Preview

Rfp-Pp1-Contract and Procurement Management

Good Essays
Open Document
Open Document
592 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Rfp-Pp1-Contract and Procurement Management
1.1 Project Description
Siempro Baseball Field is in need of a practice field. The land chosen is approximately 20 acres and has a few structures and trees. The existing water and sewer lines will need to be inspected/connected and the project deadline will be 2 years from project start date. We will be selecting one General Contractor to complete this project. The end result should include an updated field, clubhouse, and parking area to hold about 50 cars. We will need existing plans, specs, and drawings to map out this new renovation. The intent of this document is to provide interested vendors and enable them to submit sufficient information for the project. There will be 2 vital phases to begin this project:
Phase 1 will consist of a field investigation;
a. Review existing materials, drawings, reports for the proposed project.
b. Review Proposed Scope
c. Review existing infrastructure
d. Locate, quote product and labor costs
Phase 2 will consist of review:
a. Review of quote and material options
b. Construction estimates, detailed specs, and construction schedule.

Architectural/Design Services for Clubhouse
We anticipate that the selected consultant will provide the following services:
a. Provide professional services required for the construction, design, and administration of the building. This will include: Programming, cost estimating, structural engineering, landscaping, and interior design.

1.2 Bid/Submittal Requirements
Upon award of the contract, the vendor will submit the following:
1. Letter of Interest:
a. The letter will briefly describe the firm’s qualifications and past experience. The signature on contractual documents must be by the president/principal of the firm.
2. Qualifications/Expertise
a. Key personnel must submit professional resume indicating experience on similar projects. Each of the key personnel must have professional registration/certification as well as any licensing of the State of Washington.
b. Names



Cited: RESOURCES MRSC. Sample RFP/ RFW Documents. Retrieved on May 15, 2013. Retrieved from: www.mrsc.org/index.aspx?ref=footer Workforce Development Council of Seattle, King County. (2010). Requests for Proposals. Retrieved on May 17, 2013. Retrieved from: www.seakingwdc.org/meetings/request-for-proposal.html Garret, Gregory. (2010).World Class Contracting, 5th Edition. Illinois: CCH Incorporated.

You May Also Find These Documents Helpful

  • Satisfactory Essays

    E4-16, E4-19, E4-22 Judgment Case 4-9 on page 227, E5-3 on page 275, and E5-10.…

    • 424 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Ab209 Unit 6 Business Plan

    • 2986 Words
    • 12 Pages

    This should include the experience and special competences that each key individual brings to the business. You should also disclose any outside professional advisors such as boards of directors, advisory boards, attorneys, accountants, insurance agents, bankers, consultants, mentors, or other advisors who will be assisting the new venture.)…

    • 2986 Words
    • 12 Pages
    Powerful Essays
  • Satisfactory Essays

    responsible for meeting the deadline of the project. The architect or building manager will be responsible for…

    • 315 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Week 2 Project Charter 2

    • 935 Words
    • 5 Pages

    What is your project going to accomplish? How does this project relate to overall goals and objectives of the company? It is part of a program or larger project? Currently the City of Dallas has embarked on an endeavor to upgrade the city’s parks and recreation centers. Our goal is improve the overall safety and to design unique park or recreation center that reflect the culture of the residents who live in the area. Our Project Managers will assist you with planning, organizing, coordinating, leading, and controlling resources to deliver a state of the art playground that will meet federal, state, and local safety requirements. We will guide and suggest option to work within the budget constraints of your organization. The final design of the playground will be completed in phases throughout the years with the intent of saving upfront cost.…

    • 935 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    The purpose of this paper is to highlight an area in a financial organization that may be outsourced and prepare an executive summary document that focuses on the cost savings of the outsourcing/contracting process for the business process that I’ve decided to outsource. This analysis will justify my decision for the business process outsourced by the followings:…

    • 2091 Words
    • 9 Pages
    Powerful Essays
  • Powerful Essays

    Automating the submittal process by electronically transferring the completed proposal/modification request to the contracting office; and…

    • 2216 Words
    • 9 Pages
    Powerful Essays
  • Good Essays

    We will meet with you and discuss all ideas and preferences you may have for this project. Our experts also will collect all pertinent measurements in order to create a construction plan.…

    • 481 Words
    • 2 Pages
    Good Essays
  • Better Essays

    Procurement Contract Law

    • 1993 Words
    • 8 Pages

    Payments under Fixed-Price Construction Contract clause permits the government to partially compensate contractors for supply and services which have been accepted by the Government, as long as the contractor demand it and the sum is no less than $1,000 or 50% of the full contract amount. These interim payments diminish the contractor needs to finance expenses to fulfill the contract. As permitted by the Contracting Officer, the government will reimburse the contractor, the amount that is specified in the contract as the work continues, or as decided by the Contracting Officer.…

    • 1993 Words
    • 8 Pages
    Better Essays
  • Satisfactory Essays

    2. In many cases, the price charged by a seller may have little or no relationship to actual costs. True False…

    • 277 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    In anticipation of a change in needs I would utilize the management process known as Agile Scrum methodology. This type of management process allows constant communication between the buyer, or the “product owner” and the seller, or the “scrum team”. This is a management process used widely in the development workplace. This allows the team to focus on short term goals within 1 to 2 week iterations known as sprints. If the buyer, BBI has changes that need to be made to the expectations, then the team would be able to change that on the fly, rather that starting from the beginning. The plan is to build things separate and then put the pieces together, rather than building one system on top of another. This way, all members of the team have their deadlines and goals set, and the team can multi task. And if an element needs changing early on, or midway through, it won’t throw the whole project off. This also comes with weekly meetings and updates to the buyer. If the buyer has certain acceptance criteria, they will be able to see everything through every phase. This gives room for a more successful, highly effective project. Documentation of change is done during each sprint, because notes and reports are taken daily for issues and shifts in priority during an iteration.…

    • 314 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Procurement Management

    • 527 Words
    • 3 Pages

    Ch 7. P8. What are the issues or questions purchasing needs to address when evaluating whether a supplier is a candidate for a longer-term relationship?…

    • 527 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Contract Procurement

    • 3443 Words
    • 14 Pages

    Seeds-a-Million is an organization seeking a management consulting company that will prepare a design for an updated inventory tracking system. This contract is for the design only not the implementation of the system, which will be determined at a later date, to aid in determining whether the execution of a tracking system will improve our supply issues and in turn reduce customer complaints.…

    • 3443 Words
    • 14 Pages
    Powerful Essays
  • Powerful Essays

    Intro to procurement

    • 13439 Words
    • 54 Pages

    No part of the material in this manual may be reproduced without the prior written consent of the…

    • 13439 Words
    • 54 Pages
    Powerful Essays
  • Satisfactory Essays

    Student

    • 261 Words
    • 2 Pages

    Phase 1, initial due diligence, is a top-level, “kick-the-tires” evaluation that provides the visibility to reject an acquisition if it does not satisfy basic investment criteria. Phase 2, secondary due diligence, is a more intense evaluation that drills deeper into operations. Phase 1 provides focus for the subsequent evaluation during Phase 2.…

    • 261 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Once the information is formulated the owner needs to make a decision as to whether or not to proceed with the project. If the decision is to proceed, than the owner needs to select a site and establish a program,a conceptual estimate and a master schedule. The contractor and project manager also be hired at this stage.…

    • 1642 Words
    • 7 Pages
    Good Essays