Reliability Centered Maintenance Plan for the Utility Section of a Fertilizer
International Journal of Science and Advanced Technology (ISSN 2221-8386)

Volume 4 No 3 March 2014

http://www.ijsat.com

Reliability Centered Maintenance Plan for the Utility Section of a Fertilizer Industry: A Case Study
Muhammad Abid*, Suleman Ayub, Humza Wali, Muhammad Najam Tariq Faculty of Mechanical Engineering, Ghulam Ishaq Khan Institute of Engineering Sciences & Technology, Topi, 23640, Swabi, KPK, Pakistan *abid@giki.edu.pk

Abstract—This paper provides an insight to the application of Reliability Centered Maintenance (RCM) and life data analysis. The objective is to formulate a Failure Management Policy for the utility section of a fertilizer industry. It focuses on how key elements of the RCM process can be combined to select appropriate policies for managing a system’s failure modes and their consequences, using an RCM decision algorithm. The foremost objective of Reliability Centered Maintenance plan is to optimize reliability of physical assets while being cost effective. Furthermore in addition to traditional RCM, life data of the machinery is analyzed using empirical analysis of Weibull distribution. The estimates of the parameters of Weibull distribution are found using Median Rank Regression (MRR) method. Each machine is then matched with one of the six most widely accepted patterns of failure. In the end these two techniques i.e. RCM and Weibull Analysis are integrated in a manner to formulate an optimized Failure Management Policy. The plan is in compliance with RCM SAE JA1011 standard. Keywords: RCM, Reliability Engineering, Management Policy, Life data analysis. Failure

example, deductions and results obtained can be applied to the all the systems of ammonia/urea complex plant. II. THEORETICAL BACKGROUND

A. Failure Curves Failure rate or hazard rate is defined as probability density function divided by reliability [2]. There are a total of six failure curves associated with most of the equipment installed in an Industry which



References: J. Moubray, Reliability-centered maintenance., Vols. ISBN 9780831131463., New York: Industrial Press, 1997. [2] P. MacDiarmid and S. Morris, Reliability Toolkit (Commercial Practices ed.), Rome; New York: Reliability Analysis Center and Rome Laboratory.. [3] F. S. Nowlan and H. F. Heap, Reliability-Centered Maintenance, San Francisco: Dolby Access Press, 1978. [4] R. B. Abernathy, The New Weibull Handbook, Houston: Dr. Robert B. Abernethy, 2004. [5] C.-c. Liu, "A Comparison between the Weibull and Lognormal Models used to Analyze Reliability Data. P.hd thesis," University of Nottingham, UK, Nottingham, 1997. [6] J. F. Lawless, Statistical Models and Methods of life, New York: J WILEY & SONS, 1982. [7] Dawood Hercules Fertilizers Ltd., Utility Plant Training Manual, Lahore: Technical Training Department, 2009. [8] M. S. K. A. H. P. G.R Pasha, "Empirical Analysis of The Weibull Distribution," Journal of Statistics, vol. 13, no. 1, pp. 33-45, 2006. [9] NIST/SEMATECH, e-Handbook of Statistical Methods, 2005. [10] S. International, Evaluation Criteria for Reliability-Centered Maintenance (Rcm) Processes- General requirements. SAEJA1012, 2002. 16

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Mat 540 Week 1 Assignment

    • 405 Words
    • 2 Pages

    Step 2 I generated another column of random numbers, again using in excel =Rand( ). This random variable is used to generate days for repair. Using these generated numbers, I calculated the number of days the machine will be down for repair. In excel I used the equation =IF(F20.85,3,2)). This allows me to use the random numbers generated…

    • 405 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Math Midterm

    • 1005 Words
    • 5 Pages

    200 imulations runs were completed using the probability of a machine breakdown from the table below . the average number of breakdowns from the simulation trials was 1.93 with a standard deviation of .20.…

    • 1005 Words
    • 5 Pages
    Good Essays
  • Good Essays

    BSA 375 Final Assignment KFF

    • 5768 Words
    • 24 Pages

    Price, L., & Tam, A. (2008). Journal of Quality in Maintenance Engineering. USA: Emerald Group Publishing Limited…

    • 5768 Words
    • 24 Pages
    Good Essays
  • Better Essays

    Nicholls, D. (2005). System Reliability Toolkit: A Practical Guide for Understanding and Implementing a Reliability Program. RIAC.…

    • 1550 Words
    • 7 Pages
    Better Essays
  • Better Essays

    This paper is a review the case study “The Toro Company S’No Risk Program” by David E. Bell (1994). The company had specialized in outdoor machines since 1914, starting with tractor engines then later adding lawn mowers and eventually snowthrowers, of which accounted for 10-15% of sales. Toro sold product to many dealers such as hardware stores and Marshall Field, typically selling about two-thirds of yearly snowthrower sales during November, December, and January. After years of exceptionally high sales, winters became milder and sales plummeted and Toro needed to rethink their sales approach. After consideration, Toro made the decision to work with an insurance company,…

    • 1152 Words
    • 5 Pages
    Better Essays
  • Good Essays

    Jet Copier

    • 416 Words
    • 2 Pages

    The first step in creating the simulation was to determine the time between repairs. The probability function for time between repairs is x = 6*square root (sqrt) of r, where r is the generated random number. First, a random number was generated. The next step to determine the time between repairs was to use the probability function of x=6*sqrt of r. The results of this calculation were placed in the second column of the excel worksheet. A third column was created to determine the cumulative time between the breakdowns. The same process continued: finding a random number, using excel function RAND(), using the formula, x=6*sqrt of r to find the time between repairs, and then calculating the cumulative time between breakdowns until the cumulative time reached the 52 week mark.…

    • 416 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    Seamgas Inc Case Study

    • 355 Words
    • 2 Pages

    Due to inadequate asset information assets are assumed to have been installed in groups of equipment called bays, hence the assumed age of assets per bay is the same. Asset condition is determined based on an Asset Health Index derived from condition assessments and reliability data (MTBF, MTTF, MTTR) which is missing in this case. Typically a Health Index Score between 50% and 60% means an asset needs to be monitored more closely with a potential change in proactive maintenance approach. For 50% lower a risk assessment is required and if it is a high risk assets, it be put on a risk register and managed with additional measures to ensure its integrity. Age profiles for 66kV and 11kV substations are given Table…

    • 355 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Jet Copies Essay

    • 556 Words
    • 3 Pages

    According to the continuous distribution information provided, interval between successive breakdowns is 0-6 weeks. Based on the Bigelow Manufacturing example, the formula for continuous probability function for the time between breakdowns is f(x) =x/18, 0 < x < 6 weeks. To simulate the interval successive breakdowns, random numbers were generated and the result multiplied by 6 and Square root. This gives the number of weeks between machine breakdowns. Cumulative Time was also generated adding the result of the generated square root and stopping just a bit above 52 weeks for the one year simulation requirement.…

    • 556 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    In this paper the impact of the idle times is analyzed due to failures in a bottling process line by using simulation techniques. In the case study of this paper, all the failures are produced by fallen bottle in several points throughout the conveyor line. One way to overcome this problem is allocating a worker to each point where the falling of bottles is produced. The simulation was used to evaluate different scenarios where the worker allocation gets the best impact in terms of reduction of failures, which results in a higher rate of production. The paper presents a statistical analysis to validate the simulation model as well as the use of Bonferroni’s [1] approach to compare several scenarios. The main conclusion is that by reducing the failures in the washing process area significant increase of the production is obtained. Results and analysis of this case study are presented in detail.…

    • 2513 Words
    • 27 Pages
    Powerful Essays
  • Powerful Essays

    Another kind of plotting, called Cum Hazard Plotting, has the same purpose as probability plotting Just commercial probability paper is available for most life distribution models for probability plotting of reliability data, there are also special Cum Hazard Plotting papers available for many life distribution models. These papers plot estimates for the Cum Hazard H(ti)vs the time ti of the i-th failure. As with probability plots, the plotting positions are calculated independently of the model or paper used and a reasonable straight-line fit to the points confirms that the chosen model and the data are consistent. Advantages of Cum Hazard Plotting 1. It is much easier to calculate plotting positions for multicensored data using cum hazard plotting techniques. 2. Linear graph paper can be used for exponential data and log-log paper can be used for Weibull data. Disadvantages of Cum Hazard Plotting 1. Commercial Cum Hazard paper may be difficult to find. 2. It is less intuitively clear just what is being plotted. Cum percent failed (i.e., probability plots) is meaningful and the resulting straight-line fit can be used to read off times when desired percents of the population will have failed. Percent cumulative hazard increases beyond 100% and is harder to interpret. 3. Normal cum hazard plotting techniques require exact times of failure and running times. 4. With computers to calculate the K-M estimates for probability plotting, the main advantage of cum hazard plotting goes away. Since probability plots are generally more useful, we will only give a brief description of hazard plotting. How to Make Cum Hazard Plots 1. Order the failure times and running times for each of the n units on test in ascending order…

    • 939 Words
    • 4 Pages
    Powerful Essays
  • Good Essays

    This approach could take care of issues successfully and distinguish the potential failure modes and impacts expressly. Moreover, it could likewise create trust simultaneously. It permits the examiner to utilize linguistic terms in criticality evaluation for surveying the dangers connected with failure straightforwardly. Ambiguity, subjective information, or data including quantitative information, could be utilized as a part of the appraisal and organization reliably, yet not unequivocally. The structure of the blend of parameters, severity (S), occurrence (O), and detection (D), was more adaptable. This study focuses on the use of fuzzy in FMEA to analyse whether the results show a more accurate, reasonable ranking than the traditional method and thereby overcoming the shortcomings of traditional…

    • 731 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    The score for each individual failure mode for every process input of critical components are decided on; (i) historical failure data; which gives comprehensive behavioral study of failure pattern of critical components and (ii) questionnaires; to floor operators, managers, maintenance personnel. The scores for detectability (D), probability of occurrence (P) and severity of effect (S) is ranked as per Table 1, Table 2 and Table 3 respectively.…

    • 999 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    and as “k” increase the gamma does not have limits, so the cases k=1 and k = ∞…

    • 365 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Rbi Guidelines

    • 3331 Words
    • 14 Pages

    This Gide Line is prepared to document the methodology used to PERFORM RISK BASED Inspection Analysis of B1 and B2 equipments and piping. This will guide the further RBI work on B3 equipment and piping.…

    • 3331 Words
    • 14 Pages
    Powerful Essays
  • Satisfactory Essays

    Maintenance Management

    • 355 Words
    • 2 Pages

    | 1. Monitor the condition of equipment during the operation (do not waste production time)…

    • 355 Words
    • 2 Pages
    Satisfactory Essays