Summit Mobile Garage Case Study
A. Summit Mobile Garage (SMG) –
1. Base – Awarded. Jeff has been coordinating with them on design efforts.
a. Jay is doing a site visit.
b. CPS received the initial shop drawings for review. They looked good and have been approved. Jeff will send Randy, Gary, Jason and Dick the shop drawings.
c. CPS is working with Enercept to ship the panels to NY on Feb 8th, because CPS doesn’t have anyone on site in NY till then to receive the shipment.
2. Structure – Awarded. Jeff has been coordinating with them on design efforts.
a. CPS met with vendor yesterday to talk about approach for assembly with current resources at Summit. In two weeks, meeting on assembly steps.
b. CPS discussed with them the possibility of having a factory rep come to Summit
…show more content…
Paint floor – NSF is wondering if the floor should be painted. CPS discussed this multiple times and decided to remove the requirement for painting the floor to make the schedule. CPS is talking to the vendor to verify schedule impacts of painting. CPS discussed bare steel that has been used in North Slope shops, which has performed well. Pat agreed with the approach and said rubber matting may be used, if required. If the vendor can make the schedule, Pat said to proceed with submitting an additional CR. If it is decided to paint the steel, send Pat an email with the cost, so he can discuss the approach with …show more content…
Discuss if CRREL heaters will be available.
1. Jason is trying to get into contact with the people at CRREL who have the heaters. He hasn’t had any luck yet. CPS is working on contingency options.
Alaska:
B. NEON –
1. Garage Updates –
a. A few punchlist items remaining – window repair, replace pressure gauge, and fine tuning of the vehicle exhaust system. JRE is planning on going up in late Jan or Feb. Jeff will coordinate this trip with JRE.
b. Drafting has been working on as-builts; they are almost complete.
c. CR for the transformer has been sent to NSF, so CPS will be able to make final payment to JRE.
d. De-obligation – Pat said that NEON is planning to take back any remaining funding. CPS will need to submit a CR for the de-obligation. Pat said that it sounds like Bio is interesting in using the funding to do additional work with CH. CPS is still finalizing costs, but will plan to have a final cost by the end of the Jan.
2. Estimate for APP5 Support – CPS is finalizing these costs. Jason has developed an initial estimate of around $7k for this work, but he is working on verifying the costs. CPS will send NSF a final cost estimate. Program:
C. Next Meeting – Next meeting is scheduled for Jan

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Est1 Task 3

    • 279 Words
    • 2 Pages

    All lines were determined to be scope increases (new requirements) to the currently approved APP5. Thus, all direct costs contained in this Change Request are fee…

    • 279 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Nt1330 Unit 6 Paper

    • 579 Words
    • 3 Pages

    The Custom woodworking Company has been in the custom furniture business since the early 1950’s. Since their inception they have grown their business and reputation steadily. This growth has demonstrated a need for the company to expand its existing factory floor space. Therefore, the companies stakeholders have agreed to expand the existing property by adding “additional production capacity equivalent to 25% of the existing floor space” (Wideman). Moreover, the floor space would contain “air-conditioning, a dust-free paint and finishing shop, an automatic wood working production train, as well renovated offices for the President and Executive Vice President” (Wideman). The total renovation costs have been outlined not to exceed…

    • 579 Words
    • 3 Pages
    Powerful Essays
  • Good Essays

    Long Island Garage Door Repair which are offered by companies send a technician who will insure that the door is secure to keep valuables located safely inside while the door is closed. Technicians will come to homes and check if the homeowners are having any problems with their remote controlled garage door. For example, if it isn't closing or if it has moved off its tracks, a technician will figure out what is wrong and make the appropriate changes. Repairs include fixing frames that are making it difficult to open or close.…

    • 482 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    Intro to Transportation

    • 374 Words
    • 2 Pages

    Responsibility: NB Power contracted services with Irving Equipment and BOL stated FOB Destination- damage or loss to the cargo up to the point of delivery to the buyer is responsibility of the shipper.…

    • 374 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Zipcar Case Study Essay

    • 470 Words
    • 2 Pages

    Zipcar, which was recently bought for $500 million by Avis car rentals, is a start up that is in the business of selling the urban lifestyle of renting cars for short periods of time instead of owning a vehicle. The case evaluates how Zipcar has been able to gain the trust of its customers by being a green minded company with a strong set of values and benefits that will keep a customer. Zipcar took advantage of the fact that they had a place in a niche market, which allowed them to create a positive image for their brand, all while creating a loyal following of urbanites that the company refers to as Zipsters.…

    • 470 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    The exercises contained in this activity require the creation of new CAD files in which you will reproduce sketches and forms represented in the displayed images. You have already created an Automoblox project folder and a Practice project folder (per Activity 5.2b).…

    • 2045 Words
    • 8 Pages
    Good Essays
  • Good Essays

    case study 2 tlmt 313

    • 951 Words
    • 3 Pages

    Mr. Murphy has ran into a road block, he is unable to retrieve the purchase request for the pipeline. Pat Wilson, the design engineer who is in charge of going through all the specifications has change the diameter of the pipe to 24 inches. Mr. Murphy asked why they change in the wall thickness and length. Wilson informed him that the operation of the line would be governed by less stringent specifications, making the wall thickness ¾ inches and the length would be 57 feet. Pat was considering cost as a role in the project based on her design and that lead to the change in the specifications.…

    • 951 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Hi my name is Mindy Rivera the new Office Manager for CertaPro Painters. My Sales Associate Dylan had submitted colors for approval for our customer Terry Kelly address 10561 Tracewood Cir. Highlands Ranch CO 80130. Unfortunately I am not sure when the request was submitted and was wondering if you had any information on if the colors have been approved.…

    • 60 Words
    • 1 Page
    Satisfactory Essays
  • Powerful Essays

    Janmar Coatings

    • 1380 Words
    • 5 Pages

    The architectural coating industry in divided into three major consumer segments 1) Do-It-Yourselfer 2) Professional painters and 3) Contractors/Other each making 50%, 25% and 25% respectively. This $16 Billion dollar industry is in the mature stage of the business cycle growing roughly at 1-2% annually. Within the Janmar Coatings service area there is $80 million worth of overall market sales. Janmar controls 15% of this market or $12M specifically. The Janmar service area is constructed of two distinct demographics, Dallas Fort Worth area (DFW) where they distribute to 80 retail stores and the Non Dallas Fort Worth area where they distribute to 120 retail stores. These current retail locations split sales dollar volumes 50/50 despite the 40/60 allocation of retail outlets.…

    • 1380 Words
    • 5 Pages
    Powerful Essays
  • Good Essays

    Value Garage Builders is a full-service garage builder that is located in Chicago, Illinois. Value Garage Builders carries more than 10 years of experience in the garage building industry. Their renovation services include reside garages, install new sheathing, install new windows, overhead doors, and install gutters. Their garage plans include hip style garage, 1 car gable garage, 2 car flat roof garage, 2 car gable garage, reverse gable garage, mansard style garage, and barn style garage. Their garage plan services include overhead door, 1/2 hp Liftmaster opener, and garage shelves. Value Garage Builders provides a special 28 point process that gives the customer a garage plan and garage with quality materials and excellent workmanship. This…

    • 131 Words
    • 1 Page
    Good Essays
  • Good Essays

    Commercial garage doors need to be able to take a lot more beating than residential doors. In many cases there will be high traffic moving through these doors, trucks and other sorts of equipment entering and leaving or a combination of both. These doors also need to comply with local codes and will require heavy-duty security locks.…

    • 448 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Genie garage door opener reviewsWhen the time comes to purchase a new garage door opener, you will have to consider several very important things before making a decision. There are many garage-door openers in the market, and they are all different. Prices will also vary. There is a huge number of manufacturers. Before the purchase, make sure you check the market, prices and all the available offers. There are some very important things such as size of the door, and type of the drive you will choose. Moreover, you need to pay attention to special safety features and the price of the product. Genie garage-door openers are considered as high-quality ones, which is why you should check the offer properly, and see if some of those openers are suitable…

    • 517 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Rondot Case Study

    • 738 Words
    • 3 Pages

    Glenn Northcott is a purchasing planner in Rondot Automotive. Their Jackson, Mississippi plant manufactures an average of 7million small motors which they distribute to their OEM customers. Their purchasing organization which has a hybrid structure is comprised of two groups—strategic purchasing (dotted-line reporting to purchasing manager) and plant purchasing department (straight-line reporting to purchasing manager). Currently, they are being pressured to cut down their plant costs and reduce their prices. Aside from these, they are also facing employment and global competition issues. Three months ago, an opportunity to outsource their painting operations to Greven was presented to Glenn. As part of the evaluation process, tests were administered and colleagues were consulted. The tests showed that 5 steel housings which undergo hot-bond process can be converted to e-coating and only one family cannot be converted due to the cold-bond adhesion it requires. John Underwood from manufacturing engineering encouraged the prospect, explaining that their wet-paint system has to be stopped or upgraded soon while Betty McKinley from production planning called out that 2 weeks’ worth of inventory has to be added and an additional $0.03 for transportation and packaging costs will be incurred. Now, Glenn has to discuss his suggestion to Terry Gibson (Purchasing Manager) and Dick Taylor (Plant Manager).…

    • 738 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Final Report Agile Electric

    • 6985 Words
    • 35 Pages

    order for the new product - the actuator assembly. In turn, Agile having no experience…

    • 6985 Words
    • 35 Pages
    Powerful Essays
  • Good Essays

    Doors Depot Case Study

    • 869 Words
    • 4 Pages

    The Doors Depot - Trustworthy Store That Works for Your Profit. 10 Tips for Choosing the Front Door.…

    • 869 Words
    • 4 Pages
    Good Essays

Related Topics