Preview

Airport Director Challenges

Satisfactory Essays
Open Document
Open Document
493 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Airport Director Challenges
Airport Directors Biggest Challenge

Today, Airport Directors must work hard and stay sharp to accomplish any challenge that they are faced with. Airport directors face many challenges such as anything from dealing with the current economy to wildlife around the airport. I strongly feel that the biggest challenge that Airport Directors are facing today is the overall coordination of an airport. There are many people that work at an airport to make sure it runs the way it should and it’s the airport director’s job to make sure everyone is doing their job correctly and efficiently so the airport runs the way it should. If even one worker makes a mistake, it can cause a huge chain reaction causing many problems for the airport. An airport that isn’t coordinated well will cause people to avoid going and using that airport and overall leading to ultimate failure of the airport. Let’s say for example, the airplane baggage boy that is responsible with loading luggage onto the airplane falls asleep on the job and forgets to load the baggage, then the plane takes off and one of the workers on the plane notices the luggage is missing. The plane then has to make a 180 and come back to land to pick up the missing luggage. In this situation, the airport director really must step in, in order to fix this problem quickly without causing too much delay for other aircraft. The director must make sure a worker or workers are ready to load up the plane, he must contact the current air traffic controller and find out where he or she will park the plane and be sure that the plane is marked as delayed, etc. Even if it’s a normal running day at the airport with no problems, the airport director still must work hard to make sure that everything is running as it should and that there are absolutely no problems with coordination throughout the airport, which involves parking, ground transportation, air traffic

You May Also Find These Documents Helpful

  • Good Essays

    If the Manchester Airport decided to make some changes in their technology use within the airport then they may have to consider following:…

    • 1662 Words
    • 7 Pages
    Good Essays
  • Better Essays

    The barriers involved in the domestic environment of the airline industry and in particular with US Airways are plentiful. The first and most important one is the FAA (Federal Aviation Administration).…

    • 1045 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    9/11 and Airport Security

    • 3569 Words
    • 15 Pages

    If one were to take a walk through the airport 11 years ago and compare it to how it is now, they would find multiple differences, from the people working there to the machines they worked with, everything would be different. For now, let’s look at the people, "ten years ago airport police were viewed as a little more than custodians"Those who were hired did not have the ability to detect things that could be harmful to the plane of its passengers, things like knives, bombs, guns, poisons and other dangerous substances. This lack of skill was the result of “constant turnover in the workplace coupled with poor training due to unattractive…

    • 3569 Words
    • 15 Pages
    Powerful Essays
  • Powerful Essays

    However, Heathrow authorities have faced a big problem, whether to build a new airport (option 1) or…

    • 2876 Words
    • 12 Pages
    Powerful Essays
  • Powerful Essays

    Many organizations create a comprehensive crisis plans in order to be prepared for any crisis Hicks (2012). If people with in the organization are not aware of what is going on, and what plan to implement, they will not be able to act appropriately and perform their job duties, and that can cause a bigger chaos. The director’s job is to be able to choose appropriate communication channels to keep all the employees in the organization informed as well with a plan of action to portray a sense of calmness regardless of what is going on and that can be hard. If the appropriate communication channels are not used, they organization can fall apart and the public will suffer the effects of their challenges. If the public is not informed of what is going on using the correct channels of communication, they will feel a sense of distrust and panic can arise. That is why is important to keep the information simple, accurate, honest and delivered in a timely manner. If they are issues where they don’t know the answer its ok to say so instead of covering information. The public needs to know that there will be an action plan in order and that the organization has the situation under control. Helping the public to understand the roles of…

    • 2017 Words
    • 9 Pages
    Powerful Essays
  • Best Essays

    Szyliowicz, Joseph S., and Andrew R. Goetz. "Getting realistic about megaproject planning: The case of the new Denver International Airport." Policy Sciences 28 (1995): 347-365. Print.…

    • 2235 Words
    • 9 Pages
    Best Essays
  • Satisfactory Essays

    Anatomy Analogies

    • 470 Words
    • 2 Pages

    Analogy- In a restaurant the manager is in charge of telling their employees their duties in the restaurant.…

    • 470 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    In November 1989, ground was broken on the construction of the Denver International Airport (DIA). A typical master plan approach was taken by the City of Denver during the initial conception of the DIA project, and eventually a consulting team was awarded a contract to help due to their expertise in the fields of transportation and construction. A final master plan was created and presented to the City of Denver that called for the construction of the world’s most efficient airport. The new airport was to be built from the ground up with no limitations. The plan was to allow for growth and expansion without compromising efficiency. The high costs associated in building this new airport were understated…

    • 1695 Words
    • 7 Pages
    Good Essays
  • Powerful Essays

    BAE

    • 1989 Words
    • 7 Pages

    The DIA project complexity was grossly underestimated by the airport Plan Management Team(PMT) that lacked the needed skill composition for a project of such a magnitude . From the onset of the airport building plans adequate provision was not made for an integrated baggage-handling system, rather it was assumed that the individual airlines would make their own baggage handling arrangement without seeking their comprehensive support.…

    • 1989 Words
    • 7 Pages
    Powerful Essays
  • Satisfactory Essays

    | Responsible for developing a plan to build the airport. Also service as Project Managers…

    • 543 Words
    • 3 Pages
    Satisfactory Essays
  • Better Essays

    Dia Conspiracy Theory

    • 1189 Words
    • 5 Pages

    Thesis Statement: Denver International Airport has many serious and questionable characteristics to it: It is the subject of many unexplainable symbols, images, and stories inside and outside of the airport.…

    • 1189 Words
    • 5 Pages
    Better Essays
  • Good Essays

    Manchester Airport

    • 2892 Words
    • 12 Pages

    3. Local publics mainly consist of the airport’s neighbors. Obtaining the goodwill of the local public will make it much easier to live harmoniously and reduce short-term local difficulties. Noise, air and waste pollution are some of the major concerns of the airport.…

    • 2892 Words
    • 12 Pages
    Good Essays
  • Satisfactory Essays

    In 2001 (SDCRAA) was created to be implemented in 2003 by the senior director of the aviation division in the port of San Diego, Thella Bowens. She was held responsible for the transition of operations from the airport authority to SDCRAA. Because Bowens had a good experience in the organization, this made her important in providing support to the operation in develops the transition plan as well as dealing with legal and regulatory issues. The group led by Thella Bowens understood the importance of SDCRAA quickly becoming a separate organization and suggested studying the existing strategic plan to gather the needed resources for this project. Bowens chartered the Airtport Transition Team to ensure the smooth and seamless transfer of operations and public services provided by the airport. In May 2002, seven employees were selected from the Aviation Division to improve members of the Airport Transition Team .The method was to get people with the ability to work within a process yet think outside of the box, to communicate well with others in a team, and influence directors without having formal authority. The plan phase also determined the when, where, and how of the plan. A “war room” was established for the team to and serves as a communication hub. The team named themselves the “Metamorphs” and many of its members came from different parts of the organization. SDCRAA had only one worker in 2002 which is Thella Browens she was dealing with regulatory issues at that time such as property transfer and the transitioning of workers. She also helped in passing the legislation which insured the employees their jobs. Furthermore, Browens renegotiated the union contract together with working beside an external counsel and state senators. The implementation process required a decision on the best way to bring about the change. The strategic plan evolved during the transition, had two important elements:…

    • 537 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Assignment1

    • 436 Words
    • 2 Pages

    Hong Kong International Airport (HKIA) was built to replace the older Kai Tak Airport, situated in the center of urban Hong Kong. Population congestion dictated that the majority of the new airport would come from a sea reclamation project. The project was massive in scope, involving the creation of the world’s largest indoor covered area (for the terminals), the longest suspension bridge, and a high speed rail system, and so on. Original financing for the project was set at US$6.4 billion, and the cost of the additional project elements added another US$2.5 billion to overall cost. When completed, the airport was slated to accommodate over 87 million passengers and 9 million tons of cargo each year. The opening of the new airport in 1998, after one year delay in completion and an actual cost of around US$20 billion, faced many technical problems; for example, the baggage handling equipment was not ready. The first two weeks of the new airport’s operation were nightmarish, as aircrafts experienced huge delays, planes took off with the wrong luggage or none at all, baggage was lost, and flight information systems did not work. It was difficult to determine which of the multiple subcontractors for the project were responsible for each miscue or technical problem, because the project’s organization chart was complex, with multiple responsibility paths. It was also discovered that the Airport Management Division, responsible for organizing these systems, did not have any contingency plans and had done no risk management whatsoever. No real integration existed between different subsystems within the airport’s management and inadequate training of personnel. Following a lengthy problem…

    • 436 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Reception Area Analysis

    • 1671 Words
    • 7 Pages

    Priority must be given to some visitors, such as police and the press, even if they have not made appointments. Furthermore, if an appointment has been made for someone to see the managing director and then a managing director of another large organisation arrives at the same time without an appointment, the receptionist has to decide which director should be given priority.…

    • 1671 Words
    • 7 Pages
    Good Essays