Risk Management in Ppp Road Projects
NICMAR

RISK MANAGEMENT OF PPP IN ROAD PROJECTS

By
Varun Krishna
Anoop K.N
Khushpreet Singh

PGP ACM 25th Batch
(2011- 2013)

A Project seminar submitted in partial fulfillment of the Academic requirements of the Post Graduate Programme in Advanced Construction Management
(PGP ACM)

NATIONAL INSTITUTE OF CONSTRUCTION
MANAGEMENT AND RESEARCH
Pune Campus

DECLARATION

I/We declare that the project seminar entitled “Risk Management of PPP in Road Projects” is the bona fide work carried out by me/us, under the guidance of Dr Mahesh Gangadhar. Further we declare that this has not been previously formed the basis of award of any degree, diploma, associate-ship or other similar degrees or diplomas, and has not been submitted anywhere else.

Date: Varun Krishna – 251090

Anoop K.N – 251091

Khushpreet Singh - 251086

PGP ACM 25th
Batch (2011-2013) NICMAR Pune

CERTIFICATE

This is to certify that the project seminar entitled “Risk Management of PPP in Road Projects” is the bona fide work of Mr. Anoop K .N, Mr. Varun Krishna and Mr. Khushpreet Singh in partial fulfillment of the academic requirements for the award of Post Graduate Programme in Advanced Construction Management (PGP ACM). This work is carried out by them, under my guidance and supervision.

Date: Guide

| CHAPTER | PAGE NO. | 1. | CHAPTER 1: INTRODUCTION | 1 - 9 | 1.1. | BACKGROUND | 1 | 1.2. | AIMS AND OBJECTIVES | 4 | 1.3. | METHODOLOGY | 5 | 1.4. | SCOPE OF WORK | 6 | 1.5. | SIGNIFICANCE | 6 | 1.6. | OUTLINE OF REPORT | 8 | | | | 2. | CHAPTER 2: LITERATURE REVIEW: PPP | 10 - 24 | 2.1. | DEFINITION OF PPP | 10 | 2.2. | MODELS OF PPP | 13 | 2.3. | NEEP OF PPP | 15 | 2.4. | ADVANTAGES & DISADVANTAGES OF PPP | 17 | 2.5. | SPECIAL PURPOSE VEHICLE | 21 | 2.6. | STAKEHOLDERS | 23 |

You May Also Find These Documents Helpful

  • Good Essays

    Unit 6 Assignment 2

    • 878 Words
    • 4 Pages

    Without going into details regarding the theory of project risk management we present still, the definition of this concept as it is proposed by the Project Management Institute professionals who, in The Project Management Body of Knowledge Guide, [Duncan, W., R.,…

    • 878 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Risk Management Plan

    • 2116 Words
    • 9 Pages

    The Project Management Team will need a proactive approach in the management of risks and related uncertainty. Management of risks for this project will follow a continuous risk management model, refined as the PLC develops. Involvement of support from the business, technical, executive, and external partners is crucial to having a viable risk management process. Tasks will be evaluated and identified for the mitigation of risks; uncertainty of organizational environmental factors will be included in the evaluation of impact and probability, as appropriate. This will ensure that tracking of progress, or lack thereof, occurs and necessary resources are identified for corrective/mitigating actions planned.…

    • 2116 Words
    • 9 Pages
    Powerful Essays
  • Good Essays

    Leung, H., Popescu, E., Cao, Y., Lau, R. W. & Nejdl, W. (2011, December). Advances in…

    • 3443 Words
    • 14 Pages
    Good Essays
  • Best Essays

    The paper discuss the need and justification of the PMP for this construction project, areas that are discussed further in this paper are the audiences of the PMP and why they need to sight the PMP, the major stakeholder, the project owner (Village Investments) is found to be the main audience for this projects as the project owner needs to approve the PMP for the project to continue. In the last section of the body of the paper, it identifies the PMBOK guide as the base of the structure and contents of the PMP, it identify the PMBOK’s nine functions of project management are in the Clift’s PMP in some way with the major function having a lot more detail put into them. The major functions discuss were scope, time, cost, HR, quality and procurement management. One major lesson to be learnt is in the HR management plan with the stakeholder analysis, the school next to the car park was not inputted into the analysis and issues occurred with the closure of the access point to the school, the project anger needs to spend more time on external orientation of the stakeholder analysis to reduce issues in the future. The project manger had a simple PMP that was useful within the budget restraints and time allocated to prepare it, if more time was allowed in preparing this plan some issues during the project may have been reduced or stopped.…

    • 3230 Words
    • 13 Pages
    Best Essays
  • Powerful Essays

    This document will provide a risk assessment, with the use of FTA, for the International Space Station.…

    • 5986 Words
    • 24 Pages
    Powerful Essays
  • Best Essays

    It has also been recognised by Chapman and Ward(2003) that, it is a basic good practice to ensure that all the risks be allocated to an owner in financial terms and they should possibly be different parties as suggested in their Shape, Harness And Manage Project Uncertainty (SHAMPU) process. In its simplest form, the SHAMPU process advocates the shaping of the project which will include clarification of risk ownership, harnessing plans and implementation management.…

    • 2383 Words
    • 10 Pages
    Best Essays
  • Powerful Essays

    Accounting Analysis Paper

    • 902 Words
    • 4 Pages

    The main issue is when to record the “safety bonus” of 1 million dollars as revenue. This additional condition will be granted only if PPBJ completes the project without safety problems. The PPBJ management will focus on how to avoid any of those problems in order to get the bonus.…

    • 902 Words
    • 4 Pages
    Powerful Essays
  • Powerful Essays

    Engineering Contracts Management Engineering Arbitration Rule in Solving Disputes Post Graduate Certificate in Project Management - UK…

    • 1882 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    Project Managers must determine the success criteria for managing a project to identify risks that could possibly impede customer requirements. Risk Management is a disciplined, systematic process to obtain the maximum benefits associated with such a management channel. Every project needs some type of documentation related to risk management activity. This type of management may take on an informal or formal approach, but risk management is essential for every project. Risk Management is not a well accepted standard practice since it points out negative aspects of projects, and there are numerous inhibitions that restrain the dynamics of risk management.…

    • 4147 Words
    • 17 Pages
    Good Essays
  • Good Essays

    The infrastructural development and socio-economic progress of a nation utterly depend upon the conceptual visualization of major projects. Construction industries play an important role in economic growth and development of any country especially for developing countries like, India. In recent development, witnessed globally, it is observed that the construction industry has become one of the largest industries and its contribution is more than 10% of global economy. On account of characteristics possessed by the construction industry it is very prone to risk and uncertainty. Such…

    • 4776 Words
    • 19 Pages
    Good Essays
  • Powerful Essays

    research construction

    • 12227 Words
    • 64 Pages

    Hughes, W. (1994) The PhD in construction management. In: Proceedings of the 10th Annual ARCOM…

    • 12227 Words
    • 64 Pages
    Powerful Essays
  • Good Essays

    Especially, a vertical administrative structure in an organization makes less productive management. Managing plural departments in a local government with wholly separated job task and responsibility took me more time and cost than I anticipated in my project. In addition, appropriate disclosure information system to the private sector is needed. Based on my experience of acquiring a consulting project as a bidder, I collected background information, such as a vision of the local government and relation to other projects to understand the aim of the project better other than stand-alone specifications of the project. In other words, the private sector seeks more information which is undisclosed but useful, offering a value-added proposal to the government beyond its expectation. These management issues may harm on introducing PPP. I suppose the issues are cause difficulty in standardizing introducing procedures of PPP among local governments. In fact, there are some success cases of the PPP in…

    • 857 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Evaluation of various modes of PPP projects and ending up at BOT (build operate and transfer) mode.…

    • 763 Words
    • 4 Pages
    Satisfactory Essays
  • Powerful Essays

    AND CONTRACT MANAGEMENT

    • 2568 Words
    • 11 Pages

    The public utilities such as highways, bridges and tunnels are the concession contracts which will often require special legislation and specific government approvals. All these projects are practicing BOOT project concept – Build, Own, Operate, transfer. This entire project is complicated and requires full participation of all the parties involved in indentifying and allocating project risk and responsibilities. It also needs the support from the political, legal, commercial, social and environmental issues.…

    • 2568 Words
    • 11 Pages
    Powerful Essays
  • Best Essays

    PA52017 Parvez SIM335 PM

    • 3136 Words
    • 12 Pages

    Project is the combination of a series of sequential activities for attaining a specific goal within a specified time period utilizing a definite amount of resources. Project management is the process of attaining the desired goal by applying different techniques and strategies using the financial and human resource of the company. This assignment deals with the management of different types of project. In the first task, different aspects of a project is described along with characteristics, limitations, and scope and risk control. A PERT diagram is drawn for calculating the CPM and Gantt chart. In the second task, a formal report is prepared for ABEK limited.…

    • 3136 Words
    • 12 Pages
    Best Essays