Sop for Software Development
STANDARD OPERATING PROCEDURE DEPARTMENT : IT & MIS

SOP NO.: KPC-SW-10-01 PAGE NO.: 1 OF 8 EFF. DATE:

TITLE: SOP FOR SOFTWARE DEVELOPMENT 1.0 OBJECTIVE

REVIEW DATE:

To describe the procedure for delivering technical solution through development of new software. 2.0 SCOPE This procedure is applicable to development of all new software application in the IT and MIS department. 3.0 RESPONSIBILITY 3.1 3.2 3.3 Programmers to develop software applications as per laid down procedure. Team Leader shall be responsible to carry out the activity as per procedure. Software Manager shall be responsible to ensure the total development, implementation and training of the procedure.

4.0

ACCOUNTABILITY 4.1 Head of Management Information Systems

5.0 PRECAUTIONS 5.1 Measure the actual cost, effort, and schedule for deploying each process and technology improvement. Measure the value of each process and technology improvement. Measure the progress toward achieving the organization's quantitative objectives for process and technology improvement. Analyze the progress toward achieving the organization's quantitative objectives for process and technology improvement and take corrective action as needed. PREPARED BY NAME DESIGNATION SIGN & DATE
FRM No.: KPC/SW-10-01

5.2 5.3

5.4

CHECKED BY

AUTHORISED BY

STANDARD OPERATING PROCEDURE DEPARTMENT : IT & MIS

SOP NO.: KPC-SW-10-01 PAGE NO.: 2 OF 8 EFF. DATE:

TITLE: SOP FOR SOFTWARE DEVELOPMENT 5.5 5.6

REVIEW DATE:

Store the measures in the organizational measurement repository. Consider the following issues: 5.6.1 Planning, designing, and conducting pilots 5.6.2 Cost/benefit analysis 5.6.3 Technology transition 5.6.4 Change management

5.7 5.8 5.9 5.10 5.11 5.12

Manage Configurations Identify and Involve Relevant Stakeholders Monitor and Control the Process Collect Improvement Information Review Status with Higher-Level Management Determine Causes of Defects 5.12.1 Select Defect Data for Analysis 5.12.2 Analyze Causes

5.13



References: 7.1 7.2 CMMISM for Systems Engineering/Software Engineering, (CMMI-SE/SW, V1.02) IEEE standard for software project management plans (1058-1998) IEEE Standard for Software Verification and Validation (1012-2004) IEEE Standard for Developing a Software Project Life Cycle Process (1074-2006) IEEE recommended practice for software design descriptions (1016-1998) IEEE recommended practice for software requirements specifications (830-1998) “current Good Manufacturing Practices Guidelines” Simplicity Structured Maintainability 7.3 8.0 REVISION HISTORY Sr. No. 01 02 Revision Date Revision Status 00 Details of Revision Remarks First Issue 9.0 APPENDIX PREPARED BY NAME DESIGNATION SIGN & DATE FRM No.: KPC/SW-10-01 CHECKED BY AUTHORISED BY

You May Also Find These Documents Helpful

  • Satisfactory Essays

    6. Provide examples of the quality tools you plan to use for identifying and reducing process variability. In other words, how will you measure the process to know that your improvement is working.…

    • 508 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Cis 210 Research Paper

    • 1323 Words
    • 6 Pages

    As part of my job, I must complete a 10-to-15 page paper that follows this project through the system development life cycle (SDLC). This assignment will require I to do the following:…

    • 1323 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    The coding for the new software will largely depend on the difficulty of the software and the experience of the programmer. A suggested method for producing the code is the iterative method. Employees will be separated into specialized groups to handle individual sections of the software and each section will be handled one by one. The process can’t proceed on to the next section until the previous section has been completed, tested, and approved.…

    • 957 Words
    • 4 Pages
    Powerful Essays
  • Satisfactory Essays

    11. Ensure required downtime for improvement projects and planned maintenance work are inline with enterprise production plan.…

    • 295 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    ITMG624

    • 4112 Words
    • 21 Pages

    This course explores successful project management for information technology projects. The System Development Life Cycle (SDLC) models are defined including the waterfall, spiral, incremental release, and prototyping models. Students will differentiate between these models and apply corresponding project management methods to identify critical checkpoints and reviews. Risk management, as applied to technology projects, is examined. Key project indicators are discussed, and students will explore defining measurement criteria for determining critical success factors on a project. The course defines the application of knowledge, skills, tools, and techniques to project activities and includes a tutorial for Microsoft Project. Emphasis is placed on the three dimensions of the information technology project constraints: scope, time, and cost. Students are recommended to have access to Microsoft Project. Course software requirements with the appropriate versions are listed under the Resources.…

    • 4112 Words
    • 21 Pages
    Powerful Essays
  • Best Essays

    Meredith, J. R. & Shafer, M. S.. (2010) Operational Management for MBAs. John Wiley & Sons Inc. 4. 1-440.…

    • 1530 Words
    • 7 Pages
    Best Essays
  • Satisfactory Essays

    SOP example

    • 256 Words
    • 2 Pages

    1. PURPOSE: To define clearing, disassembling, cleaning, inspection, lubricating and reassembling procedures of the M4/M4A1 Carbine on a weekly basis…

    • 256 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Sop Example

    • 502 Words
    • 3 Pages

    Is a brief statement that outlines the purpose of the SOP, which describes its function, its applicability, and its objective.…

    • 502 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Project Plan Outline

    • 5445 Words
    • 22 Pages

    Note 1: The Project Management Plan guidelines were derived and developed from IEEE Standard 1058.1 Standard for Project Management Plans (ANSI) and the PMI Project Management Body of Knowledge (PMBOK).…

    • 5445 Words
    • 22 Pages
    Good Essays
  • Powerful Essays

    Riordan Mfg, operations - Production. (2008). Strategic Planning Scorecard PowerPoint. Retrieved March, 6 2010. MGT/449- Quality Management and Productivity https://ecampus.phoenix.edu/secure/aapd/CIST/VOP/Business/Riordan/Ops/RioOps007.htm…

    • 2187 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    4. Work with various IT development groups to ensure projects meet expectations of customers and the Product Manager. Ensure all required details and data are provided to Business Analysts and Project Managers for successful deliverables.…

    • 608 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    yfug

    • 282 Words
    • 2 Pages

    Put in place processes for rolling out the system throughout the organization. Develop scorecards that are "tweaked" to reflect the unique goals and performance measures in each department or functional group. Also, establish systems for collecting performance information in each of these groups.…

    • 282 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    lean system

    • 1249 Words
    • 5 Pages

    Sort – when in doubt, throw it out. Simplify– methods analysis tools. Shine/sweep – clean daily. Standardize – remove variations from processes. Sustain – review work and recognize progress. Safety – build in good practices. Support/maintenance – reduce variability and unplanned downtime.…

    • 1249 Words
    • 5 Pages
    Powerful Essays
  • Good Essays

    A&D High Tech (A)

    • 613 Words
    • 3 Pages

    The critical path is added to the appendix of this case report. As shown in Figure 1 and 2, many tasks are correlated so that one critical phase can affect the other. Here, we divided the entire process into three parts: namely by “Detailed Design” part (on the left hand of the network diagram), “Create Functional Requirements (upper side),” and “Development & Unit Test (bottom left side).” Even though, we leveled the resource referring on automated re-allocation methods, except for 7 phases in this project, most of the critical stages remained still critical. These seven stages are “Create data requirements,” “Gather testing requirements,” “Create System Test Plan & Test Cases,”“Write system test scripts,” and on the other part of the network diagram, “Updating and Calculating Shopping Cart,” Submit Order,” “Check Order History & Order Status,” and “Create ERP Interface Requirements.” Considering that most of the leveled tasks are components of “Detailed Design” and “Development & Unit Test,” (tasked that still remained critical, even...…

    • 613 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Because errors are caused by system or process failures it is important to adopt various process-improvement techniques to identify inefficiencies, ineffective care, and preventable errors to then influence changes associated with systems. Each of these techniques involves assessing performance and using findings to inform change (McNally, Page, and Sunderland, 1997).…

    • 389 Words
    • 2 Pages
    Satisfactory Essays