Preview

Remedial Action Case Study

Good Essays
Open Document
Open Document
822 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Remedial Action Case Study
Since both Circuitron Corporation and the property owner, 82 Milbar Boulevard Corp., had filed for bankruptcy in 1986 and 1987, respectively, EPA performed the Remedial Design and Remedial Action (RD/RA) for the site. And ICF Corporation and Ebasco Services Incorporated respectively performed the Remedial Design in the OU-1 ROD and OU-2 ROD on behalf of EPA. For the Remedial Action, EPA entered into an interagency agreement (IAG) with the U.S. Army Corps of Engineers (USACE) for the implementation of construction. USACE contracted with Sevenson Environmental Services, Inc. to implement the remedial activities selected in the OU-1 ROD, and URS Corporation to implement the remedial activities selected in the OU-2 ROD.
3.1 OU-1 - Source Control
…show more content…
The first action taken was to conduct a geoprobe soil sampling and analysis, in order to determine the spatial extent of VOC and metal contaminations. The geoprobe study showed that the upper soils (depth less than 6 m) were not heavily polluted, and the VOCs in the soils were below the cleanup levels. Therefore, soil treatment via the SVE system was not warranted. Before the whole geoprobe study finished in June 1995, some other activities were taken. The first one was to determine the demolition of the Circuitron building. Though in OU-1 ROD the building was not determined to be demolished, subsequent investigations showed that he building had deteriorated markedly, and therefore it was decided to demolish the building. The demolition of the building was initiated in June 1996. After that, the activities that were chosen to remedy contaminated soils in the geoprobe study were initiated in November, 1996 and completed on December 20, 1996. The most important thing is to remove underground structures and sediments and soils in or around them. They removed building flooring, sediments in the leaching pools and those pools themselves, the soil surrounding those underground structures, and some roll-off containers. After these activities, approximately 50 tons of contaminated sediments and 1200 tons of contaminated soils were removed. Besides, they sampled the wastes that was left from previous activities for full RCRA Toxicity …show more content…
The results of this sampling program were used to determine the final location of the groundwater extraction wells. After that, URS initiated on-site construction activities in August 1999. They firstly uncovered seven dry wells approximately 3 m in diameter and 4.5 m deep which were abandoned before, as monitoring wells. Then three extraction wells and two monitoring wells were drilled. Besides, some other RA activities were performed. They trenched and installed the pipeline and electrical cables from the treatment facility to the extraction wells, and installed the reinjection trench, which were necessary for pumping groundwater into treatment facility. A building in which the treatment facility would be installed was constructed, firstly the building foundation and concrete slab, and secondly the pre-engineered metal building. After the construction of the building, the process equipment was installed. Then, an approximate two-inch thickness of stone cover was placed. Finally, they tested the groundwater treatment facility. The grading of this site was also done at this

You May Also Find These Documents Helpful

  • Satisfactory Essays

    NETW320

    • 403 Words
    • 2 Pages

    6. What are the exact detailed compaction requirements as listed in the manual provided by the city for restoration of any surface that is trenched?…

    • 403 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Key external drivers of the remediation industry and Clean Harbors are: government consumption and investment, federal funding for homeland security, demand from construction, and the natural disaster index. Key success factors are: having a diverse range of clients, ability to alter mix of inputs in line with cost, ability to effectively manage risk, licenses, ability to compete on tender, and compliance with government regulation. Some other external factors which affect Clean Harbors which we considered in our research are political, economic, social, technological, environmental, and…

    • 547 Words
    • 3 Pages
    Good Essays
  • Good Essays

    A developer called Riverside Bayview Homes (respondent) owned 80 acres of land in Michigan, and intended to dredge and fill wetlands that existed on its property, in order to build homes. Under the provisions of the Clean Water Act, the Army Corps of Engineers (petitioner on behalf of the U.S.) felt that RBH should not be permitted to do so and filed suit in Federal District Court, seeking an immediate injunction in order to prevent the continuation of this project. The COE felt that the land owned by RBH was subject to jurisdiction under the Clean Water Act because of its adjacency to navigable water, and therefore (under section 404(a) of the CWA) required a permit in order to be dredged and filled. Under the Clean Water Act, a freshwater…

    • 665 Words
    • 3 Pages
    Good Essays
  • Better Essays

    1. What were the legal issues in this case? This case is based around the laws and regulations of OSHA. OSHA is an Occupational Safety and Health Act that has been put into place to ensure the safety of employees while on the job. These regulations are put into place to help reduce the number of on the job injuries and death. In this case, Williams Construction was put under investigation after a trench collapse, which resulted in the death of one employee and a serious injury in another. After the investigation Williams was charged with four OSHA violations that all resulted in expensive fines. The issues that arose from the investigation included; the failure to instruct employees and managers on how to recognize and avoid hazardous work conditions, the failure to ensure that employees did not have to travel more than twenty five feet to a safe zone, the failure to have a “competent person” that was specifically trained in trench safety and the final violation was the failure to make sure that the walls of the evocation were either sloped or supported. It is the belief of OSHA that if these regulations were followed that this tragic accident could have been avoided. The legal issue here is whether or not the courts and the construction company itself should up hold the violations of specific OSHA standards.…

    • 987 Words
    • 4 Pages
    Better Essays
  • Good Essays

    6. What are the exact detailed compaction requirements as listed in the manual provided by the city for restoration of any surface that is trenched?…

    • 343 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Bureaucracy Case Analysis

    • 2330 Words
    • 10 Pages

    industrial waste. The site is located in the heart of the downtown, Wichita business district. The contamination was…

    • 2330 Words
    • 10 Pages
    Powerful Essays
  • Satisfactory Essays

    Have regard to effects on environment - When ordering ground testing such as CPT's or boreholes I make the effort to ensure that the drilling locations are accessible and undertaking the drilling will not cause damage to people's property. When carrying out the design of the gravel raft for 128 Clarence Street I made sure…

    • 400 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Essay

    • 1594 Words
    • 7 Pages

    The work in the field involves excavation for installation of a new subsurface irrigation, drainage and heating facilities. This activity is followed by actual installation of water and drain pipes, valves, heating and control circuits, etc. Installation of the subsurface facilities (fourteen weeks) is followed by filling of the playing field and track. Only with the completion of the backfill material needed for the drainage…

    • 1594 Words
    • 7 Pages
    Powerful Essays
  • Better Essays

    Superfund Program

    • 1109 Words
    • 5 Pages

    The site that I have found in my state was the Chemtronic, Inc. in Swannanoa, NC. It is about 1,027 acres and only about 20 acres in total are contaminated with these pollutants. This property has had several owners and operators and it was first developed as an industrial site in 1952. After first opening the first products that were manufactured on this site were explosives, incapacitating agents, and chemical intermediates. There are about 23 individual on-site disposal areas that were identified during the investigation activities on this site. During 1971, the disposal practices were not well defined. Solid waste materials and possibly solvents were reportedly incinerated in pits dug in the burning ground these pits are known as the Acid Pit…

    • 1109 Words
    • 5 Pages
    Better Essays
  • Better Essays

    Read 371 Action Research

    • 937 Words
    • 4 Pages

    In today’s society educational reform is at the forefront of parental concern. However, parents do not want to be held accountable for the actions of their children. In return, teachers are expected to take on the full responsibility of students’ successes and failures within the classroom. With this being the case teachers must develop a method to increase student performance within the classroom. I plan to conduct my research on how to maximize expectations in the classroom so student achievement is emphasized. When expectations are capitalized on I hypothesize students will take on their coursework with more…

    • 937 Words
    • 4 Pages
    Better Essays
  • Powerful Essays

    Practicum Action Inquiry

    • 1493 Words
    • 6 Pages

    References: LaRocque, M., Kleiman, I., & Darling, S. M. (2011). Parental involvement: The missing link in school achievement. Preventing School Failure, 55(3), 115. Retrieved from http://library.gcu.edu.edu:2048/login?url=http://search.ebscohost.com/login.aspx?direct=true&db=ehh&site=ehost-live&scope=site…

    • 1493 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    United States Amy Corps of Engineers are responsible for the design and construction of the levee System, and…

    • 599 Words
    • 3 Pages
    Good Essays
  • Better Essays

    American Infrastructure

    • 1180 Words
    • 5 Pages

    Failure to Act. Rep. N.p.: n.p., n.d. 2011 Report Card. American Society of Civil Engineers,…

    • 1180 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    |Session No.: Session 3 | |Session Title: Effective Remedial Teaching | |Time | 1 hour | |Session outline |Teaching vs Remedial Teaching (30 minutes) | | |Principles and roles of remedial teaching (30 minutes) | |Activity 1 | Teaching vs Remedial Teaching (30 minutes) | |Procedure |Greetings | | | | | |What is teaching? (slide 3) | | | | | |(Course participants give the definition of teaching) | | | | | |Elaborate on the lists given by participants.…

    • 919 Words
    • 4 Pages
    Powerful Essays
  • Good Essays

    Remedial Instruction

    • 2177 Words
    • 9 Pages

    -Cornhole, also known as bean bag toss, corn toss, baggo or bags, is a lawn game in which players take turns throwing corn hole bags at a raised platform with a hole in the far end. A bag in the hole scores 3 points, while one on the platform scores 1 point. Play continues until a team or player reaches the score of 21.…

    • 2177 Words
    • 9 Pages
    Good Essays