Preview

Process Design for Riordan Manufacturing

Powerful Essays
Open Document
Open Document
1890 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Process Design for Riordan Manufacturing
Running Head: PROCESS DESIGN FOR RIORDAN MANUFACTURING

Process Design for Riordan Manufacturing

STUDENT NAME

University of Phoenix Online

INSTRUCTOR NAME

OPS/571

DATE
Process Design for Riordan Manufacturing The Riordan Manufacturing plant in Hangzhou, China operates its manufacturing unit to prepare the electric fan to provide the worldwide supply based on the production forecast sales extrapolated using the theory of moving averages for last three years. This paper includes an analysis of the material requirement planning, existing process design, application of supply-chain concepts including any available global opportunities. Additionally, this paper will include a production forecast and as well as an implementation plan for lean production and a just-in-time system to optimize the profit at Riordan and improve customer satisfaction with timely delivery of orders with appropriate inventory management system.
Material Requirement Planning The material requirement planning of Riordan manufacturing is designed to supply the required material for creating the parts of electric fan in order to produce the components at each phase of assembly line production. The receiving department collects the raw material, which is processed in the molding department to make it suitable for generating parts of the fan after being polished and trimmed in the trimming department. These parts are further processed in the assembly department to make larger components such as fan blades or fan housings. The packaging departments puts each parts of the fan in right package with adequate labeling so that it can be delivered to distribution center through shipping department (University of Phoenix, 2004). There are waste by-products from above mentioned departments, which increase the cost of the finished product in the form of the electric fan. The leftover materials are used for creating customized products but it is not sufficient to



References: Chase, Richard B., Jacobs, F. R., & Aquilano, Nichlas J. (2006). Operations management for competitive advantage (11th ed.) Roach-Partridge, A. (2008). 3PL Elements: Outsourcing = A Formula for Change. Inboundlogistics. Retrieved from http://www.inboundlogistics.com/articles/features/0708_feature01.shtml Shields, T. (1999). Tutorials - lean production / lean manufacturing. Defense Acquisition University of Phoenix. (2004). Riordan Manufacturing Virtual Organization. Retrieved from University of Phoenix, OPS571 website. Cover Letter to Riordan Manufacturing May 24, 2010

You May Also Find These Documents Helpful

  • Better Essays

    Though Riordan Manufacturing has seen success since beginning operations, there are still important improvements needed. This analysis is written to identify necessary changes needed to make Riordan Manufacturing a more efficient operating company.…

    • 2054 Words
    • 9 Pages
    Better Essays
  • Powerful Essays

    In this paper, Team B discusses strategic capacity planning and lean production for new process design and supply chain processes for the electric fans at Riordan Manufacturing. This discussion is an outpouring of research and brainstorming between team members and begins with a newly designed supply chain to increase value, followed by an evaluation of factors that guide strategic capacity planning and an analysis of current applications of lean production. A concluding section summarizes Team B 's analysis of findings.…

    • 1594 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    It is essential that Riordan Manufacturing develop a well-designed strategic capacity plan in order to ensure that the business is profitable and produces the electric fans in a cost-effective manner. The success of a supply chain lies in good strategic and tactical planning and monitoring at the operational level. “Strategic planning is long-term planning and usually involves selecting providers and distributors, location and capacity planning of manufacturing/servicing units, among others. In the context of supply chain design we usually consider two aspects in the selection of partners: the qualitative aspect and the quantitative aspect. The qualitative…

    • 932 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Ops/571 Week 6

    • 1445 Words
    • 5 Pages

    Team A will present a proposal package for Riordan Manufacturing Company’s electric fans. This proposition analyzes the importance of the MRP in regard to the fans. In addition, a newly created process design for the production of the electric fans, and a…

    • 1445 Words
    • 5 Pages
    Good Essays
  • Best Essays

    Riordan Manufacturing produces electric fans out of its plant in China. This proposal package will discuss the process design, which will concentrate on all of the cycles of manufacturing the electrical fans. This proposal will also cover how to use supply chain concepts to eliminate bottlenecks to effectively meet demands of customers. Also this proposal will discuss production forecasting and the implementation plan of lean production using Gantt Charts. Finally we have added a cover letter which covers aggregate operations planning and Total Quality Management (TQM).…

    • 1819 Words
    • 8 Pages
    Best Essays
  • Powerful Essays

    The Riordan Manufacturing plant in China produces electric fans and distributes them worldwide and needs to implement a more agile supply chain process in order to reduce costs and increase profitability. To make the production of electric fans more efficient, Riordan must put in place an EDI and VMI system, change the levels of inventory that are carried and implement mass customization procedures using the Pontiac, Michigan distribution…

    • 1558 Words
    • 7 Pages
    Powerful Essays
  • Better Essays

    Riordan Manufacturing is an industry leader in its field and is committed to providing its employees and business partners with efficient and professional service. The hardware, software, and processes that make up Riordan’s Human Resource Information System (HRIS) pose a major obstacle to its continued success and aspiration of becoming a green company. In response to these challenges with its current HR systems, Riordan has initiated a project to plan for the upgrade and integration of its human resource systems. Riordan is hopeful that the proposed HRIS will be a major improvement by providing an integrated human resource information system that is scalable, maintainable, and upgradeable to grow with the company.…

    • 1087 Words
    • 5 Pages
    Better Essays
  • Good Essays

    Present sales incentives are structured for individual salespersons ' as an alternative for a team approach. "The new philosophy is to initiate changes in business practices that will result in revisions to current sales methodologies of individual sales representatives account management to that incorporates a salesperson, a product-engineering specialist and a customer service representative with support from R& D" (UOP Scenario, 2008). Though Riordan 's Sales Department sales department processes have changed, the current incentive/bonus programs are lagging and are not strategically aligned with the new and revised programs that Riordan is attempting to implement.…

    • 4999 Words
    • 20 Pages
    Good Essays
  • Better Essays

    BSA 375 Week 1 Paper

    • 1071 Words
    • 5 Pages

    This paper will define each of the key stakeholders or stakeholder groups in Riordan Manufacturing who provide requirements for the service request; explain two information gathering methods used in future projects, identify two elements required to guarantee that the information required for the project is gathered effectively, define the scope of the project by postulating business functions involved in the project, describe the project’s operational, technical, and economic feasibility areas assessed in the SDLC analysis phase summary.…

    • 1071 Words
    • 5 Pages
    Better Essays
  • Satisfactory Essays

    Riordan Manufacturing is a company that produces plastic from beverage containers to the automotive and aircraft industries. In order for Riordan to continue to be the leader in the polymer materials industries, they must improve there system.…

    • 375 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Riordan Manufacturing, Inc. has been able to make way into the global business arena with a strong footing. Riordan has established operating plants in San Jose, CA, Albany, GA, Pontiac, MI, and Hangzhou, China. In addition, the quantity of plastic fan parts manufactured in the Hangzhou plant has increased, adding significant shipping costs. This plant is currently incurring transportation and loading costs which include trucking to a harbor on the Qiantang River, loading the goods into shipping containers which are stacked onto barges bound for the Shanghai seaport.…

    • 2998 Words
    • 14 Pages
    Powerful Essays
  • Better Essays

    Riordan Manufacturing Inc. is a part of the Fortune 1000 enterprises and exceeds ISO 9000 standards giving them the ability to stay a competitor within the plastic manufacturing industry. Currently, Riordan employs 550 employees throughout their four plants in Michigan, California, Georgia and one in China making them a global company. Riordan supports key customers in the automotive parts industry and aircraft manufacturers fields and can customize their product to meet their customers ' needs. They emphasize six sigma because they understand the importance of asset utilization and the elimination of waste that slows…

    • 1116 Words
    • 5 Pages
    Better Essays
  • Satisfactory Essays

    You have earned points 1 out of 1 points for the Riordan Manufacturing Project Management Plan (Week 3 Preparation) [You have addressed the issue thoroughly and supported your assertions.]…

    • 376 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    The issues and opportunities for Riordan Manufacturing are the result of past events leading up to the problem currently facing the company. Riordan Manufacturing is suffering from the inability to identify the leading causes for a decline in employee morale and work ethic. Employee turnover rates have increased and overall job satisfaction has declined. The Satisfaction Survey has…

    • 5339 Words
    • 22 Pages
    Powerful Essays
  • Better Essays

    In order to expand globally Riordan Manufacturing Inc. will have to identify, assess and comply with many laws and regulations with no particular relevance to the area of expansion. These laws and regulations will depend on the country chosen for the expansion. The responsibility of Riordan management’s is to maximize the profit for the shareholders. All decisions must be based with this intent as the…

    • 3503 Words
    • 15 Pages
    Better Essays