Preview

The Design of Drains for a Community (Ayeduase)

Good Essays
Open Document
Open Document
1001 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
The Design of Drains for a Community (Ayeduase)
DRAINAGE SYSTEM DESIGN
Objective: The drainage system for the project functions to ensure effective transportation of storm water in order to avert the occurrence of flooding of the site. It also helps to safely discharge grey wastewater from buildings to their end points.
NATURE OF SITE, LOCATION AND TOPOGRAPHY:
The sight, predominantly sandy, slopes to the south-western part. Due to this topography, water flows to the southern part of the community and since there are insufficient drains to collect the water especially during heavy downpour, flooding occurs.
Two U-drains are located along the road that joins the storm drain located at point X on the map. One from the Ayeduase gate with the other at a distance Y, away from the storm drains at X. There are no further drains along the road until a culvert at a point, P on the map. The distance of no drains is where most flooding occurs during heavy downpour of rain. From the culvert is a drain that joins the storm drain with double culvert at a point C. This storm drain connects to the main stream behind Nana Adoma Hostel. From the Ayeduase gate downwards is another drain that joins the main stream represented by a blue line on the map. All drains form a network and later join the storm drain which in turn empty into the stream.

STANDARD DESIGN
The Road Design Guide by the Ghana Highway Authority was used as the standard for the design of all drains
DESIGN RETURN PERIOD
A 20 years return period was used in the design of all drains, both secondary and tertiary

IDF CURVE
Using rainfall-intensity-duration curve for Kumasi, obtained from the Kumasi Metropolitan assembly, the rainfall intensities for a chosen return periods can be estimated. The total peak flow for each of the catchment areas can also be estimated with the values from the IDF curve. This is used for the sizing of the drains.

CALCULATION OF DISCHARGE
For the discharge of each drain, the rational formula will be used with the assumption that the same

You May Also Find These Documents Helpful

  • Good Essays

    Admit that in a storm drainage system, piping, plumbing, components, and materials used in the collection and conveyance systems shall be manufactured of materials approved for the intended application and compatible with any disinfection and treatment systems used.…

    • 657 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    With heavy rain and lack of drainage system, flooding often occurs in the business district of Kaka'ako. Heavy rain also causes sewage to back up, leaving an unpleasant smell in the neighborhood. This poor drainage situation also serves as…

    • 165 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    The PerkFilter unit offers an innovative and economic alternative for Best Management Practice (BMP) implementation in new and retrofit applications where space is limited and effective stormwater treatment is required. The PerkFilter device can be used to help meet Total Maximum Daily Load (TMDL) requirements for removal of solids, trash, debris, and petroleum hydrocarbons. The device can also be a critical component of a comprehensive Low Impact Development (LID) strategy to help increase the service life of infiltration, detention, and retention systems as well as other stormwater treatment…

    • 340 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Mr Sean

    • 2500 Words
    • 10 Pages

    The projects objective is to design a bridge spanning across the Murrumbidgee River located near Gundagai. Through the use of hydrological data and hydraulic analysis we will determine the required height of the bridge corresponding to a specific frequency of flood.…

    • 2500 Words
    • 10 Pages
    Good Essays
  • Powerful Essays

    Drainage and Service Ducts

    • 15620 Words
    • 63 Pages

    Volume 1 Specification for Road Works Series 500 Drainage and Service Ducts DRAINAGE AND SERVICE DUCTS Contents Clause Title 501 Pipes for Drainage and Service Ducts 2 502 Excavation for Pipes and Chambers 6 503 Bedding, Laying and Surrounding of Pipes 7 504 Jointing of Pipes 8 505 Backfilling of Trenches and Filter Drains 10 506 Connecting to Existing Drains Chambers and Channels 11 507 Chambers 11 508 Gullies and Pipe Junctions 14 509 Testing and Cleaning 15 510 Surface Water Channels and Drainage Channel blocks 16 511 Land Drains 16 512 Backfilling to Pipe Bays and Verges on Bridges 17 513 Permeable Backing to Earth Retaining Structures 17 514…

    • 15620 Words
    • 63 Pages
    Powerful Essays
  • Best Essays

    This project looks at a select watershed in Michigan and how the various characteristics of that watershed affect runoff from predicted storms. The chosen watershed was the Tobacco River that flows into Lake Superior Tasks were performed to first delineate the watershed, calculate the soil and land use, use that data to predict a 100 year storm, and to delineate the watershed using ArcGIS. The area and the perimeter of the watershed varied greatly between the hand drawn delineation (260% error) and the ArcGIS because of missing a large tributary into Tobacco River that greatly expanded the area. Assuming the hand delineation was an ok representative of the watershed, the hydrologic model found the total abstraction to be 4.82 inches, a peak discharge of 217 cfs, and a basin lag time of 11 hours. Additional…

    • 3468 Words
    • 14 Pages
    Best Essays
  • Satisfactory Essays

    Envs120 Final Exam

    • 815 Words
    • 4 Pages

    Discuss the various types of floods with particular reference to magnitude, climate and environmental impacts. (25)…

    • 815 Words
    • 4 Pages
    Satisfactory Essays
  • Good Essays

    The results of this sampling program were used to determine the final location of the groundwater extraction wells. After that, URS initiated on-site construction activities in August 1999. They firstly uncovered seven dry wells approximately 3 m in diameter and 4.5 m deep which were abandoned before, as monitoring wells. Then three extraction wells and two monitoring wells were drilled. Besides, some other RA activities were performed. They trenched and installed the pipeline and electrical cables from the treatment facility to the extraction wells, and installed the reinjection trench, which were necessary for pumping groundwater into treatment facility. A building in which the treatment facility would be installed was constructed, firstly the building foundation and concrete slab, and secondly the pre-engineered metal building. After the construction of the building, the process equipment was installed. Then, an approximate two-inch thickness of stone cover was placed. Finally, they tested the groundwater treatment facility. The grading of this site was also done at this…

    • 822 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Rain Water Harvesting

    • 6379 Words
    • 26 Pages

    Introduction: Till about thirty years back, the areas around our homes and offices used to be unpaved and the rain falling on these areas would percolate into the soil and remain there for being drawn through shallow open wells. With the proliferation of flat complexes, not only have these areas been paved and percolation of rainwater into the soil almost totally stopped, the quantity of water drawn from the soil below has increased manyfold. Consequently open wells and not - so - deep bore wells started drying up. The reason is that no sincere attmept is made to replenish the ground watertable with rainwater during the monsoon.…

    • 6379 Words
    • 26 Pages
    Powerful Essays
  • Good Essays

    British Raj

    • 649 Words
    • 3 Pages

    Work on the Karachi Municipal Drainage system was done in two phases. The project was inaugurated by Lord Harris, governor of Bombay, in December 1889, and it was arranged so that the required ejector pumps…

    • 649 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Rational Area Method

    • 1820 Words
    • 8 Pages

    4. The ARI of the computed peak flow is the same as that of the rainfall…

    • 1820 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    Two Rainfall-Runoff Models were earlier identified for application and for the generation of a more reliable discharge data. These are the Thornwaite Water Balance Model (WBM) and the IHACRES. The input requirement of both models differ. For the WBM, generation of runoff requires seven input parameters. These are the Runoff Factor (RF), Direct Runoff factor (DRF), Soil Moisture Storage Capacity (SMSC), Latitude of location, Rain Temperature Threshold, Snow Temperature Threshold and Maximum Snow Melt Rate of Snow. The IHACRES requires just the rainfall, temperature and runoff data. The models were first calibrated with known data and then more runoff data was generated using the calibrated parameters and measured values of rainfall and temperature.…

    • 1118 Words
    • 5 Pages
    Good Essays
  • Better Essays

    DrainFlow is a large residential and commercial plumbing maintenance firm that operates around the United States. It has been a major player in residential plumbing for decades, and its familiar rhyming motto, “When Your Drain Won’t Go, Call DrainFlow,” has been plastered on billboards since the 1960s.…

    • 1929 Words
    • 8 Pages
    Better Essays
  • Powerful Essays

    To address the problem of flooding in Mumbai, Brihan Mumbai Storm Water Drainage Project was initiated in 2007. The cost of the project is about Rs 1,200 crore. The project is being funded through Central assistance. Up until 2008-09, a sum of Rs 500 crore was released for this project. The provision for this project is being enhanced from Rs 200 crore in Interim BE to Rs 500 crore to expedite its completion.…

    • 2038 Words
    • 9 Pages
    Powerful Essays
  • Good Essays

    Peat Soil

    • 297 Words
    • 2 Pages

    Rate of subsidence 20 – 50 cm per year over a period of 5 years after drainage & thereafter 5 cm per year.…

    • 297 Words
    • 2 Pages
    Good Essays