Risk Management for Library Management System
5. Risk Management

5.1 Purpose
This part describes how we will perform the job of managing risk throughout the project. It will define the roles and responsibilities for every member in the risk processes, the risk management activities that will carried out, as well as the schedule for the risk management activities.

5.2 Role and responsibility
Project Manager
- The project manager will meet with other members of the Project Management team (Programmer, User Interface Designer, Database Administrator and System Analyzer) to discuss and identify the potential risk for each department. Redefine the project’s risk level and review the status of all risk, and find out the best solution for the risks.
Project Management Team
- The team will has the following responsibilities and authority:
Coordinating risk identification and analysis activities, maintaining the project’s risk list, notifying project management of new risk items, and reporting risk resolution status to management.

5.3 Activities
Risk Identification
Task Participants
Techniques that will be used to identify risk factors will be stated at the beginning of the project and on an on-going basis. Normally brainstorming sessions will be held. Project Manager, System Analyzer, User Interface Designer, Programmer, Database Developer.

Risk Analysis and Prioritization
Task Participants
Assign each risk factor to the relevant project member(s), and then they will estimate the probability the risk could become a problem and the impact if it does. Project Manager
All the analyzed risk factors will be collected, reviewed, and adjusted. The list of risk factors will be sorted by possibility to occur and also the impact. Project Manager

Risk Management Planning
Task Participants
All the risk factors will be assigned to every project members that they are responsible to the field or experienced for the development and execution of a risk mitigation plan. Project Manager
For each

You May Also Find These Documents Helpful

  • Good Essays

    pm 586 week 5

    • 428 Words
    • 3 Pages

    A risk assessment is needed to be able to identify the potential of each risk, the likelihood, the impact and the detection for each risk event. “To determine whether the identified risks could impact the success of the project, each risk was given a score of either 1 (very low), 2 (Low), 3 (Moderate), 4 (High), and 5 (Very High) in the areas of likelihood of risk occurring and risk impact on the project. The detection difficulty was scored using a scale ranging from 1 (no warning time), 2 (low warning time), 3 (moderate warning time), 4 (high warning time), and 5 (extremely high warning time). A higher score provides more time to identify and mitigate or respond to the issue.”…

    • 428 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Risk Management is the responsibility of every employee at the facility. Due to the size and complexity of the facility and its programs, participation for all the staff is necessary for effective management of risk.…

    • 711 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Risk breakdown structure is the hierarchically organized depiction of the identified project risks arranged by risk category (PMI PMBOK). The RBS will prove extremely valuable to better grasp when a project needs to receive special scrutiny, in other words, when risk might happen. The RBS can help the project manager and the risk manager to better understand a recurring risks and concentrations of risks that could lead to issues that affect the status of the project. Following the concept of the Work breakdown Structures (WBS), the Risk Breakdown Structure provides a means for the project manager and risk manager to structure the risks being addressed or tracked.…

    • 1800 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    Unit 6 Assignment 2

    • 878 Words
    • 4 Pages

    A closer look to the literature or project risk management standards will make the reader understand that depending on the author of the methodology, the name or the order of these sub-processes is different. Thus, risk identification and risk quantification are sometimes taken together and are called risk assessment or risk analysis; the risk response plan is sometimes met under the name of risk mitigation plan; the risk response plan and the risk control plan are sometimes taken together under the name of risk management plan.…

    • 878 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    ISSC363 Assignment 3

    • 586 Words
    • 2 Pages

    Conducting a thorough risk assessment is certainly one of the top priorities in the overall risk management program. It is a process of identifying and evaluating the risks that can have a negative impact on an organization. Once the risks have been successfully captured, they can be assessed and prioritized according to the severity of their potential impact. While every organization should have a continuous risk management program, a risk assessment is conducted at a given moment in time, and as such should be repeated on some predetermined schedule to reevaluate the risks and adjust as appropriate. To conduct an effective risk assessment, it’s important to be able to fundamentally describe of the purpose of a risk assessment, risk scope and identify critical areas for an assessment. Additionally, a methodology that is appropriate for the risk assessment should be selected.…

    • 586 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    RISK MANAGEMENT

    • 1958 Words
    • 15 Pages

    The purpose of this project is to open a new coffee shop in the local area of Covington, Ga. Charming Café will be owned by two partners, Allison Hatchell and Marshall Brumfield. This area has a high number of passing shoppers which is supported by a large and growing local population. There are a very few coffee shops in the area. Allison has experience in the restaurant business and Marshall in the commercial development industry there is an opportunity for great success. The coffee shop will serve breakfast, lunch, pastries, and variety of coffee from open to close. Operation schedule will be Monday through Saturday 5am-10pm and Sunday 9am-6pm. For continued success three positions are filled for COO, CFO, and CEO. The COO is responsible for planning and implementing the operations of the business. CFO is responsible for the financials within the company. While the CEO is in charge of all administration tasks for the company.…

    • 1958 Words
    • 15 Pages
    Good Essays
  • Powerful Essays

    * Risk Monitoring and Reporting: Report risk management activities and risk specific information to appropriate levelsof management in a timely manner.…

    • 1472 Words
    • 6 Pages
    Powerful Essays
  • Better Essays

    careful risk planning greatly mitigates the impact it can have. All projects carry some risk. The…

    • 1529 Words
    • 9 Pages
    Better Essays
  • Satisfactory Essays

    | 1. Communication to areas needing help with risk management.2. Support through the process.3. Controlled risk activities with risk profiling.4.Give input and advice for the specific policy…

    • 289 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Past Paper Q A

    • 3187 Words
    • 10 Pages

    The answer is likely to include reference to the importance of completing a risk assessment to minimise risk before undertaking work in the field. Types of risk assessment documentation and how risk is assessed could be covered; this may be before the investigation is undertaken and also in the field. The value of a preparatory visit to the area and/or testing any equipment to be used as a part of risk assessment could be discussed. The use of group data and the security it provides may also feature; this might include the composition of a group in some cases.…

    • 3187 Words
    • 10 Pages
    Good Essays
  • Good Essays

    Identify the hazards. Decide who might be harmed and how. Evaluate the risks and decide on precaution. Record your findings and implement them. Review your assessment and update if necessary.…

    • 709 Words
    • 3 Pages
    Good Essays
  • Good Essays

    health and safety unit 4

    • 749 Words
    • 3 Pages

    When carrying out a risk assessment you need to adapt it to where the activity is going to be, so if you are doing something…

    • 749 Words
    • 3 Pages
    Good Essays
  • Better Essays

    assessment 1

    • 1128 Words
    • 5 Pages

    You must identify potential risks to a specific project planed develop a risk plan to monitor and control risks effectively, identifying preventative and contingent actions to prevent the risk from occurring or reduce its impact, to increase the chances of achieving project success.…

    • 1128 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    Risk Assessment Task 1

    • 4662 Words
    • 26 Pages

    The Assessment Task is due on the date specified by your assessor. Any variations to this…

    • 4662 Words
    • 26 Pages
    Powerful Essays
  • Satisfactory Essays

    Childcare

    • 484 Words
    • 2 Pages

    The responsibility to undertake a risk assessment mostly lies with management of the setting, but the most effective method will include all members of staff…

    • 484 Words
    • 2 Pages
    Satisfactory Essays