Recess
[pic]

BY

Dr.T.K.NAIYA
Department of Petroleum Engineering
Indian School of Mines, Dhanbad – 826004

Factors Influencing Well Completion Design

Completion is the lowest cost completion that needs or nearly made the demand played upon a form the most of his life. To intelligently design will completion, a reasonable estimate of producing characteristics during the life overwhelm must be made. Both reservoir and mechanical considerations must be evaluated.

Reservoir considerations

Reservoir under consideration was the location of various fluids in the formation of penetrated by wellbore , the flow of these fluids to the reservoir rock, and characteristic of rock itself. Producing rate to provide maximum economic recovery is often the starting point for the completion design. Among other factors producing rate should determine the size of the producing conduit. Multiple reservoirs penetrated by a well pose the problem of multiple completion in one drilled hole. Possibilities include multiple completion inside casing separated by packer, are several strings of smaller casing cemented in one bore hole to provide effect separate wells. Other possibilities include the commingling of hydrocarbons from separate reservoir downhole, or drilling several borehole from one surface location.

Mechanical considerations

Mechanical considerations or "well hook up" is often the key to being able to deplete the reservoir effectively, monitor down performance, and modify the well situation when necessary. The mechanical consideration of well is the key to being able to do what ought to be done in the well promised a standpoint of controlling the offer reservoir of fluids, oil, gas and water.

Formation damages related to the well hookup, both minimising damage initially and relieving the effects of the damage. Mechanically will commission design is a complex engineering problem.

Basic philosophy is to design as

You May Also Find These Documents Helpful

  • Powerful Essays

    busn 5060

    • 3073 Words
    • 13 Pages

    Guidelines for Minimum Standards in Water Well Construction, Province of British Columbia — June 1982. (n.d.). . Retrieved July 11, 2014, from http://www.env.gov.bc.ca/wsd/plan_protect_sustain/groundwater/library/standards/Guidelines_1982/standr1.html…

    • 3073 Words
    • 13 Pages
    Powerful Essays
  • Good Essays

    The need for oil and gas to be drilled on American soil is growing. The need for oil and well rigging and oil riggers increases daily. Despite being an extremely dangerous field to go into, oil rigging is a sought after job. As the popularity of oil rigging increases, the danger of doing so will increase as well and the concern for those working with oil welling rises.…

    • 424 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Step 1: Vertical well begins to be drilled with a drill pipe and drill bit past the ground water level a few thousand feet down.…

    • 724 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Comment on the factors that affect the process design. Identify at least one metric to measure process.…

    • 1027 Words
    • 5 Pages
    Satisfactory Essays
  • Good Essays

    Simulator Simulation

    • 248 Words
    • 1 Page

    With the well first completely shut-in, the choke operator slightly opens the choke and then the driller slowly but steadily increases the mud pump level to the desired kill rate. The choke operator stabilizes the casing pressure by simply opening or closing the choke while the pump is brought up to speed.…

    • 248 Words
    • 1 Page
    Good Essays
  • Better Essays

    Hydraulic Fracturing

    • 1087 Words
    • 5 Pages

    The entire fracturing operation takes places near the well site that connects the underground resource. The drill hole turns horizontal once it reaches the depth of the resource so as to increase the area of the well exposed to the…

    • 1087 Words
    • 5 Pages
    Better Essays
  • Best Essays

    Customer Jornal

    • 4507 Words
    • 40 Pages

    Association of Drilling Engineers, their officers or members. Questions concerning the content of this paper should be directed to the individuals listed as authors of this work.…

    • 4507 Words
    • 40 Pages
    Best Essays
  • Good Essays

    Infrastructure, i.e. planning, schedule, EPCI constructions for drilling site, pipeline, refinery and choice of technologies – High Impact (Suslick and Schiozer, 2004).…

    • 739 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Hydraulic Fracking

    • 280 Words
    • 2 Pages

    The process includes steps to protect water supplies. To ensure that neither the fluid that will eventually be pumped through the well, nor the oil or gas that will eventually be collected, enters the water supply, steel surface or intermediate casings are inserted into the well to depths of between 1,000 and 4,000 feet. The space between these casing “strings” and the drilled hole (wellbore), called the annulus, is filled with cement. Once the cement has set, then the drilling continues from the bottom of the surface or intermediate cemented steel casing to the next depth. This process is repeated, using smaller steel casing each time, until the oil and gas-bearing reservoir is reached (generally 6,000 to 10,000 ft). (FracFocus, 2012)…

    • 280 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Wells are drilled vertically hundreds to thousands of feet below the land surface. Fractures are created by pumping large quantities of fluids at high pressure down a wellbore and into the target rock formation. Hydraulic fracturing fluid commonly consists of water, proppant and chemical additives that open and enlarge fractures within the rock formation. These fractures can extend several hundred feet away from the wellbore. The proppants - sand, ceramic pellets or other small incompressible particles - hold open the newly created fractures. Once the injection process is completed, the internal pressure of the rock formation causes fluid to return to the surface through the wellbore. This fluid is known as both "flowback" and "produced water" and may contain the injected chemicals plus naturally occurring materials such as brines, metals, radionuclides, and hydrocarbons. The flow back and produced water is typically stored on site in tanks or pits before treatment, disposal or recycling. In many cases, it is injected underground for disposal. In areas where that is not an option, it may be treated and reused or processed by a wastewater treatment facility and then discharged to surface water.” (“The Process of Hydraulic…

    • 1818 Words
    • 8 Pages
    Better Essays
  • Good Essays

    recess

    • 604 Words
    • 3 Pages

    Do you think recess is an essential part of a diligent students’ academic life? If you answered “no “to this question you may want to ask yourself: do I need a break after working for seven hours consecutively? Recess to children is like coffee to an exhausted person, who has to work all day: reviving! But, recess does much more than just this. Recess provides to the hardworking students the mental and physical agility they need so much to strive. If recess gets cut back from a student’s school day they get hurt both physically and mentally!…

    • 604 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    interesting, should not be considered a direct benefit, but often will be” (Benefits of hydraulic…

    • 1907 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    Well Completion Tubing

    • 2438 Words
    • 10 Pages

    17C-1 The Lease Pumper’s Handbook Chapter 17 Well Servicing and Workover Section C THE TUBING STRING C-1. Tubing and Casing Perforation. The relationship of casing perforations to tubing perforations is important to the performance of the well, whether it is a flowing well or produced by artificial lift. The lease operator must know if the tubing perforations are above or below the casing perforations or at the same level (Figure 1). This can be critical as to how much oil the well produces and the problems encountered. For wells that produce a lot of scale, production personnel operate under different philosophies. One school of thought is that the higher the tubing perforations can be raised above the casing perforations and still achieve a satisfactory daily production, the less the scale will break out of the water in the tubing and flow line. Some companies raise the tubing perforations a few feet above the casing perforations, while other companies move them much higher. Some operators maintain that if tubing perforations are placed even with or lower than the casing perforations, the reduction in reservoir pressure will increase daily production, resulting in increased income to solve the additional production problems. Other companies place the tubing perforations below the casing perforations even if it results in a tubing arrangement where the tubing has no mud anchor. A shop-made two-foot perforated joint is used. The joint is closed on bottom and has dozens of ½-inch holes drilled into it. A collar is used to screw it directly under the seating nipple. This reduces the length of the pump gas anchor to one foot or less. Companies favoring this method maintain that it gives the highest daily average production. The most typical tubing arrangement is to place the tubing perforations a few feet above the casing perforations. This maintains a small amount of liquid against the formation, instead of having a drained or dry matrix area at the bottom of the…

    • 2438 Words
    • 10 Pages
    Good Essays
  • Satisfactory Essays

    Sheet Piles

    • 690 Words
    • 3 Pages

    They have an important advantage in that they can be driven to depths below the excavation bottom and so provide a control to heaving in soft clays or piping in saturated sands.…

    • 690 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Fig 2: Showing the locations of the wells in the test field “Stegemüle” Gottingen (R. Brauchler,et…

    • 1623 Words
    • 7 Pages
    Powerful Essays