Preview

Sedimentation

Powerful Essays
Open Document
Open Document
4747 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Sedimentation
Int. Journal of Applied Sciences and Engineering Research, Vol. 3, Issue 3, 2014
© 2014 by the authors – Licensee IJASER- Under Creative Commons License 3.0
Research article

www.ijaser.com editorial@ijaser.com ISSN 2277 – 9442

Investigating the sedimentation pattern at Ghazi barrage reservoir and impact of 2010 flood upon it
Ishtiaq Hussain1, Abdul Razzaq Ghumman2, Hashim Nisar3
1
A student of PhD in Civil Engineering at University of Engineering and Technology Taxila Pakistan and working in Water Sector of Water and Power Development Authority Pakistan as Additional Director
(Geotech) in the office of General Manger & Project Director Tarbela Dam Project-Tarbela Pakistan
2
Professor, Department of Civil Engineering, University of Engineering and Technology, Taxila, Pakistan
3
Professor, Department of Civil Engineering, University of Engineering and Technology, Taxila, Pakistan
DOI: 10.6088/ijaser.030300014
Abstract: Ghazi Barotha Hydro Power Project is a run of river project meant for generation of 1450 MW electricity. It is Pakistan’s second biggest power generating project of vital importance. Ghazi Barrage, one of the key components of the project and situated just downstream of Tarbela Dam project, diverts the
Tarbela releases towards 52 KM long Power Channel, another key component, which in turn conveys it to village Barotha for power generation through Power House, the final key component of the project. Two factors which necessitated this study were heavy sediment accumulation in Tarbela dam thereby increasing the sediment inflow into the Ghazi Pond and the devastating flood of 2010 which brought huge sediments from the area upstream of Tarbela. It was important to find out what was happening to the Ghazi pond and changes it had undergone since its operation in 2005. The strategy of this study was to find out incoming and outgoing sediment load from the available data thereby evaluating load retained in the pond along-with



References: 1. Benjamin, Sebastien Erpicum, Pierre Archambeau & Michel Pirotton, 2012. Experimental study of velocity fields in rectangular shallow reservoirs, Journal of Hydraulic Research, Vol 2. Chanson H. and James D.P. 2008.. Extreme Reservoir Siltation : A Case study Rapid reservoir sedimentation in Australia, Study report 3. Chaudhuri D. 2006. Life of Maithon Reservoir on Ground of Sedimentation a case study. Journal of Hydraulic Division 4. Einstein, H.A., 1950, The bedload function for sediment transportation in open channels, Technical Bulletin 1026, U.S 5. Emmett, W.W., 1980. A field calibration of the sediment-trapping characteristics of the Helley-Smith bed-load sampler, U.S 6. Fan, J., and Morris, G. L. 1992a. Reservoir sedimentation I: Delta and density current deposits. Journal of Hydraulic Division, ASCE, 1183, 354-369. 7. Fan, J., and Morris, G. L. 1992b. Reservoir sedimentation II: Reservoir desiltation and long-term storage capacity 8. Garcia, M.H., 1999, Sedimentation and erosion hydraulics, in Hydraulic Design Handbook, L.W. 9. Goel M. K., Sharad K. J and Agarwal. K. 2002. Assessment of sediment deposition rate in Bargi Reservoir using digital image processing 11. Juracek, K.E. 2011. Suspended-sediment loads, reservoir sediment trap efficiency, and upstream and downstream channel stability for Kanopolis and Tuttle Creek Lakes, Kansas, 2008–10: U.S. 12. Juracek, K.E. 2012. An Investigation of Element Ratios for Assessing Suspended-Sediment Sources in Small Agricultural Basins: Physical Geography, Volume 33, Number 1/January-February, 2012, 50-67. 13. Juracek, K.E., 2010. Sedimentation, sediment quality, and upstream channel stability, John Redmond Reservoir, east-central Kansas,1964–2009 , U.S 15. Kube M., Bronstert A., Wildi W. 2006. Impact of floods on reservoir sedimentation on the example of Lake Gruyere, Switzerland 16. Kyle E. Juracek, 2008, Sediment storage and severity of contamination in a shallow reservoir affected by historical lead and zinc mining, Environmental Geology, 54, 1447-1463. 17. Morris, G.L and Fan, J. 1998. Reservoir sedimentation handbook:-Design and management of dams, reservoirs, and watersheds for sustainable use, McGraw Hill, New York. 20. Pakistan Hydro Consultants; Ghazi Barotha Hydro Power Project 1991. Feasibility Report; Volume-2, Hydrology, Geology & Geotechnical Aspects, 1991. 21. Robert R. Holmes, Jr. 2010, Measurement of Bedload Transport in Sand-Bed Rivers: A Look at Two Indirect Sampling Methods Published online in 2010 as part of U.S 22. Survey & Hydrology Department Tarbela Dam Project TDP, 2002. Annual Report of Tarbela Reservoir Sedimentation-2002.

You May Also Find These Documents Helpful

  • Good Essays

    Montara Beach Lab Report

    • 636 Words
    • 3 Pages

    This lab report is on the trip to Montara beach were we studied sediments on the coast line. In figure 1 it shows the location of Montara beach, which is located south of San Francisco near Pacifica. The purpose of the trip was to discover layers of sediment and understand the properties of them, like grain size, composite, organization and so forth. As shown in figure 2 you can see that Montara beach has quaternary sediment, meaning its sediment is younger than what its surround by. This data helps geologist determine how old the rock is and what kind of geological events have occurred to it and near it. The observations of modern processes helps to interrupt ancient events by examining the sediment and looking at the way it was deposited to show where the sediment was once from and what it will from to later on. (Figure1 & 2)…

    • 636 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Unit 5 Assignment 1

    • 297 Words
    • 2 Pages

    The main problem in the construction of the Dulhasti Power Plant Project is the project cost estimation and delivery. The project was based on a straight concept: Dilhasti was designed as a 390MW hydroelectric power plant to be built on Chenab River in the Doda region, The project was supposed to build a hydroelectric generating station, and string hundreds of miles of transmission lines starting near the headwaters of a system of rivers flowing onto the plain south of the mountain region.…

    • 297 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Bear Creek Lab Report

    • 711 Words
    • 3 Pages

    Tables 1 and 3 shows the measurements of the 10-meter stretch of Bear Creek that includes a pool and a riffle. The first table also shows the recorded time and weather in which our class collected the data during that particular day. The upper, middle, and lower transects are measured using meters. Each of the transects are first measured by width and then by depth on the: Left edge, mid-stream, and right edge. Then there is description on the substate and the site on both the upper and middle transect.…

    • 711 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Sedimentator Lab Report

    • 1082 Words
    • 5 Pages

    The bigger sediments fall to the bottom while the smaller ones go one top of them and form another…

    • 1082 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Snowy Research Paper

    • 317 Words
    • 2 Pages

    It is one of the most largest and complex hydro-electric schemes in the world it contains; 80 kilometres of aqueducts, 140 kilometres of tunnels, 16 large dams and seven power stations, two of which are underground. The project commenced under an Act of Federal Parliament in October 1949 with the goal of diverting the Murrumbidgee, Snowy and Tumut Rivers in south western NSW to provide irrigation water for the western side of the Great Dividing Range, and in the process generate hydro-electric power.…

    • 317 Words
    • 2 Pages
    Good Essays
  • Good Essays

    A river changes as you move from the source to the mouth (downstream), but also from bank to bank (across stream). In this essay I will be discussing how depth velocity and bedload size change downstream and across stream linking to past river theory (the Bradshaw method).…

    • 428 Words
    • 2 Pages
    Good Essays
  • Powerful Essays

    Study Guide

    • 785 Words
    • 4 Pages

    Use the websites and your book to help you answer the following questions about river erosion and deposition…

    • 785 Words
    • 4 Pages
    Powerful Essays
  • Powerful Essays

    Letchworth State Park

    • 1334 Words
    • 6 Pages

    Hennigan, Robert D. "The Genesee River Drainage Basin, Gorge and Mount Morris Dam." Editorial. Clearwaters Summer 2007: 26-27. Nywea.org. New York Water Environment Association, Inc. Web. 24 Mar. 2013. .…

    • 1334 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    Power, something everyone wants in one form or another. It is known that electricity is crucial for the current way of life to progress and move forward on the path that is currently laid out. One of these means to producing power for society is hydroelectric dams. However, while many individuals can say it is clean power, the real question is it the right power? Not to just think about the cost, resources, land change, population followings the question should follow more to the actual impact to benefits. Most businesses require electricity to turn on the lights and billboard signs to draw in customers for their personal capitol power, cash. Yet, businesses require resources that many rivers bring to any given area. The Amazon is a river that brings much resources to an entire country that supplies the world. China has the Three Georges Dam on their major river. The third major dam is of the DR Congo with easily estimated cost $80 billion.…

    • 1694 Words
    • 7 Pages
    Good Essays
  • Satisfactory Essays

    The river is drying up and now they want to reroute it to produce electricity,…

    • 419 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    The littoral zone, commonly referred to as the intertidal area, is where the land and water meet. It is rich in nutrients and oxygen and is home to a variety of organisms. The littoral zone provides some plants with the opportunity to complete their growth cycle, but the changing water level also brings about some environmental problems, such as soil erosion and biodiversity reduction (Chen).…

    • 788 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Appendix B Bus/210

    • 260 Words
    • 2 Pages

    | |hydroelectric concepts of large power plants and bringing them into the home and |…

    • 260 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    With the cross-sectional area on the whole it seems to increase as the river progresses, with Site 1 being 9.23 and Site 5 being 18.13. However Site 4 has a higher figure than Site 5, yet this was due to the fact that we could only use part of Site 4, as one half of the river was completely dry, so the results from that site are likely to be an anomaly.…

    • 1311 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Power Resources

    • 334 Words
    • 2 Pages

    Power resources are use to rum communication machines which makes communication faster, easier and cheaper.’…

    • 334 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Bhavnath Temple

    • 1085 Words
    • 5 Pages

    The case deals with the problems faced while building a dam across the rivers Lokmata and Sadmata in northern Gujarat and further issues encountered while a proposal is made to raise the control levels of it. The objective of the case is to maximize the irrigation potential of the dam while respecting the religious sentiments of the people. The options are either to implement the former plan in its present form or the latter by convincing the people of its benefits and deal with the issues faced. The conclusion is to try and implement the new plan resulting in maximization of irrigation and revenues.…

    • 1085 Words
    • 5 Pages
    Good Essays

Related Topics