Shoring Violations
The Oregon Occupational Safety and Health Division (Oregon OSHA) has fined TC Excavating LLC $142,800 for five violations, including two willful violations. The citation was based on an investigation of a trench that collapsed and killed an employee”. This was the head tile of the accident which revealed the responsible company was not pursuing the precautionary necessary steps during an excavation for either a sewer line or manhole was undergoing. OSHA defines an excavation as “any man-made cut (cavity) or depression in the earth's surface formed by earth removal and a trench as a narrow underground excavation that is deeper than it is wide, and no wider than 15 ft. at the bottom” (“Occupational safety and health administration,” 2013). However, …show more content…
Therefore, jobsite study, observations, test boring for soil type will provide an essential information to determine the amount, kind, and the cost of safety equipment needed to execute the work in the safest manner possibly as a general manner. Specifically, in this case of study, shoring requirement was more likely dependable on the width and depth of the trench. The accident was avoidable if the company employee did follow the shoring system element in the table (7.2 & 7.1) …show more content…
deep, thus according to the table 7.2 for unstable soil, the choice is either 4’ or 2’ for the uprights horizontal spacing (uprights may be a solid “sheeting” or spaced from 2’ to 8’ apart to prevent cave-ins), as well as cross braces is either 4’ or 2’ for screw jacks of 2” STD or timbers of (6” x 6”) to hold either horizontal or vertical shoring members in place. Refer to the side table 7.1 and assume the width between (6”-8”) for house line, since it was not reported in the result investigation. However, the minimum number of the horizontal cross braces, either screw jacks or timbers, required for each pair of uprights shall be determined by the number of 4-foot zones or segment into which the depth of the trench may be divided, yet in no case shall be less than two cross braces or jacks. Further, pre planning will reduce the chance of an accident and protect people nearby work site and maintenance operator from falling into the excavation, and it will protect them from possible exposure of atmospheric hazards in the excavation as well (such as leaking gas lines or storage tanks) and define how maintenance operator will get in and out of the excavation safely. An excavation with a depth of 4 ft. or more must have a means for entering and exiting such as a stairway, ladder, or ramp that has a non-slip surfaces employees’ safety may depend on how

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Soil Investigation: Prior to any foundation design or excavation work to take place, soil Geotechnical Investigation using process is carried out by a competent contractor, this to explore the surface and subsurface of each foundation. A CME-45B Truck Mounted Auger Drill is used retrieve soil samples, all samples are tested in an off-site laboratory. The truck operators are usually exposed to various types of…

    • 456 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    The legal case in subject is with Williams Construction, a company that was under investigation after a trench collapse, which resulted in the death of Jose Aguiniga, and serious injury to Adam Palomar, two employees with Williams Construction. At the conclusion of the investigation, under the guidelines of the Occupational Safety and Hazards Act, or OSHA, Williams Construction was charged with four violations that resulted in excessive fines. The investigation concluded that Williams Construction failed to instruct employees and managers on recognizing and avoiding dangerous work conditions, failed to ensure that employees did not have to travel more than 25 feet to a safe zone, failed to have an employee that was trained and experienced in trench safety, and failed to make sure that the walls of the air were either sloped or supported. The OSHA investigation concluded that if these regulations were followed, the tragic event could have been avoided. The legal issue is whether or not the courts and the construction company itself should up hold the violations of specific OSHA standards.…

    • 827 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    NETW320

    • 403 Words
    • 2 Pages

    6. What are the exact detailed compaction requirements as listed in the manual provided by the city for restoration of any surface that is trenched?…

    • 403 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    MR Samiullah

    • 324 Words
    • 2 Pages

    A scaffold should be able to support at least four times its maximum intended load of people and equipment.…

    • 324 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Technical Writting 12.3

    • 407 Words
    • 2 Pages

    7. Safety boots and hardhats are to be worn by all technicians working within 100 yards of the construction site.…

    • 407 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    It is the belief of OSHA that if these regulations were followed the tragic accident could have been avoided. The legal issue is whether or not the courts and the construction company itself should up hold the violations of specific OSHA standards.…

    • 797 Words
    • 4 Pages
    Better Essays
  • Good Essays

    Strategic Management

    • 1245 Words
    • 5 Pages

    References: to block size are based upon a standard block which is up to 700m2 with up to 1m fall across the block. "M" class soil classification, all services within boundaries, garage setback up to 5.5m from front boundary, even cut and fill.…

    • 1245 Words
    • 5 Pages
    Good Essays
  • Good Essays

    the safety for the residents in Moorebank is also significant. The safety management plan relating to general public needs to be published and analysed by the site safety managers. The contractors and employees are required to respect the safety management policies for the general public.…

    • 653 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    it you fix it to a foundation of 3 to 5 feet deep and up to 4 to 10 feet…

    • 110 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    M3 Health And Safety Essay

    • 1041 Words
    • 5 Pages

    Accidents are unplanned events that results in injury, could’ve resulted in injury, where equipment is damaged or damage to the environment. In modern day construction reducing the amount of accidents on site is important as there are a large amount of negative effects of an accident. These range from the financial cost of the job such as the uninsured costs and also there are moral consequences of an accident with high accident rates demotivating to the workforce. So avoiding the accident is easier than having to pay all of the different costs. This is because on most jobs it will cost less to put some control measures in that reduce the chance and severity of an accident than to pay the cost of the accident.…

    • 1041 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    A Health and safety control equipment relevant to the work should be used as explained at the site induction, method statement and toolbox…

    • 260 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    According to the Occupational Safety & Health Administration (OSHA), almost 5,000 workers were killed in 2013. Construction sites are the most dangerous and contributed to 20 percent of fatalities. While most employees only suffer minor injuries or illnesses at work, they should still seek medical treatment and file a workers’ compensation claim.…

    • 541 Words
    • 3 Pages
    Good Essays
  • Good Essays

    10. The maximum allowable slope for a type "B" excavation less than 20 feet deep is:…

    • 3949 Words
    • 16 Pages
    Good Essays
  • Powerful Essays

    Navnit

    • 24298 Words
    • 98 Pages

    of an acceptable safety level for personnel, the environment and material assets in the planning and performance of lifting operations Domain •…

    • 24298 Words
    • 98 Pages
    Powerful Essays
  • Powerful Essays

    The design process has four stages: planning, risk assessment, design and contract documents. Each stage is discussed in detail in the rest of this paper. Planning Planning questions must begin with “Is this a microtunnel project?” There are many excellent trenchless construction methods to consider in addition to microtunneling: auger boring, pipe jacking, guided auger boring, pipe ramming, guided pipe ramming, horizontal directional drilling and conventional tunneling. Depending on the project length, diameter, ground conditions, groundwater conditions, access restrictions, allowable pipe material, permits, available right of way and available shaft locations, microtunneling may not be the preferred construction method.…

    • 1708 Words
    • 7 Pages
    Powerful Essays