Power Sector and Kerala Budget - Dr D Shina
While open discontent of the power minister Aryadan Muhamed on the KERALA Budget 2103 has created heated discussion among political circles experts in power sector affairs have came out supporting the minister. The minister’s opinion that power sector deserves strong budgetary support at this juncture is worth serious consideration.
The finance minister seems to be governed by the common notion, came up in the post liberalisation years that power sector shall be left alone to survive from its own fund, and requires no budget support. But when the sector fails to do this and it starts affecting the economy of the state the government cannot keep the eyes shut. Other states and even the Union government are making good allocation to the power sector now
The shortage of power has dampened the operations in all the sectors. A preliminary study shows that the shortage has affected the production in the third and fourth quarters and the overall reduction is estimated to be between 10 and 20 percent. Hence the Finance Minister dreaming of an economic growth of two digits cannot overlook this situation, Dr Shina said.
Huge power shortage cannot be solved overnight though magic. Import of costly power is the only immediate solution. This hard need for money cannot be overlooked by the government. The acute situation arose primarily due to the failure of rain. Kerala State Electricity Board also deserves drought relief. Transferring the whole burden to KSEB and eventually to the consumers is not fair on any account.
Economic aims of the state also call for the same. The state has shown a sign of commencement of growth phase. This shall not be arrested by problems in poer availability. It is well known among economists that a shortage of power worth rupee one cause a production loss of rupee eight. Hence it is the duty of the govt to share the burden. It is a must for fulfilling the dreams aired in “Emerging Kerala”
The current un corrected power shortage is around

You May Also Find These Documents Helpful

  • Better Essays

    Electricity is a prerequisite for any economic activity. Absence of electricity extensively hampers the overall productivity of an economy- households, businesses, enterprises, industries, communications, industries, education, service sector et cetera. Due to acute power crunch, cost of production of industries is going up, cost competitiveness of Nepalese products is decreasing, industries are closing down, production is being winded down, a shortfall in domestic production is leading to an increase in imports of even the most basic goods and services (contributing to widening trade deficit), and future growth potential is being severely crippled. Nepal’s electricity generation has been dominated by hydropower. Despite Nepal’s huge hydropower potential, approximately 40,000 MW of economically feasible hydropower potential, it has not been able to utilize even 1/40th of it. The…

    • 1088 Words
    • 5 Pages
    Better Essays
  • Satisfactory Essays

    Independent Power Production industry also does poorly in the long term due to it being privately owned and not linked to the government. The Power Production…

    • 386 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    The per capita consumption of energy in Bangladesh is one of the lowest in the world. Less than half of the population has access to grid electricity. Moreover, frequent power interruptions cause substantial economic losses.…

    • 1790 Words
    • 8 Pages
    Better Essays
  • Satisfactory Essays

    I have interviewed Energy Minister Pityasavasti Amranand, and received information from the Bangkok Post of 27th Jan 2008…

    • 600 Words
    • 3 Pages
    Satisfactory Essays
  • Better Essays

    Merchant Power Plants

    • 1310 Words
    • 6 Pages

    mw is met, the all India peak shortages would be at an average of 16.3% or 18,913 mw. The ministry of power…

    • 1310 Words
    • 6 Pages
    Better Essays
  • Powerful Essays

    Nowadays, shortage of electricity is one of the prominent problems in our country. Many researches make an alternative source of electricity but still lack of supply. There are many places inside the country still suffer from high electric bills due to power shortage of electricity. The more it becomes less; it becomes expensive that an ordinary people can’t afford.…

    • 1363 Words
    • 6 Pages
    Powerful Essays
  • Satisfactory Essays

    Despite the advent of technological breakthrough, different issues and controversies about the shortage of Power Supply is an important matter being talked about nowadays.…

    • 348 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    * The Generation and Distribution of power are the two facesof the power sector. Therefore, maintaining a proper balance should be the main task of the Corporation/Boards. They should plan properly to meet the demand for power on a longtime basis during the 10th plan and even beyond.…

    • 429 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Hr Policies in Ntpc

    • 2533 Words
    • 11 Pages

    Indian power sector or the power industry in India comprises of the various governmental bodies looking after the power systems in India, power generation industry and technologies in India, power supplies, power industry report showing the analysis of the power scenario in India, the Indian power requirements and shortage, the various power supply unit and the power infrastructure in India. Various central…

    • 2533 Words
    • 11 Pages
    Powerful Essays
  • Satisfactory Essays

    Supplier power – Has very low impact. Mainly limited to coal / power wherein the government pricing would have an impact. But this would be common to all companies…

    • 303 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    The power sector is one of the most prominent sectors of an economy and a growth in this sector definitely fuels the growth of the economy. The power sector has received adequate importance ever since the process of planned development started after the Independence. The generation of Thermal power started with the construction of first thermal power unit (1MW) at Calcutta in the year 1898.Back then, generation and distribution of electric power was carried out by private entities like Calcutta electric which is still existent. Electric power was limited to few urban places and the rural places were devoid of any power till independence. But, after Independence the entire…

    • 3168 Words
    • 13 Pages
    Powerful Essays
  • Good Essays

    MODERN TRENDS

    • 2350 Words
    • 10 Pages

    Power is the basic need for the economic development of any country. Availability of electricity has been the most powerful vehicle of introducing economic development and social change throughout the world. The process of modernization, increase in productively in industry and agriculture and the improvement in the standard of living of the people basically depend upon the adequate supply of electrical energy. Electrical energy has been the highest priority in the national planning process.…

    • 2350 Words
    • 10 Pages
    Good Essays
  • Powerful Essays

    Sector wise installed capacity in India and how the shares of each sector changed over the decades & Rates of growth…

    • 12168 Words
    • 49 Pages
    Powerful Essays
  • Good Essays

    Legislative

    • 582 Words
    • 3 Pages

    Position him in parliament means a bill passed by Parliament will get consent from him. He will command the Keeper of the Great Seal of imposing mark on the bill.…

    • 582 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Oil and Gas

    • 683 Words
    • 3 Pages

    NEW DELHI: Rs 40,000 crore of investments in power plants with an installed capacity of 4,904 MW are at risk of turning into non-performing assets due to non-availability of domestic natural gas, primarily due to low production at the Reliance-run KG offshore fields. The government has told Parliament's finance standing committee that with supply to the power sector from the KG D6 field becoming zero since March this year, "... significant gas-based power capacity got stranded or (is) operating at sub-optimal level" . The committee on Friday adopted a report urging the government to rethink its recent decision to sharply hike gas prices while noting the oil ministry's dire warning that "... an investment if Rs 40,000 crore is at risk of becoming non-performing assets due to non-availability of indigenous natural gas" . The petroleum and natural gas ministry told the panel that against a requirement of 72 mmscmd (million metric standard cubic metres per day) of gas needed to run power plants as 70-75 % of plant load factors, the actual supply was a mere 27 mmscmd. Similarly, the steel ministry said that "due to fall in production of KG D6 gas, steel sector is getting zero supply" and "due to non-availability of natural gas to existing units, there is under-utilization of already created capacity of over 10 million tonnes a year" . The committee, headed by BJP leader Yashwant Sinha, has said Reliance be made to make good shortfall in gas production at the old price of $4.2 mmbtu rather than benefitting from revised rates. A curtailment of gas supplies to steel plants run by Essar Steel, JSW Ispat and Welspun Maxsteel will affect the financial viability of these units…

    • 683 Words
    • 3 Pages
    Satisfactory Essays