Bengaluru Metro Project
JOB SITE REPORT

PUTZMEISTER BOOM PUMPS WORKING AT
BANGALORE METRO PROJECT, BANGALORE

About BMRCL :
Bangalore Metro Rail Corporation Ltd (BMRCL) is a joint venture between Govt. of India and Govt. of Karnataka sharing the responsibility of implementation of Bangalore
Metro Rail Project. It is named as “Namma Metro”.
Phase I metro project started(Civil work) in June2007 .The estimated cost of project is Rs 11609 Cr.
Namma Metro phase-I network consist of two corridors :
East-West and North –South.
Project highlights: Project Routes East-West Corridor (Purple Line): Baippanahalli station to
Mysore road Terminal - 18.10 Kms
North-South Corridor (Green Line): Nagasandra station to
Puttenahalli - 24.20 KMS
Total KMS in Phase –I: 42.30 KMS
Elevated section - 33.48 KMS
Under Ground Section - 8.82 KMS
No. of Station - 40 ( 33 Elevated and 7 under ground)

PCM JSR1029

12.09.2012/Bangalore Metro/Page 1

JOB SITE REPORT

Reach and Routes:
For the implementation and execution of the project, four elevated stretches are called Reaches
& are identified so for convenience purpose. Also there are two underground sections are connecting Reach -1 and Reach-2 in East-West Corridor and Reach-3 & Reach-4 in North-South
Corridor respectively. Each Reach has been given to a contractor for execution of the project.
The details of Reaches are as under.
Section
Reach-1
Reach-2
Reach-3
Reach -3A
Reach -3B
Reach-4
Reach-4A
UG-1
UG-2

PCM JSR1029

Line
East Line
West Line
North Line
First North ext. Line
Second North ext. Line
South Line
South Ext. Line
N-S Underground Line
E-W Underground Line

Route
Cricket stadium to Baiappanahalli -6.7 kms
Leprocy hospital to Mysore Road-6.4 kms
Sampige Road to yeshwantpur -5.1 kms
Yeshwantpur to Peenya ind -4.8kms
Peenya Ind to Nagasandra-2.5 kms
National college to R V Road-4.1 kms
R V road to Puttenahalli -3.9 kms
Sampige and National College-4 kms
Cricket stadium and Magadi Road-4.8

You May Also Find These Documents Helpful

  • Satisfactory Essays

    NT1210 Unit 5 Questions

    • 821 Words
    • 3 Pages

    of a building. The per-floor edge switches have a cable connected to other switches that sit on…

    • 821 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Bus 499 Bsba

    • 561 Words
    • 3 Pages

    Barney’s objective is to purchase a new vehicle. He has found one at a local dealership and if he can sell his current vehicle and the snow tires for the retail price vice the wholesale price, he will have enough to purchase the new vehicle. Billie’s objective is to purchase a vehicle for her daughter when she graduates from college in three months. She will need transportation when she starts working.…

    • 561 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    bubbaganoosh

    • 515 Words
    • 3 Pages

    Urban Constructions has several policies, procedures and practices in place to protect the client, suppliers, our staff and our contractors. Limitations placed upon our team can restrict the project to what it will produce. To make this subdivision successful, we must follow these procedures.…

    • 515 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    BUS 323 Final Project

    • 2516 Words
    • 7 Pages

    The UFV School of Business has recently learned that high school student advisors are telling…

    • 2516 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    Nvq 2 Cuting Assesnent

    • 1083 Words
    • 5 Pages

    Next take sections from each side facing the front of the client take each side section and over direct at 45’degress maintaining…

    • 1083 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    PROJ598

    • 2385 Words
    • 11 Pages

    This will be single source negotiated contract. The instructions to the Contractor are provided below.…

    • 2385 Words
    • 11 Pages
    Powerful Essays
  • Good Essays

    Delightec Case

    • 534 Words
    • 3 Pages

    The firm currently rents a 12,000-square-foot, L-shaped building. This building houses four basic sections:•the office area,•an engineering area,•a machine shop,•and an assembly area.…

    • 534 Words
    • 3 Pages
    Good Essays
  • Good Essays

    that you will need to allow for the assembly of scaffolding for parts of the work,…

    • 1181 Words
    • 5 Pages
    Good Essays
  • Good Essays

    By: Khermouch, Gerry. Architectural Record, May2004, Vol. 192 Issue 5, p169-176, 6p, 4 Color Photographs, 1 Diagram; Reading Level (Lexile…

    • 580 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    The first main concern for the construction of the project is the funds. So as the mayor of Calcutta my first step is to get the funds required to start up this project. These funds would be acquired from various sources like donations, taxes, and loans. Once the funds are acquired, the next step would be to look into the plan of the project. I would take the opinion of a few well-known engineers before an actual plan is taken up. I would make it a point to see to it that the various pros and cons of different plans are taken into consideration before starting the project. Then I would select that project which would give us the maximum benefits within the obtainable budget and least disturbances to the normal life in the city. I would consider the efficient labor to carry on the work of this project.…

    • 339 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    Shoring Violations

    • 1052 Words
    • 5 Pages

    deep, thus according to the table 7.2 for unstable soil, the choice is either 4’ or 2’ for the uprights horizontal spacing (uprights may be a solid “sheeting” or spaced from 2’ to 8’ apart to prevent cave-ins), as well as cross braces is either 4’ or 2’ for screw jacks of 2” STD or timbers of (6” x 6”) to hold either horizontal or vertical shoring members in place. Refer to the side table 7.1 and assume the width between (6”-8”) for house line, since it was not reported in the result investigation. However, the minimum number of the horizontal cross braces, either screw jacks or timbers, required for each pair of uprights shall be determined by the number of 4-foot zones or segment into which the depth of the trench may be divided, yet in no case shall be less than two cross braces or jacks. Further, pre planning will reduce the chance of an accident and protect people nearby work site and maintenance operator from falling into the excavation, and it will protect them from possible exposure of atmospheric hazards in the excavation as well (such as leaking gas lines or storage tanks) and define how maintenance operator will get in and out of the excavation safely. An excavation with a depth of 4 ft. or more must have a means for entering and exiting such as a stairway, ladder, or ramp that has a non-slip surfaces employees’ safety may depend on how…

    • 1052 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    Starting with the architecture and the design of the atrium, PBNDML prepared the project specifications and G.C.E. for the drawings in structural engineering. From the structural drawing, the Havens used it as a basis for shop fabrication drawings.…

    • 1510 Words
    • 7 Pages
    Powerful Essays
  • Powerful Essays

    Subway Project Plan Overview

    • 10327 Words
    • 42 Pages

    This project entails opening two Subway Restaurant franchises. The project is described and potential problems identified. The mission, scope, and measuring the progress of the project are also discussed. The first step is applying to Subway for a franchise. Once the application has been accepted, the real work begins. Using Microsoft Project, each phase of the project can be monitored to ensure successful completion.…

    • 10327 Words
    • 42 Pages
    Powerful Essays
  • Better Essays

    Construction Management

    • 1103 Words
    • 5 Pages

    Construction contracts structure the way in which construction is purchased. There are variety between construction purchasing system and buying something in a store for instance mobile phone or sofa. When we have the finished product available for our inspection, we can decide whether it meets our requirements. Since the final product is available, we can purchase it from a single store. With the construction it works different. The facility is purchased before it is „manufactured” based on set of drawings and work descriptors. Finally item requires the purchaser to coordinate many entities to include:…

    • 1103 Words
    • 5 Pages
    Better Essays
  • Good Essays

    dubai metro

    • 905 Words
    • 4 Pages

    ComFlor® case study Dubai Metro Project, United Arab Emirates Client: Government of Dubai Road & Transport Authority/RTA Project management and supervision: Systra-Parsons Designer: WS Atkins & Partners Overseas -ATKINS Main contractor: Dubai Rapid Link Consortium/DURL (Obayashi Corporation - Kajima Corporation - Yabi Merkezi & Mitsubishi Heavy Industrial) Decking system: ComFlor® 80 Telephone: 0845 30 88 330 The Dubai Metro urban train network is a major transport infrastructure development that is already being used by over 200,000 rail travellers a day. It carried 10 million passengers in its first six months of operation and will soon become the World’s longest fully automated metro network, surpassing the Vancouver Skytrain by one kilometre. Over 60,000m2 of ComFlor® 80 composite floor decking has been used in 38 stations, on footbridges, walkways, platforms and all elevated public areas.…

    • 905 Words
    • 4 Pages
    Good Essays