Preview

Space Age Furniture Company: A Case Study

Good Essays
Open Document
Open Document
490 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Space Age Furniture Company: A Case Study
“A material requirements planning (MRP) system is usually implemented with several constraints, such as replenishment of inventories on a period-by-period bases, which obstruct its dynamic performance” (Timon Chih-Ting & Wolfe, 2000). In developing a MRP system for Space Age Furniture Company three important data requirements needed are: the master schedule, bill of materials, and inventory records. Per Vonderembse and White (2013), the three major inputs of an MRP system are the master production schedule (MPS), bills of material (BOM) and inventory records. The master schedule determines the exact number of parts needed to be produce to complete production; the bill of material provides a list of component and quantities needed--without …show more content…
Right now, Ed works 8 hour shifts five days a week, and produces 1200 units (a unit every 2 minutes, 30 units every hour, and 240 per shift) of part no. 3079 produced weekly. However, received an order which requires 2000 units for part no. 3079 (1,000 sub-assemblies part no. 257 (Saturn) and 1,000 sub-assemblies is for part no. 435 (Gemini)) which means an additional 800 units more of what Ed produces during his regular shift, which means should Ed work in producing the additional units, he will work 26.6 hours in overtime to meet demand of the job. Unfortunately, due to the time restriction, the company not does have the time necessary to hire and train a new workman of Ed’s caliber to complete meet the order demand. Therefore, since Space Age has one week lead time in which to produce the ordered furniture, so Coral must convince Ed to produce the maximum number of part no. 3079 without incurring overtime. The completed parts would then be held stock until receives additional commissions. Space Age MRP process will go through the following steps in the Illustration

You May Also Find These Documents Helpful

  • Powerful Essays

    Materials Requirement Planning is an integral part of any manufacturing based business. According to The Free Dictionary’s definition of materials requirement planning is that this system “provides the user with information about timing (when to order) and quantity (how much to order), generates new orders, and reschedules existing orders as necessary to meet the changing requirements of customers and manufacturing” (2009). This definition of materials requirement planning illustrates the importance of having an excellent system in place to make certain that ordering needed materials is done in an orderly fashion that allows for the needed materials to be on hand, but will not result in an instance of having…

    • 1520 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    Space Age Furniture

    • 1300 Words
    • 6 Pages

    There have been special constrains in the case study placed on the operations manager which entail correcting the problem in the most cost effective manner possible for part 3079. The issue of overtime must be addressed in conjunction with operation of the lathe. There will have to be a analysis of the demand must be viewed thoroughly. The analysis will look at the total of two thousand units of part 3,079 that has to be created to meet the orders for Genesis and Saturn…

    • 1300 Words
    • 6 Pages
    Good Essays
  • Satisfactory Essays

    EDI Reference Guide

    • 298 Words
    • 1 Page

    Materials management manages its inventory with the data entered regarding supply usage. An integrated system forecasts needed supplies based on scheduled cases. This information minimizes the required inventory levels…

    • 298 Words
    • 1 Page
    Satisfactory Essays
  • Powerful Essays

    Thicket Wood Inc

    • 2852 Words
    • 12 Pages

    Thicket Wood Ltd. produces high-quality custom and handcrafted kitchen cabinets. They have a forecasted demand of two thousand kitchen cabinets this upcoming year. To meet this demand Mark Taylor operations manager must purchase a new or used CNC router machine and re-arrange his employees. Mark needs to re-arrange his employees to maximize the benefit of the CNC routing machine and meet the required demand of cabinets. There are six employees to re-arrange if he were to purchase the new CNC routing machine and seven employees to re-arrange if he choose to purchase the used CNC routing machine. To determine which machine he should invest in we have calculated the payback period for each option. It was determined that the new CNC routing machines payback period is three years, equivalent to the three years it is covered under warranty. The used CNC routing machine has a payback period of one year and eight months witch exceeds the warranty of one year. Mark decides to go with the new CNC routing machine form High Tech Inc. do to these calculations. We have also determined how many cabinets the production line can produce per year with the re-arranged line of six workers and the new CNC router machine. We know that working at maximum capacity is unrealistic therefore we have also determined how many cabinets we can produce at a lower production capacity. These calculations also help solve the second part of the main problem Thicket Wood is facing, meeting the demand of two thousand cabinets for the upcoming year. There are also sub problems which Thicket Wood will possibly face such as bottlenecks in the production line. As well as the implementation of the new CNC router machine which would then reclassify their product and require them to restructure their sales pitch.…

    • 2852 Words
    • 12 Pages
    Powerful Essays
  • Better Essays

    The master production schedule (MPS) at Riordan determines what parts will be needed on a weekly basis to meet the quarterly projected needs. Because Riordan uses a make-to-stock system, they are easily able to satisfy customer demand without production delays. A fixed-order quantity inventory method is used with an automated system to order parts when inventory levels drop to a determined level. A flexible time fence is utilized, as capacity remains unremarkable, and the majorities of Riordan’s suppliers are reliable and do not cause significant delivery…

    • 685 Words
    • 3 Pages
    Better Essays
  • Satisfactory Essays

    Material Requirements Planning (MRP) is a system that attempts to rein in materials needs. It is a technique that is based around the concept of dependent demand. MRP originated in the early 1960s in the USA as a computerized approach for the planning of materials acquisition and production (Aghazadeh, 2003). The three processes mentioned in the map of ERPsim processes are Procurement, Production and Sales. MRP is used in all these processes not only to integrate the processes but also to improve operation. The main objective of MRP is to balance the demand for materials with the supply of materials so that an appropriate quantity of materials is available when they are needed. The demand for materials is triggered by the fulfillment process and production process. If the materials are not available when they are needed, these processes will not function effectively. MRP makes sure the materials are available when you need them. So MRP ensures raw materials availability when they are needed to produce the finished goods for the client. The supply of material deals with procurement and production processes because materials are either bought or made. Purchasing or producing more than needed have negative consequences i.e. it can tie up cash, more spending on storage & insurance and the risk of obsolescence. Basically, the longer materials remain in storage, the more money the company loses. Material planning process optimizes the whole material acquiring and utilizing process to makes sure this does not happen. Not having enough, not having it in time, having too much etc. – all are problems that affects the business negatively and MRP is the perfect tool to avoid all these issues. MRP makes sure a raw material is acquired, processed & converted into finished goods to be shipped over to the client – all done with the optimum amount of money and time. MRP helps the management to…

    • 420 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    Edmonds, T. P., Edmonds, C. D., Olds, P. R., McNair, F.M., Tsay, B.-Y., Schneider, N. W., et al. (2007). Chapter 24: Planning for Capital Investment. In Fundamental Financial and Managerial Accounting Concepts (1st ed.). New York, NY: McGraw-Hill. Retrieved October 28, 2014 from The University of Phoenix eBook Collection database.…

    • 1054 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    The objective of this course is to familiarize students with the major tools used for manufacturing planning and control. To this end, we will perform an in-depth analysis of integrated operations management systems with emphasis on operations planning and control, material requirements planning, master scheduling, forecasting, capacity planning, just-in-time and related topics. These tools will be covered with more detail than previous SCM courses and we will examine how the various components fit together to form a complete system.…

    • 2563 Words
    • 12 Pages
    Powerful Essays
  • Good Essays

    Management

    • 1203 Words
    • 5 Pages

    6.Material requirements planning (MRP) is a computerized information system developed specifically to aid in managing dependent demand inventory and scheduling replenishment orders.(Points : 2)…

    • 1203 Words
    • 5 Pages
    Good Essays
  • Better Essays

    Realco Breadmaster Company

    • 1027 Words
    • 5 Pages

    Inventory is the stock of items used to support production, supporting activities and customer service. It is the “bread and butter” that keeps manufacturing firms in business, and is a critical resource in the supply chain. Inventory can be manually managed so that different business conditions can have less of a negative impact on the operations, and give support to the efficient running of supply chains. There are also many tools that companies use to manage production, such as the master scheduling, the material requirements planning (MRP), job sequencing, and distribution requirements planning (DRP). Now with all that said, let us now begin the review and analyze the first case study about the Realco Breadmaster Company.…

    • 1027 Words
    • 5 Pages
    Better Essays
  • Satisfactory Essays

    Henry Clements Car rental

    • 453 Words
    • 4 Pages

    From this data, as well as the data given on manufacturing methods and hours per method, a solution could be found utilizing the linear programming method of analysis. To analyze the data, the actual profit on each material was first calculated. This was done by taking the selling price and subtracting each cost associated with the given material. The results are $34.00 for the 75C, $30.00 for the 33C, $60.00 for the 5X, and $25.00 for the 7X. The next step was to determine how many constraints would be part of the analysis. There was determined to be 10 constraints in the analysis, 4 for the April orders, 4 for the manufacturing methods and 2 for the minimum orders promised by Vivian. With this data, the amount of each product to be produced to maximize profit for April could be determined. The results can be seen in Table 3.…

    • 453 Words
    • 4 Pages
    Satisfactory Essays
  • Powerful Essays

    BUS644 Week 6 Assignment

    • 3138 Words
    • 9 Pages

    Space Age Furniture manufactures tables and cabinets for microwave ovens and portable televisions. Both cabinetry styles comes in various sizes offering a number of features however; the basic construction follows the same production and assembly. The focus will be on two types of cabinets; the Saturn which is utilized to house microwaves and the Gemini television stand. Both of these cabinet types require a part which is referred to as part 3079. In order to produce part 3079, a skilled machinist is required to program and stand watch on a special lathe. The skilled machinist, Ed Szewczak, is unhappy because of the increase in overtime to produce part 3079 due to the implementation of material requirement planning (MRP) system. Space Age Furniture has adopted the MRP system in order to reduce storage cost. The estimated storage cost for specifically part 3079 is $1.50 per week for the Saturn microwave stand and $1.25 per week for the Gemini television stand therefore; the part is produced when needed and Space Age Furniture does not want to have an abundance of parts on hand. The master schedule for producing the Saturn and Gemini cabinets is illustrated in Table 1.…

    • 3138 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    Essay Scm, Crm and Srm

    • 731 Words
    • 3 Pages

    Enterprise Resource Planning is a software used in business to organize it, keep communication between departments involved in production such as the purchasing department, production department, sales department, marketing, finance, etc. This software helps on the production. Material Requirement planning (MRP) is an inventory system within the Enterprise Resource Planning (“Material Requirements Planning (MRP), para. 1). Material Requirement Planning supports on purchasing scheduling of raw materials and components needed for production or finished goods (“Material Requirements Planning (MRP) para, 1). For example, in the manufacturing of a vehicle the Material Requirement Planning system would help to purchase the all the components such as tires, seats, harnesses, etc. for its production. Material Requirement Planning begins its process in the plan of production (“Material Requirements Planning (MRP) para. 3). Once production is planned, this systems plans for the purchases of the components needed.…

    • 731 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Parleg

    • 7576 Words
    • 31 Pages

    Material Requirement Planning(MRP) MRP Procedure Issues with MRP Manufacturing Resource Planning MRP II Time driven Rough-Cut Capacity Planning…

    • 7576 Words
    • 31 Pages
    Satisfactory Essays
  • Better Essays

    Furniture Marketing

    • 1200 Words
    • 5 Pages

    Furniture marketing, by and large hasn’t really developed in any major way for as long as I can remember. However, there is one exception and that is Ikea.…

    • 1200 Words
    • 5 Pages
    Better Essays