Preview

Rpps in Pakistan

Powerful Essays
Open Document
Open Document
10126 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Rpps in Pakistan
RENTAL POWER PLANTS: PANACEA FOR ENERGY NEEDS OR LIABILITY FOR PAKISTAN

(K Raza Gardezi)
30 December 2010

EXECUTIVE SUMMARY
Pakistan is currently facing a power deficit estimated at 4000 MW - 5000 MW. To tide over the significant electricity shortages in the country, the Government of Pakistan planned to add 4,225 MW of generating capacity in 2009 against which the achievement was a meager 151 MW. There were many reasons for the failure of the 2009 capacity addition plan e.g. delays in Independent Power Projects (IPPs) due to a local and global financial crisis, security and terrorism related issues etc. Competitive bidding by 9 companies for new IPP projects under Private Power and Infrastructure Board's (PPIB) Fast Track process (Package A) was 'agreed in principle' by the Bid Evaluation Committee of PPIB in August 2008. Tariff was approved by NEPRA on 9th October 2008 and as of 6th December 2008 and the Cavalier IPP project was at stage 16 (notice for submission of Performance Guarantee and processing fee) out of 21 stages in PPIB’s Fast Track process. It was however reported in January 2009 that the project would not materialize because foreign investors were unwilling to provide financing due to recent increases in Pakistan's country risk premium.

This paper therefore intends to explore reasons for Pakistan to increase its power generation capacity through various new measures and incentives to private and foreign investors. The negative fallout of power shortages resulted in closure of industries, low production capabilities leading to unemployment and price escalation. This put a lot of pressure on the new government which was forced to take short term measures for filling in the power gap till its mid-term and long term power generation plans came on ground. The “Vision 2020 Program” of the government was initiated to address the power shortfall over the medium and long term with a view to add around 20,000 MW into

You May Also Find These Documents Helpful

  • Better Essays

    Pakistan’s economy continues to face numerous domestic and external shocks from 2007 onwards. Economic performance was affected from the devastating floods and rains, the internal security hazards, and the energy crisis. The economy of Pakistan during the last five years grew on average at the rate of 2.9 percent per annum. Deterioration in the power sector is the main constraint on growth. It is true that the energy crisis is frustrating the…

    • 1511 Words
    • 7 Pages
    Better Essays
  • Powerful Essays

    The concept was merchant power plant was introduced in India in 2003. With an existing huge demand supply gap of electricity in India, MPPs are considered to be panacea in the long run. Though the government has targeted capacity addition of 88,000 MW in the 12th FYP it seems faltering purely basis the trend of delays observed in project commissioning and the after effects of economic slowdown hitting the power generation sector in India. Can MPPs provide a sustainable solution to the energy needs of India? The paper attempts to find out challenges being faced by IPPs, various risks and return related to MPPs and what strategies can be adopted to promote merchant power plants and increase their market opportunities.…

    • 2288 Words
    • 10 Pages
    Powerful Essays
  • Satisfactory Essays

    Power and Energy Sector Development Roadmap (June 2010), Ministry of Finance Bangladesh Economic Review 2011(Bangla version) Private Sector Power generation Policy of Bangladesh, Ministry of Power, Energy and Mineral Resources…

    • 11125 Words
    • 45 Pages
    Satisfactory Essays
  • Good Essays

    Load Shedding in Pakistan

    • 1100 Words
    • 5 Pages

    Pakistan had a total installed power generation capacity of 21,000 MW in 2011. However, dependable or de-rated capacity is in the range of 14,000 to 16,000 MW during the year, due to variety of factors, whereas demand for electricity is increasing at an average annual rate of eight per cent.…

    • 1100 Words
    • 5 Pages
    Good Essays
  • Good Essays

    That’s such a shameful reality of our present power generation scenario, false promises are made in every session for no use and its now obvious to everyone that energy will never be available with such absurd advertisements about electricity trafficking and operating air conditioner at 26 degrees what an excuse they have put forward..Although they have got loads of water reservoirs which can serve as huge hydro power generating plants in the north of the country, but again it’s a sorry condition of not utilizing the nature’s reservoirs. I remember the last year’s experience of 17 hours straight breakdown of electric power in the whole Karachi vicinity. That was such an impudent condition of our recent government that shows off the 21st century Pakistan. News are full of scandalous predictions as well as real facts but with a tag of complaint only and not for its solution. New graduates in the technology whenever tries to work on it, are highly condemned by the excuse of limited resources that shows the lack of interest in Pakistan’s prosperity.…

    • 572 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Rpp Rental Power Plants

    • 2043 Words
    • 6 Pages

    Pakistan has around 20,000 MW of electricity production, but it falls short, it falls short of nearly 4,000 MWs which results in a lot of ways i.e. Load shedding (scheduled and unscheduled), low voltage, missing phases and massive breakdowns. The government has been watched taking actions for this problem, but there has not been any real solution that came across the vision of public. Present government has failed to anticipate and expand the growth and the supply-demand gap is increasing day by day. Many proposals have been delayed and/or cancelled, some were neglected intentionally. The constructions of dams have also been postponed due to political matters so we have also failed to produce hydro power. And due to lack of investment and failing in maintenance in the existing independent power plants (IPP) is now resulting in outdated power plants and they are producing lesser MWs as days go by. All this maybe because of we are facing losses due to rampant electricity theft and its not being controlled. Analysts say that line losses have gone upto 30-40 percent. According to another analyst there is a myth that many IPPs operate lower than their capacity because they are not able to pay for furnace oil since PEPCO is already in huge debts. This crisis has been around for ages and there has not been any wise decision taken over it by the government of Pakistan. So, still, the big news is that we are short of electricity.…

    • 2043 Words
    • 6 Pages
    Good Essays
  • Satisfactory Essays

    Energy Crisis of Pakistan

    • 632 Words
    • 3 Pages

    SOLUTIONS To overcome the current energy crisis Pakistan needs to take the following steps:•Short term plans•Medium term plans•Long term plans…

    • 632 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Sedimentation

    • 4747 Words
    • 66 Pages

    electricity. It is Pakistan’s second biggest power generating project of vital importance. Ghazi Barrage, one…

    • 4747 Words
    • 66 Pages
    Powerful Essays
  • Good Essays

    Energy crises are a big problem in Pakistan. The reason behind this is the lack of good leadership, illiteracy, excessive use of fossil fuels and other political issues. Now, in these conditions the only way of survival and to overcome this problem is that we stop blaming and relying on the government or other private energy sector’s policies and start thinking to solve it by alternative methods.…

    • 550 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Ppp Bangladesh

    • 832 Words
    • 4 Pages

    A Public Private Partnership (PPP) is a partnership between the public and private sector for the purpose of delivering a project or service traditionally provided by the public sector. Public Private Partnership recognizes that both the public sector and the private sector have certain advantages relative to the other in the performance of specific tasks. By allowing each sector to do what it does best, public services and infrastructure can be provided in the most economically efficient manner.…

    • 832 Words
    • 4 Pages
    Good Essays
  • Good Essays

    effects of load shedding

    • 511 Words
    • 2 Pages

    While countries in the west move towards enlightenment, Pakistan is moving towards darkness. The country suffering at the hands of corrupt politicians and terrorism has much graver problems and one of them is load shedding. It is the 21st century and there is no electricity in Pakistan! People are crying their hearts out in front of the government to provide them with the basic necessity of electricity but the government seems to have no clue about how to solve this problem.…

    • 511 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Load Shedding in Pakistan

    • 515 Words
    • 3 Pages

    Protests are taking place around the country. People of advanced countries cannot imagine to live in such circumstances for a single day. I have never seen such a intense electricity load-shedding during my whole life. Minister of water and power Raja Pervaiz Ashraf failed to fulfill his promises. Electricity load-shedding is one of the biggest issue in Pakistan including poverty and unemployment. Government should take drastic measure to finish this electricity load-shedding. Pakistani nation is unhappy that government and opposition is busy in other legislative issues instead of resolving these primary issues. I challenge that I can resolve electricity load-shedding issue in one year if I become minister or high official of ministry of power.…

    • 515 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Pakistan Revolutiom

    • 320 Words
    • 2 Pages

    The 23rd of March is a day when the Muslims of the sub-continent decided to launch a peaceful democratic struggle to achieve a separate homeland where they could live as free and equal citizens in accordance with the principles of social justice propounded by Islam. The Resolution adopted on this day seventy one years ago was based on the Muslims' right to self-determination, their unique culture and civilization. It marked the dawn of final phase of their struggle to get rid of political bondage and a determination to chart a new course of action. Our founding fathers wanted Pakistan to be a democratic, welfare and moderate Islamic state that could not only ensure the wellbeing of its own people without any discrimination of caste, creed, race and colour but also contribute to the peace and development of the world. The present democratic government is trying its best to make Pakistan a truly democratic, moderate, and welfare Islamic state in according with the vision of the founding fathers. Since taking over, the government has taken a number of key steps such as the restoration of original character of constitution through the 18th and 19th Amendments, 7th National Finance Commission Award, political ownership to war on terror, Aagaz-e-Haqooq-e-Balochistan Initiative, the strengthening of Parliament and other state institutions, pro-women and prominorities' reforms and Gilgit-Baltistan Empowerment & Self-Governance Order 2009. These initiatives of democratic Pakistan have made our federation strong. I assure the international community that Pakistan would eliminate terrorism and extremism from its midst as these notions are contrary to our collective ethos, identity and religious teachings. The idea of Pakistan is too vibrant and dynamic to bow before the forces of terrorism and extremism. It is democracy which achieved Pakistan and it is democracy which would make Pakistan achieve our founding fathers' dream.…

    • 320 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Energy Crises in Pakistan

    • 3132 Words
    • 13 Pages

    Energy is assuming central stage due to the rapid economic growth in different parts of the world, pushing energy demand higher. Unfortunately Pakistan is facing major energy crisis nowadays. The energy crisis is affecting all walks of life in the country. The situation further deteriorated because of the stoppage of the supply to industrial units by Sui Gas Company. The Company was already going through a system of load-shedding itself due to excessive use of gas by CNG users. Many electricity generation units were shut off due to non-availability of the gas. The IPPs who were operating on furnace oil could not get the regular supply of the furnace oil due to the circular debt issue. And then naturally the blame game started, starting from the water shortage in Dams to furnace oil transportation problem, violence in Sind and maintenance activity in some independent power producers. The government admitted that in last 10 years not a single MW was added. The fact is that Pakistan is sustaining an acute shortage of Power. Its demand is increasing and production is declining due to aging of the plants. And no solution is in sight. The projects which are in pipeline will not come in line before 2013. And even the magnitude is such that it will not be able to fulfill the demand of today.…

    • 3132 Words
    • 13 Pages
    Good Essays
  • Good Essays

    My Computer

    • 443 Words
    • 2 Pages

    One of key difference between a developing country and a developed (a.k.a civilized) country is the power management. Electricity has become a basic need, and its unhindered, continuous and smooth supply is the necessity, but in countries like Pakistan, its still a luxury and more or less an elusive dream.…

    • 443 Words
    • 2 Pages
    Good Essays