Public Private Partnership
PUBLIC PRIVATE PARTNERSHIP (PPP)

Assignment on NH-7 project reference no:NS2/BOT/AP-7

INTRODUCTION:
This project is between NHAI and M/s.Patel KNR Heavy Infrastructures Pvt. Ltd. on BOT annuity basis.
SITE OF THE PROJECT: The Govt, of India is contemplating to enhance the Traffic capacity and safety for efficient transportation of goods and services on the heavily trafficked National highway sections. The project under consideration aims at developing Islamnagar-Kadthal, section of NH-7 from 230 to 278 kms located in the Adilabad district, Andhra Pradesh by widening the existed 2 lanes to 4 lane divided carriageway facility, including strengthening of the existing 2-lanes on build, operate and transfer(annuity) basis.

PAYMENT OF ANNUITY: NHAI shall as security of payment of annuity, provide to the KNR constructions a letter of credit from a schedule bank in India for a sum equal to 44.37 Crores. Such a letter of credit shall be established within 30 days from the expected date of COD as intimated by the KNR constructions. The KNR constructions may either receive bonus for early completion of project or incur reduction in the annuity for the delayed completion of project. Here annuity period is deemed to be a period of 180 calendar days.
PAYMENT MECHANISM: The consigner shall at least one month prior to the relevant annuity payment date submit to NHAI, its invoice for payment of annuity duly adjust for non-availability. The independent consultant shall after verification and certification of the amount claimed in the invoice forward the invoice to NHAI with necessary recommendation for payment thereof so as to reach NHAI at least one week prior to the relevant

You May Also Find These Documents Helpful

  • Good Essays

    This report utilizes the base case analysis, worse case analysis and best case analysis feeling these analyses are sufficient, while many analyses may be of interest, they could confuse the recommendations and strategic value of the project. In preparation the board would be told that calculating multiple NPVs for multiple inflationary rates for labor cost and supply cost would further confuse the issue. The information presented the NPV, IRR, MIRR and payback times would be calculated and discussed. Additionally, a break even point would be calculated. The break even point calculation included in fixed cost would…

    • 495 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    | The cash flows for an annuity due must all occur at the beginning of the periods.…

    • 1959 Words
    • 8 Pages
    Satisfactory Essays
  • Powerful Essays

    Atlantic Aquaculture

    • 2104 Words
    • 9 Pages

    As can be seen in the Appendix C the large project, while taking into account a rwacc of 9% and the expectation that there will be high demand and high growth opportunities for the firm’s products; the Net Present Value of the firm will be $17,140,000.00. An Internal Rate of Return will be realized of 25.83%. Furthermore the MIRR is calculated as 21.54% and the payback period of the project is 7.05 years. Taking all other factors the same, when the firm is building a small facility, the NPV would be $11,723,000.00, the IRR 23.39%, the MIRR 18.05% and the period in which the costs will be paid back 7.18 years.…

    • 2104 Words
    • 9 Pages
    Powerful Essays
  • Best Essays

    Project Finance

    • 2736 Words
    • 11 Pages

    The Lane Cove Tunnel has a structure of public private partnership (PPP). This form of finance involved both public and private sector worked as a joint venture to develop a large infrastructure project (Thia, 2009). The origin of Connector Motorways was the Lane Cove Tunnel Consortium which consists of Thesis Pty Ltd, John Holland Pty Ltd, ABN AMRO Ltd, Transfield Services Limited and Transfield Holding Ltd. The consortium won the project contract from the state government which was then in charge of the design, construction, funding and operation for the Lane Cove Tunnel.…

    • 2736 Words
    • 11 Pages
    Best Essays
  • Satisfactory Essays

    AR | | | | | | | | | | | TCA | | | | | | | | | | | PP&E | will increse by new asset from 2005 | | | | | | | Accumulated depreciation | | | acc to dep. Schedule,changes will occur from 2007,shown in Dep schedule | | | | | | | | | | | | |…

    • 619 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Model 2 ( BOT through funding and execution of Civil Works) gives an IRR of 17.43%. The government pays grants worth 2363 Cr. The concessionaire enjoys a very high IRR without bearing most of the risks. The government is bears the construction and completion risk and the there uncertainties in the expected daily riders, project completions costs and meeting deadline of the 2010 Commonwealth Games. Thus this option is like win loose one. The concessionaire contribute paltry 11% of takes no risks.…

    • 320 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    PPP Guide book

    • 29878 Words
    • 120 Pages

    countries, lack of capacity in the public sector remains to be one of the major…

    • 29878 Words
    • 120 Pages
    Powerful Essays
  • Powerful Essays

    Mineral Water

    • 3672 Words
    • 15 Pages

    The project is financially viable with an internal rate of return (IRR) of 13.46% and a net…

    • 3672 Words
    • 15 Pages
    Powerful Essays
  • Powerful Essays

    COA C97 002

    • 3086 Words
    • 14 Pages

    be made by the disbursing officer in the form of cash through his cash advance.…

    • 3086 Words
    • 14 Pages
    Powerful Essays
  • Satisfactory Essays

    Kindly effect the transfers into the following IKEDC Accounts with the corresponding amounts, being settlements for…

    • 18076 Words
    • 73 Pages
    Satisfactory Essays
  • Good Essays

    Credit Mgt

    • 1304 Words
    • 6 Pages

    To secure the loan will provide his personal guarantees against the facility. Mr. Md. Arif Wahed has been working as a project head in Investment Department of Support and Development Multipurpose Co-operative Society Ltd since September 01,2006. Please be informed that Mr. Md. Arif Wahed currently drawing net salary of Tk. 45,000.00 per month.…

    • 1304 Words
    • 6 Pages
    Good Essays
  • Better Essays

    PPP arrangements are commonly seen in the development of railways, toll roads, water distribution and sanitation, power generation and distribution, port operations, as well as airports and hospitals.…

    • 1225 Words
    • 5 Pages
    Better Essays
  • Satisfactory Essays

    Questions on Chemistry

    • 440 Words
    • 2 Pages

    Paying Invalidity Pension to eligible employees in within 14 days after all information and documents required received.…

    • 440 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Shahil

    • 296 Words
    • 2 Pages

    Fee Payment will be accepted from 2nd working day after Registration and can be made within 3 working days - For Example : If registered on : 24.01.2013 Deposit Fee between : 29.01.2013 to 31.01.2013 (Considering 25.01.2013, 26.01.2013 & 27.01.2013 are non-working days)…

    • 296 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    biology

    • 4199 Words
    • 17 Pages

    All students are required to register on the date stated in the Letter of Offer.…

    • 4199 Words
    • 17 Pages
    Good Essays