Ncc Case
National Cranberry Cooperative

Ques 1: Draw a detailed process flow map of the current process at receiving Plant#1. What is the capacity of each operation in the process?

Refer to the power point presentation. 2. What is the maximum long-term achievable throughput rate of receiving Plant 1? What factors affect this throughput rate?

The Truck arrival rate is at 20 Trucks/Hr. This year based on the numbers there is going to be 70% Wet and 30% Dry Berries.
Dried Berries:
Throughput rate = 30% of 20 Trucks = 6 truck (dried)/hr @ 75 bbls = 450bbls/hr Wet Berries:
Current Throughput rate possible = 600 bbls/hr or 8 Trucks/hr (Bottleneck)
Since 70% of 20 Trucks implies 14 Trucks/hr, we can expect the maximum long-term achievable throughput rate at 14Trucks/hr for Wet berries.
Long-term achievable throughput rate of Receiving Plant 1 = 450 bbls/hr + 600 bbls/hr = 1050 bbls / hr.

3. Currently what is (are) the major reasons for trucks waiting and excessive over time?

The major reason for trucks waiting and excessive over time is caused by the bottlenecks in the existing system. The Drying station is the bottleneck in the current system. The maximum input to the Dryer station is an average of 1050 bbls/hr but it can only handle a maximum capacity of 600 bbls/hr. As the input rate exceeds the maximum capacity of the station, the waiting times have become inevitable.
The next vulnerable bottleneck is the “Jumbo Separator” system. Once the Drying station capacity is increased to meet the input rates, the input rate (20 Trucks/hr) for Jumbo Separators exceeds the maximum capacity of the station (16 Trucks/hr).

4) On average, how long will trucks have to wait on a busy day? Assume at 11a.m. start of processing of berries and a continuous arrival of berries of 1500 bbls/hr?
As the Drying station is the bottleneck, it would be enough to consider only the wet berries processing capacities into consideration to estimate the

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Hog Problem

    • 370 Words
    • 2 Pages

    The next recommended step is to turn this data into a specific number of loads, and then assign the loads to trucks, and see how many we would need to complete that particular days required shipping (see appendix- TABLE D).…

    • 370 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    On average, 18000 barrels arrive over the 12hr span that the business is open. This means approximately 1500 barrels of berries are input into the process per hour (18000barrels/12hrs). The capacity of the Kiwanee dumpers was given as 3000 b/hr., and I was able to calculate the implied utilization by dividing the berry input rate by the capacity(1500bbl/hr divided by 3000bbl/hr). To calculate the actual utilization of the dumpers, you must first determine the flow rate of the system. Only 25% of the berries are dry and 75% are wet. This sums to 375 dry berries per hour (1500 input/hr x.25) and 1125 wet berries per hour (1500 input x .75). The dry berries have 16 bins that hold 250 barrels a piece, adding up to a total of 4000 berries that can be stored. The wet berries have 8 bins that hold 250 barrels and 3 bins that hold 400 barrels, adding up to 3200 barrels total for storage. The capacity of the DeStoners was given as 1500bbl/hr. The implied utilization would be the input rate (1500bbl/hr) divided by the capacity (1500 bbl/hr). Since the bottleneck does…

    • 1003 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    According to the data provided, there is 50 % of incoming berries which were wet harvested. In the absolute terms, this amounts to 750 bbls/h. The three drying machines can only handle 600 bbls/h altogether, meaning that 150 bbls of berries have to be stored in the bins each hour while waiting for the drying process. The second bottleneck is “located” at the separators. The three separating lines have the capacity to separate 1200 bbls/h, while there are 1350 bbls/h ready to be separated. Therefore, 150 bbls of dry berries have to be stores each…

    • 895 Words
    • 4 Pages
    Satisfactory Essays
  • Better Essays

    facility. Coal trucks filled with coal arrive at the port facility at the mean rate of 149 per…

    • 1929 Words
    • 19 Pages
    Better Essays
  • Good Essays

    The demand for and production of cranberries is uneven. The seasonal nature of cranberry harvesting creates a need for a flexible system that can utilize full capacity in harvesting season and minimize loss from excess capacity during off season. NCC current system at Receiving Plan #1 is not meeting the input levels. NCC has two immediate options: increase the temporary…

    • 1103 Words
    • 5 Pages
    Good Essays
  • Good Essays

    National Cranberry

    • 508 Words
    • 3 Pages

    How might transport vehicles be utilized more effectively? Should crews be scheduled differently on peak days?…

    • 508 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    My management program is based on a 12 foot by 18 foot greenhouse with screened vents, air conditioning, dehumidifier, and two octagonal coliseums with four tiers each holding at least 16 plants, for a minimum 128 plants total. A successful harvest should be 90-100 pints of berries per season.…

    • 1593 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    At this rate, the wet bins would be completely filled at 3:25pm. At 7:00pm, when the last truck has arrived at RP1, 4,560 barrels of wet berries would have accumulated, of which 1,360 barrels would be on the trucks. With the plant processing rate of 600 barrels per hour, the trucks would be emptied by 9:16pm with the last truck having waited for 2 hours 16 minutes. The entire process stops at 2:36am, with the total processing time of 19 hours 36…

    • 1691 Words
    • 7 Pages
    Good Essays
  • Satisfactory Essays

    4. On average, how long will the trucks have to wait on a busy day? Assume a 7am start of processing of berries.…

    • 426 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Natural Blends Inc

    • 331 Words
    • 2 Pages

    Filtration Process : - Operation time = 90min -Filter Change = 30min -Capacity = 20,000lbs/hr…

    • 331 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Cranberry Case

    • 730 Words
    • 3 Pages

    (2)Accounting for cariabilities in intra-day truck arrivals, percent age of berries arriving wet, and processing time is likely to add support to the need for additional drying capacity.…

    • 730 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    National Cranberry

    • 603 Words
    • 2 Pages

    The wet berry drying process had a utilization percentage of 250%, which exceeds 100%, making it the bottleneck in this scenario. Even though National Cranberry has three dryers to be used during the drying process, each only has a capacity of 200 bbl, which means the three dryers can only collectively dry 600bbl of cranberries in one hour. This leaves 525bbl of wet berries in inventory each hour.…

    • 603 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Since we have a processing capacity of 16,000 bbls per day, where 70% (11,480) are Wet and 30% (4,920) are Dry, there are constraints of 957/hr and 410 bbls/hr respectively [see Exhibit 1]. The plant starts getting truck deliveries at 11:00 AM at a rate of 18 trucks pre hour, but these trucks need to wait until 7:00 AM when the employees arrive for their work day, and the plant opens up. This ultimately creates a problem that NCC is most aware of, as they do not want truckers waiting around doing nothing in the parking lot. However,…

    • 1079 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Cranberry and Berries

    • 1276 Words
    • 6 Pages

    As I mentioned earlier, the bottleneck area of this case is the short capacity of dryer and that of the wet bin. To be specific, in the peak, approximately 19,000 barrel of the berries arrives to the plant in a day and 70% of those, 13,300 barrels, are wet and needed to be dried. To say…

    • 1276 Words
    • 6 Pages
    Good Essays
  • Powerful Essays

    Destoning capacity- There are 3 destoning units and capacity of each unit is 1500 bbls, so the total capacity of destoning unit is: (1500 * 3) that is 4500 bbls.…

    • 1129 Words
    • 5 Pages
    Powerful Essays