Finding the FGL, FFL and the Natural Ground Level

1. Find out the FGL and FFL First.

2. To find the FGL, need to find the highest RL and the lowest RL that the house is located on the property.

So, the find the FGL:

- Highest RL is 12.50; Lowest RL is 10.0.

- 12.50 – 10.0 = 2.50.

This means that there is a fall from the highest part of the house to the lowest part of the house of 2500mm or 2.5 metres.

- 2.50 / 2 = 1.25 (Cut and Fill)

3. So, FGL is:

- 12.50 – 1.25 = 11.25

4. FFL is:

11.25 + 0.3 (thickness of slab) = 11.55

5. To calculate Natural Ground Line:

Rule: If the result is positive then the NGL is below the FGL line, and if is a negative result, then the NGL is above the FGL.

FGL – RL

11.25 – 12.50 = -1.25

This means for the highest part of the house, the natural ground line is above the FGL point by 1250mmm.

For the lowest part of the house,

11.25 – 10.0 = 1.25

This means that the lowest part of the house, the natural ground line is below the FGL point by 1250mm.

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Hsc300 Week 1 Assignment

    • 320 Words
    • 2 Pages

    The value of raw and even improved land can wildly vary based on external and market forces beyond the developer’s control. For instance, land values could increase on the news of a proposed shopping center, but plummet on the finding of nearby environmental contamination. On the other hand, vertical development or a structure will have a reasonable and definite value, even when accounting for location and design (place and space). As a result, with less volatility, and yes more certainty, lenders are willing to lend more…

    • 320 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    AMU SCIN 137 Wk 3

    • 402 Words
    • 2 Pages

    5. Would you expect to find a subsidence inversion to be associated with high or low…

    • 402 Words
    • 2 Pages
    Satisfactory Essays
  • Best Essays

    During last week’s research, three testable outcomes were identified: the value will increase if the home is closer to the city, the value will decrease if the home is closer to the city, or there is no direct correlation. Team B hypothesizes that if a property is closer to the city, the value will be higher. It has been determined that the median, mean, minimum, and maximum values should be assessed and examined to determine if this hypothesis is accurate. Team B will be using the mean home prices in group one and two to determine if there is a significant difference in home prices for homes less than 15 miles from the city compared to those equal to or greater than 15 miles from the center of the city. Based on the possible testable outcomes, Team B will use the Null Hypothesis and Alternate hypothesis with the mean prices in group one denoted as µH1 and mean home prices in group two denoted as µH2.…

    • 2176 Words
    • 9 Pages
    Best Essays
  • Satisfactory Essays

    The exterior boundaries of land extend down to the depth of the deepest hole and up to the height of the tallest structure and no further.…

    • 2518 Words
    • 13 Pages
    Satisfactory Essays
  • Good Essays

    douglas house

    • 250 Words
    • 1 Page

    top entrance level to the house. Solid surfaces in combination with transparent visual penetrations to the interior, curved elements and terraces interconnected at every…

    • 250 Words
    • 1 Page
    Good Essays
  • Good Essays

    - Free floor plan where there is no loading wall in the inner building or cutting the building. That makes building looks aesthetic.…

    • 671 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Ground investigation – This happens once the walk over survey has provided the all clear for the site and it involves taking samples of the soil to see if it’s good enough to build on etc. As far as low rise housing is concerned its main objective is to determine whether strip foundations will be suitable and whether they can be designed in accordance with the simple rule of thumb approach contained in the Strip Foundations section. 4 metre max trial pits are made by hand or machine to…

    • 4013 Words
    • 10 Pages
    Powerful Essays
  • Powerful Essays

    In locating my residential area on the map. I live in an area that is susceptible to an earthquake, but the zone that I live in does not often have them. The earthquake zone where I live has an section that is shaded white in color.…

    • 1177 Words
    • 5 Pages
    Powerful Essays
  • Good Essays

    Shoring Violations

    • 1052 Words
    • 5 Pages

    deep, thus according to the table 7.2 for unstable soil, the choice is either 4’ or 2’ for the uprights horizontal spacing (uprights may be a solid “sheeting” or spaced from 2’ to 8’ apart to prevent cave-ins), as well as cross braces is either 4’ or 2’ for screw jacks of 2” STD or timbers of (6” x 6”) to hold either horizontal or vertical shoring members in place. Refer to the side table 7.1 and assume the width between (6”-8”) for house line, since it was not reported in the result investigation. However, the minimum number of the horizontal cross braces, either screw jacks or timbers, required for each pair of uprights shall be determined by the number of 4-foot zones or segment into which the depth of the trench may be divided, yet in no case shall be less than two cross braces or jacks. Further, pre planning will reduce the chance of an accident and protect people nearby work site and maintenance operator from falling into the excavation, and it will protect them from possible exposure of atmospheric hazards in the excavation as well (such as leaking gas lines or storage tanks) and define how maintenance operator will get in and out of the excavation safely. An excavation with a depth of 4 ft. or more must have a means for entering and exiting such as a stairway, ladder, or ramp that has a non-slip surfaces employees’ safety may depend on how…

    • 1052 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Multi-family structures/apartment buildings, some with evidence of dilapidation but mainly near the rural part of the community. Closer to the center of the community, new homes are being constructed closer to the…

    • 928 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Art Essay A levels

    • 1401 Words
    • 1 Page

    through a geometric architectural structure. The house is displayed in wide angle; only 1 house on a plot of…

    • 1401 Words
    • 1 Page
    Powerful Essays
  • Better Essays

    14 Altitude: An altitude of a triangle is line segment drawn from any vertex of a triangle, perpendicular to the opposite side.…

    • 1002 Words
    • 5 Pages
    Better Essays
  • Good Essays

    The location of the plant was on a bluff which was originally 35-meters above sea level. During construction, however, TEPCO lowered the…

    • 5782 Words
    • 24 Pages
    Good Essays
  • Powerful Essays

    Property Law

    • 1834 Words
    • 8 Pages

    •It may be wholly above it or below it. The space may have physical contents or may be a void. …But the land is more than those fixed contents, because if the contents of the space are physical severed, destroyed or consumed, that space itself-and so the land remains: BUTT [202] Re Trizec Manitoba Ltd (1986) 25 DLR…

    • 1834 Words
    • 8 Pages
    Powerful Essays
  • Better Essays

    house, but the front yard which is described as being like an ―extended room‖ to the house. This…

    • 33008 Words
    • 133 Pages
    Better Essays