete

    • 274 Words
    • 2 Pages

    Procedures outlined in ACI 211.1 should be used for mixture proportioning. Typical proportions for heavyweight concrete are shown in Table 2.…

    • 274 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    primary cementation

    • 372 Words
    • 2 Pages

    The model consists of an outer cylinder representing the casing. Inside the casing is a pipe of smaller diameter which represents the drill string. To the lower end of this pipe (drill string) is attached a non return valve (a simple rubber diaphragm in this case). Now the cement slurry is pumped through the drill string followed by buffer solution. The hydrostatic head provided by drilling fluid after buffer solution in real time is transformed by a manually weighted piston which pushes the cement into the drill string and then enforces it to move through the annulus. The non return valve helps for only one way movement of pumped cement slurry. Replica of various equipments actually used in the industry is used:…

    • 372 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Mansour S.M., Abadlia M.T., Bekkour K. and Messaoudene I. (2010), Improvement of Rheological behaviour of cement pastes by incorporating metakolism, European Journal of Scientific Research, ISSN 1450-216X Vol. 42 No.3, ©EuroJournals Publishing Inc.…

    • 8393 Words
    • 30 Pages
    Better Essays
  • Good Essays

    Checking of materials is an essential part of civil engineering as the life of structure is dependent on the quality of material used. Following are the tests to be conducted to judge the quality of cement.…

    • 1070 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Concrete Lab

    • 880 Words
    • 4 Pages

    The same mixture is used in the compressive test a nd in the tensile test. Apparatus and Materials: 1. Pozzolan Cement. 2. Sweileh Sand.…

    • 880 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Juvenile Delinquent

    • 15067 Words
    • 61 Pages

    PHILIPPINES PROVINCIAL ROADS MANAGEMENT FACILITY Misamis Occidental Managed by: ACTIVITY COMPLETION REPORT TRAINING COACHING IN MATERIAL TESTING August 7-8, 2012 Villa Amor August 9-10, 2012 DPWH MATERIAL TESTING LABORATORY Oroquieta City Misamis Occidental ------------------------------------------------- Philippines Provincial Roads Management Facility (PRMF) ------------------------------------------------- COMPLETION AND DOCUMENTATION…

    • 15067 Words
    • 61 Pages
    Satisfactory Essays

Related Topics