FACTS:

SS/Alicante, belonging to Compania Transatlantica de Barcelona was transporting two locomotive boilers for the Manila Railroad Company. The equipment of the ship for discharging the heavy cargo was not strong enough to handle the boilers. Compania Transatlantica contracted the services of Atlantic gulf and Pacific Co., which had the best equipment to lift the boilers out of the ship’s hold. When Alicante arrived in Manila, Atlantic company sent out its floating crane under the charge of one Leyden. When the first boiler was being hoisted out of the ship’s hold, the boiler could not be brought out because the sling was not properly placed and the head of the boiler was caught under the edge of the hatch. The weight on the crane was increased by a strain estimated at 15 tons with the result that the cable of the sling broke and the boiler fell to the bottom of the ship’s hold. The sling was again adjusted and the boiler was again lifted but as it was being brought up the bolt at the end of the derrick broke and the boiler fell again. The boiler was so badly damaged that it had to be shipped back to England to be rebuilt. The damages suffered by Manila Railroad amounted to P23,343.29. Manila Railroad then filed an action against the Streamship Company to recover said damages. The Steamship Company caused Atlantic Company to be brought as co-defendant arguing that Atlantic Company as an independent contractor, who had undertaken to discharge the boilers had become responsible for the damage.

The Court of First Instance decided in favor of Manila Railroad, the plaintiff, against Atlantic Company and absolved the Steamship Company. Manila Railroad appealed from the decision because the Steamship Company was not held liable also. Atlantic Company also appealed from the judgment against it.

ISSUES:

1. Was the Steamship Company liable to Manila Railroad for delivering the boiler in a damaged condition?

2. Was

You May Also Find These Documents Helpful

  • Good Essays

    Keller V Inland

    • 663 Words
    • 3 Pages

    The facts state that the Keller’s were in need of a industrial dehumidifier to eliminate the hot, humid, foul-smelling air near and around the pool area. Not having much knowledge of the correct size needed for the job, they received two bids. One bid on a 7.5 ton and the other on a 10 ton dehumidifier. Thinking the 7.5 ton would be too small the Keller’s had the president of Inland Metals and a representative for the manufacturer visit the club. Both agreed that the 7.5 would work. Inland then followed up with a letter stating the same information, that the 7.5 ton would work and rid the club of the issues they were having. Once the dehumidifier was installed it did not perform to the standards set by the president of Inland and the manufacturer representative.…

    • 663 Words
    • 3 Pages
    Good Essays
  • Good Essays

    This case begins with the relationship between California and Hawaiian Sugar Company (C&H), the purchaser, and Sun Ship, Inc., the contractor for the design and delivery of a vessel to ship raw sugar for C&H from Hawaii to California. Sun Ship went into contract with C&H on November 14, 1979 and agreed upon the delivery of the vessel on June 30, 1981, one and three quarter years, for the agreed upon amount of $20,405,000 . According to Cheeseman (2013) a liquidated damages clause, defined as “damages that parties to a contract agree in advance should be paid if the contract is breached”, was included and called for $17,000 per day for each day that the vessel was not delivered. Additional details from Court of Appeals, 9th Circuit 1986 indicate that C&H went into another agreement with a company by the name of “Halter” for the purchase of "one oceangoing catamaran tug boat" that was, unbeknownst to Sun Ship, supposed to connect with the vessel that Sun Ship was contracted to deliver. Sun completed the vessel, which was…

    • 714 Words
    • 3 Pages
    Good Essays
  • Good Essays

    10. On or before the date in question, Defendant, Anheuser-Busch, negligently and in violation of proper safety standards failed to employ competent and careful employees to load, secure and inspect the cargo, resulting in the freight to disembark from the truck while in transit.…

    • 833 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Defense Case Study

    • 965 Words
    • 4 Pages

    The City of Albany decided to upgrade a fleet of repair trucks in order to respond to pothole fixing. ACME manufactured a cab and chassis of a truck that was then sold to Keefer Motors. Keefer Motors sold the truck unchanged to the City of Albany. No discussion by ACME or Keefer Motors had taken place with the City as to what the city would do with the truck. Susan’s Truck Equipment was contracted by the city to add a dump bed and hoist and the truck was modified and redelivered to the City of Albany; the truck was accepted and put into immediate use. Sarah and Emma are city employees and Sarah was injured when Emma backed up the pothole truck over her. Sarah was seriously injured and is suing ACME, Keefer Motors and Susan’s Truck Equipment, arguing that the truck was defective and unreasonably dangerous because the defendants did not advise the City of Albany to install a back-up alarm and they failed to install a back-up alarm.…

    • 965 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    2. There is a contingent liability that has not been included in the financial statements. It was noted but if they are liable for their boat sinking this could lead to unidentified problems that they may be hiding.…

    • 774 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    In representation for Plaintiff, in writing, for recovery of damages in a potential case against “Gravel Is Us” Co. located in the State of Ohio. By these means, the following is the evaluation: According to our information, an employee of a dynamite blast company by the name of “Gravel is Us”, contracted by the State of Ohio, was negligent in failing to prevent you from entering its construction danger zone and causing severe injuries to you.The gravel company claims, that the street warning sign that they had previously; put up was sufficient enough to prevent harm, but are not denying their employees negligent actions.…

    • 965 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Case brief

    • 593 Words
    • 2 Pages

    Issues: 1) Whether the district court erred in concluding that hay is not a “product “for purposes of a strict liability in tort cause of action. 2) Whether the District Court erred in concluding that the Rothings negligence claim against Kallestad fails because it was unforeseeable that the hay could cause injury and death to the Rothings’ horses, thus no duty of care existed. 3) Whether the District Court erred in concluding that the Rothings’ breach of contract claim against Kallestad fails because it was unforeseeable that the hay could cause injury and death to the Rothings’ horses. 4) Whether the District Court erred in imposing discovery sanctions against the Rothings. 5) Whether the District Court erred in awarding attorney’s fees to Kallestad and denying the Rothings a hearing in respect to the calculation of attorney’s fees. (₱3-7)…

    • 593 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Law 421 week 2 work

    • 1527 Words
    • 5 Pages

    Cause in fact: Except for the breach of duty by the tortfeasor, would the injured party have suffered damages?…

    • 1527 Words
    • 5 Pages
    Satisfactory Essays
  • Good Essays

    Yes, at the time of the accident Ferry was under the control of Nettie’s. There was sufficient evidence to determine that at the time of the accident Ferry was engaged primarily in advancing the business interests and was acting within the scope of his employment. Nettie’s had the right to control the manner in which Ferry performed his duties for which he was employed (Twomey, 2013, p. 621).…

    • 68 Words
    • 1 Page
    Good Essays
  • Good Essays

    Read the 'Stateline Shipping and Transport Company" Case Problem on pages 273-274 of the text. Analyze this case, as follows:…

    • 578 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Unsw Legt 1710 Assignment 2

    • 3692 Words
    • 14 Pages

    B Cases Adler v Dickson [1955] 1 QB 158 Balmain New Ferry Co Ltd v Robertson (1906) 4 CLR 379 Bright v Sampson and Duncan Enterprises Pty Ltd (1985) 1 NSWLR 346 Canada Steamship Lines Ltd v R [1952] AC 192 Causer v Brown [1952] VLR 1 Chapelton v Barry Urban District Council [1940] 1 KB 532…

    • 3692 Words
    • 14 Pages
    Powerful Essays
  • Powerful Essays

    Business Law

    • 964 Words
    • 4 Pages

    Mrs. Bartle was injured while getting out of the railway car due to the negligence of the motorman. The franchise that operated a street railroad along this particular route was owned by Fort-second Street Company. All of the stock of this company was owned by Third Avenue Railway Company, which also had its own franchise along other streets and avenues. The Forty-second St Co was a functioning corporation that had been organized and been in existence long before the Defendant became the owner of substantially all of its stock. While the members of the two boards of directors were nearly identical, they were not quite the same. The key fact is that Forty-second was operating as a company that demonstrated, ‘separate life and operation’ from its parent, Third Avenue.…

    • 964 Words
    • 4 Pages
    Powerful Essays
  • Good Essays

    Palsgraf V. Long Island Railroad Co. (162 N.E. 99 ( NY1928); 248 N.Y. 339; 1928 N.Y. Lexis 1269; 54 A.L.R 1253; 222 A.D. 166 (N.Y. App. Div. 1927)…

    • 827 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    US vs. FOWLER G.R. No. L-49631 J. Torres FACTS: This is an appeal to the Supreme Court by the appellant, the United States, to review the decision made by the Court of First Instance (CFI) of Manila. The two defendants and appellees, Fowler et al, have been accused of the theft of sixteen (16) bottles of champagne of the value of $20 on 12 August 1901 while on board the transport Lawton. Lawton was then navigating the high seas. The said champagne bottles are part of the cargo and are owned by Julian Lindsay. The said champagne bottles were taken lucri causa, without violence or intimidation and without the consent of the owner. ISSUE: Whether or not the CFI of Manila has jurisdiction over the criminal case, theft, committed on board while navigating on high seas. HELD: The accused claim that the CFI of Manila has no jurisdiction over the case as the crime was committed on high seas and not in the city of Manila or within the territory comprising the Bay of Manila or upon the 3-mile limit which the jurisdiction extends. The prosecution contends that the Military General and Civil Commission admiralty has jurisdiction over all vessels flying the flag of the United States and the same was vested in the CFI of Manila. CFI held that it has no jurisdiction over the case. Hence, the appeal to the Supreme Court. Art. 136, by which the courts of justice of the Philippine Islands were organized, do not expressly confer jurisdiction or confer authority upon the court in Manila. The provisions of the law are clear only on civil and maritime cases but not on criminal cases committed on board. Art. No. 400, states that the Philippines has jurisdiction only with the crimes committed in a ship registered in the Philippines or those within the territorial jurisdiction of the Philippines. Lawton is neither a ship registered in the Philippines nor within the territorial jurisdiction of the Philippines. SC affirmed the decision of the lower court. LATIN MAXIM: lucri causa- the thing…

    • 637 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    In the year 2006 it was the nation’s largest municipally owned energy utility providing both natural gas and electric. This company was in the profitable stage and its main motive is to satisfied customer base and workforce. The CPS workers had limited access to IT systems and resources if they are not in the office or warehouse they are not able to attend the customer issues and can’t solve it effectively and efficiently. CPS workers had to be physically present to diagnose problems, which meant deploying employees to a particular problem site. Also the entire after sales service took several days to finish.…

    • 1181 Words
    • 6 Pages
    Good Essays

Related Topics