Case Study 1 1
Case Study 1
Project Management Analysis in the Internet Forecasting Industry

Group 4
Dilip Chinnaswamaiah, Ruiying Liu, Sandhya Aparna Pashikanti, Yingqi Yang, Hao Zhu

Executive Summary
In this case, our group used the techniques such as PERT, project crushing and visualization to solve the scheduling problems encountered in a development project at B&W Systems. We came up with the expected completion time and crashing solution to help the company meet the deadline. The problem was successfully solved.

Statement of the Problem
The 3 questions our group tried to answer were: How long will the development project at B&W Systems take? How to crash it to meet the 35-week deadline? What impact would there be if the estimated duration of some tasks changes?

Background
We referred to the lecture notes on network diagram and probabilistic time estimates. We also reviewed materials on project crashing. Additionally, before actually solving the problem, we transferred the information presented in Exhibit 1 and Exhibit 2 of the case to an Excel spreadsheet so that we could carry out calculations easily.

Methodology
First, since all the data came from the case and was already on an Excel spreadsheet, we began by calculating the expected time, variance, expedition available and slope for each task using the formulas below.

Expected time=(optimistic+4*(most likely)+pessimistic)/6
Variance=((pessimistic-optimistic)/6)^2
Expedition available=Crash time-Expected time
Slope= Expedition available/(Crash cost-Normal cost)

Calculation results can be found in Table 1 in the Appendix.

Second, with the expected time for each task available, we plotted the network diagram for the project (as shown in the next page).

Third, we found out all the paths based on the diagram and calculated the expected time, variance, standard deviation, Z value, possibility of completion by deadline and beyond deadline using these formulas:

Expected time=sum of Expected time of all the

You May Also Find These Documents Helpful

  • Powerful Essays

    Nt1330 Unit 6 Paper

    • 579 Words
    • 3 Pages

    Project Network Diagram which includes tasks, task estimates, task dependencies, resource names, and completion %.…

    • 579 Words
    • 3 Pages
    Powerful Essays
  • Satisfactory Essays

    Step 1: Construct a network diagram for the project. (NOTE: EF for activity H should be 19)…

    • 552 Words
    • 5 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Pm 592 Week 1

    • 340 Words
    • 2 Pages

    Below is a graphic representation of the detailed Work Breakdown Structure to facilitate the project on hand:…

    • 340 Words
    • 2 Pages
    Satisfactory Essays
  • Best Essays

    One of the most convenient and practical ways to represent a project in form of a diagram is using Project Network Diagram (PND). Heldman (2011) defines PND as a graphical view of a certain project, showing its activities (dependent and independent) along with their timing and the sequence they will be performed.…

    • 3462 Words
    • 14 Pages
    Best Essays
  • Satisfactory Essays

    Week 3 Aib Problems

    • 895 Words
    • 4 Pages

    Once you have constructed the network, please answer the corresponding questions. Once you answer the questions, please post your responses to the Drop Box. You do not have to submit your network diagrams, the answers to the questions are sufficient.…

    • 895 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Mgmt8665 - H M S Pinafore

    • 297 Words
    • 2 Pages

    Your task is to construct a network diagram for this project, identify the critical path and address a number of managerial issues. Given the case presentation, you will extract a work breakdown structure and an activity list. Enter your project data on to MS Project. Save the project baseline. This represents the half the assignment grade because it evaluates your use of the project management software.You will find that there is a difficulty in meeting the opening night schedule (if you follow the text exactly). Your task is to solve the scheduling problem by considering the impact on the quality of the performance as well as the additional stress on the participants. Implement your scheduling solution by saving a second baseline. Deliverable: Write a short report (6-10 pages) which extracts the key data from the schedules created in MS Project. The topics are to include (15 points): * Description (5) * A brief description of the Pinafore project task * A brief description of the main task areas (i.e. upper level of the WBS) * The logic behind the schedule (give reasons for predecessor and successor relationship; what are the key schedule constraints) * Original Solution (5) * Statement of the original schedule: i. Your Gantt chart ii. Your entry table including the task name, Duration, start, finish, predecessor, successor, Resource and cost (see below) iii. Comment on the scheduling problem * Your Solution (5) * Statement of the final schedule: iv. Your Gantt chart v. Your entry table including the task name, Duration, start, finish, predecessor, successor, Resource and cost (see below) * Justify your solution: clearly identify the impact on project risk, quality, cost and human resources Submit a word document only to LMS…

    • 297 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Project Tool and techniques: Project Charter and WBS (scope), Gantt charts, network diagrams, critical path analysis, critical chain scheduling (time), Cost estimates and earned value management (cost)…

    • 2006 Words
    • 10 Pages
    Powerful Essays
  • Satisfactory Essays

    “With PERT, a project leader first prepares a list of systems implementation activities, identifies the prerequisite activities that must be completed before others can start, and estimates the amount of time required to complete each activity. Top managers may not be interested in PERT analyses, but they are usually very concerned about the time required to finish the entire project. The project leader can estimate this completion time by examining the various paths in the PERT network. Because…

    • 911 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Rccoleman

    • 850 Words
    • 4 Pages

    1. R. C. Coleman’s top management established a required 40-week completion time for the project. Can this completion time be achieved? Include probability information in your discussion. What recommendations do you have if the 40-week completion time is required?…

    • 850 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Individual Project 2

    • 251 Words
    • 2 Pages

    Scheduling is essential to a project’s success. Forming a network activity with a visual depiction helps the team understand the relationships of tasks in a project. Two of the most common charts used in project management are the Gantt and PERT charts. The purpose of these charts is to assist with project scheduling and illustrate task dependencies. Another tool that can be used is the critical path method (CPM).…

    • 251 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    2. Meredith, Jack R. and Samuel J. Mantel, Jr. (2006). 4th edition: Project Management: A Managerial Approach. Hoboken, New Jersey: John Wiley & Sons, Inc. (ISBN-10: 0471715379).…

    • 1051 Words
    • 5 Pages
    Satisfactory Essays
  • Powerful Essays

    mean completion time for each of the six problem solving tasks. The mean (standard deviation)…

    • 5342 Words
    • 22 Pages
    Powerful Essays
  • Good Essays

    D.U Singer Hospital

    • 5200 Words
    • 21 Pages

    Question 1: Construct the nine elements of the plan identified................................................. 4 i. ii. iii. iv. v. Statement of Objectives.................................................................................................. 4 Work Breakdown Structure............................................................................................. 5 An activity on node (PERT) network ........................................................................... 6 A determination of the critical path(s) and the duration along the path. ..................... 7 An activity list, early-start schedule, slack list and master schedule. Assume every…

    • 5200 Words
    • 21 Pages
    Good Essays
  • Good Essays

    The Campus Wedding

    • 1429 Words
    • 6 Pages

    There are four main steps to the Critical Path Method. The first step is to identify each activity to be done in the project and estimate how long it will take to complete each activity. The activities are usually labeled A, B, C, D, etc. each letter will have a number next to it representing the amount of time the activity will take, usually labeled in days or weeks. The second step is to determine the required sequence of activities and construct a network reflecting the precedence relationships. To do this, it is best to first find the immediate predecessors, which are the activities that need to be completed immediately before the next activity. The predecessors are used to draw the network diagram. Once the diagram is drawn, the next step is to determine the critical path, which is the path where the sum of the activity times is the longest. The final step is to determine the early start/finish and late start/finish schedule for each activity. Slack time may occur when there is some leeway in the start and finish time. The early start and early finish times are written on the upper left and upper right corners respectively of the activity nodes in the diagram. These are the earliest possible times that the activity can start and finish. The late start and late finish times are written on the lower left and upper right corners respectively of the nodes. To calculate the early times, start with the first…

    • 1429 Words
    • 6 Pages
    Good Essays
  • Satisfactory Essays

    The Network Diagram

    • 540 Words
    • 3 Pages

    To determine timing of activities in the network diagram the following calculations were done for each node: Earliest Start-(ES), Earliest Finish-(EF), Latest Start-(LS) and Latest Finish-(LF).…

    • 540 Words
    • 3 Pages
    Satisfactory Essays