Question 1

The receiving plant No. 1 is facing 3 problems:

1) Too much waiting time for trucks before they can unload their berries;

2) The overtime costs are too high;

3) The grading process of the berries is inadequate.

Question 2

Question 3

Process Flow Diagram for wet and dry cranberries

Working Note:

Arrival of berries- In the process fruit, first berries are arrived on receiving plant no.1. In which, average truck delivery was 75bbls.

Capacity of Temporary Holdings- 27 bins are used for holding both dry and wet berries. In which, 1-24 holding bins will hold 250bbls of barriers each and 25-27 will held 400 bbls of berries each.

Total capacity is: [(250*24) + (400*3)]

[6000 + 1200] that is 7200 bbls.

Destoning capacity- There are 3 destoning units and capacity of each unit is 1500 bbls, so the total capacity of destoning unit is: (1500 * 3) that is 4500 bbls.

Dechaffing capacity- There are 3 dechaffing units and capacity of each unit is 1500 bbls, so the total capacity of dechaffing unit is: (1500 * 3) that is 4500 bbls per hour.

Drying Capacity- There are 3 drying units and capacity of each unit is 200 bbls, so the total capacity of drying unit is: (200 * 3) that is 600 bbls.

Milling Capacity- In this step, berries are transferred to separator building from receiving building. Two types of quality grader are used in this step first jumbo separators and other is bailey mills. For this, 3 separator units are used, in which average capacity of each unit is 400 then total capacities are 1200 bbls (400 *3).

Bulking Capacity- Berries are directly loaded into bulk trucks. There are 2 bulk stations and capacity of each station is 1000 bbls, so total bulking capacity is 2000 (1000*2).

Bagging capacity- Maximum 8000 bbls are bagged in a 12-hour period. The maximum capacity in one hour is 667 bbls (8000/12).

Answer 2

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Week 6 Lab Report

    • 426 Words
    • 2 Pages

    Approximately how many tons of lignite would be required to produce the amount of heat generated by one ton of anthracite coal?…

    • 426 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    required to run the holding bins empty and do bulk loading. Although dry fruit could be held in the…

    • 3588 Words
    • 15 Pages
    Good Essays
  • Powerful Essays

    Macro : Nse Data

    • 1158 Words
    • 5 Pages

    We start by making a process flow diagram for the flow of berries at RP1 from the moment berries arrive at the RP1 in trucks to the moment they leave in RP1 after being bag packed, bulk loaded into trucks or loaded into bulk tins.…

    • 1158 Words
    • 5 Pages
    Powerful Essays
  • Good Essays

    When Hugo Schaeffer, vice president of operation at the National Cranberry Cooperative (NCC) went through last fall’s process fruit operation at receiving plant No. 1(RP1) with the superintendent Will Walliston, he found that overtime costs and the time waiting to unload were still two big problems.…

    • 592 Words
    • 3 Pages
    Good Essays
  • Good Essays

    National Cranberry

    • 603 Words
    • 2 Pages

    On a busy day, the maximum throughput rate for RP1 is 975 bbl/hr (375 of these are dry berries, and 600 are wet berries). RP1 could increase its maximum throughput rate by increasing the number of wet berries dried per hour.…

    • 603 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    In accordance, to our text, in order to be able to identify each machines center, along with calculating the system using the detailed data provided, we must connect other key factors before coming to any conclusions. Beck’s Manufacturing includes assembling, drilling, milling, grinding and boring. Thus, we also need to know that each type of machine requires each finished product to adhere to one operation. Another, important key is knowing that each facility has a two 8-hour shifts per day, but this doesn’t include a maintenance shift which is postponed to in the third shift. “Capacity is a measure of an…

    • 1361 Words
    • 5 Pages
    Powerful Essays
  • Better Essays

    The receiving section for each plant will take delivery of the Raw materials. The driver of the…

    • 1195 Words
    • 5 Pages
    Better Essays
  • Satisfactory Essays

    2) Refer to the information above. What is the maximum inventory held in a given EOQ cycle?…

    • 1687 Words
    • 12 Pages
    Satisfactory Essays
  • Powerful Essays

    Chiller

    • 18032 Words
    • 73 Pages

    23 ⑤ Flue Gas/Hot Water with Direct-fired After Burning Type Lithium Bromide Absorption Chiller/Heater ················…

    • 18032 Words
    • 73 Pages
    Powerful Essays
  • Satisfactory Essays

    The ready mix plants start with capacities as low as 12 m3/hr. and they are very precise as far as their operations are concerned. These concrete batch mixing plants are extremely accurate and do the mixing with the help of a pan mixer or a pug mill type mixer unit. The capacity of the mixer can…

    • 433 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Caceres Semilla

    • 387 Words
    • 2 Pages

    The distribution network covers only 4 provinces and the distribution is done through farm cooperatives, farm implement dealers or other farm retail stores. Customers usually book their advance orders during the autumn and the purchases are made based on the demand. In 1980s, sales grew at a brisk pace because of aggressive marketing and the company had to buy seeds from the spot market and thus they increased the number of buyers. Currently 86% are purchased from contract growers. Some customers commit in advance to buy seeds, but they cannot hold on to their commitments. This has caused a marked increase in the inventory levels.…

    • 387 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Pieles de La Garriga

    • 1829 Words
    • 8 Pages

    I am going to start with the capacity of the machine and the capacity of the rest of the factory. As we know, if we order the…

    • 1829 Words
    • 8 Pages
    Good Essays
  • Satisfactory Essays

    Storage and Proportioning: The different raw materials are extracted from the silos in the desired proportion through table feeders and conveyed to raw mill.…

    • 433 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    The income generated from the sale of indigenous fruits is approximately Rs 300-400/Khoh or per kriah for all the three fruits per day depending upon the number of baskets they sell. However, the red variety of Sohphie fruit (Sohphie-nam) can fetch a much higher price of Rs 500-600/Kriah per day. As compared to last year sale (In 2014), the income generation from the sale of these fruits are almost the same.…

    • 1375 Words
    • 6 Pages
    Good Essays
  • Good Essays

    This is how to get the best result. You let the berries dry in the sun till all moisture has gone of them. Then you gather them and chop them very fine. (Halliday and Hasan, 1976: 17)…

    • 1389 Words
    • 6 Pages
    Good Essays

Related Topics