SUB: Distance Relay for 110kv Line-1

In our 110kv Line-1 we have Enertec-Schlumberger, France make Back-up Distance relay (21-B1) for line protection and it was kept out of service from
17.09.02 onwards. Because it was malfunctioned in four/five event for unrelated fault in the Grid. There is an another Distance relay in the same line is called Main Distance relay(21-M1) which is in service. But this relay also was not operated in recent fault. Any way it is to be checked during Annual shut down. Now servicing of 21-B1 relay is not possible since the company was closed. In our past experience this make of relays slowly gives trouble and same we are replacing one by one. For Line-2 already we have replaced by New ABB make, RAZOA relay (ref. P.O.No.TCP/PP/SPRS/443 dt.31.01.01) in the place of Main Distance Relay (21-M2).
At present in Line-1 there is no sensitive relay to detect Earth Fault, only Back-up to distance Protection is available(Directional O/C & E/F relay) .This relay will operate for the all zone fault in the line.
So it is decided to procure new distance relay in the place of 21-B1 and MPR has been raised for the RAZOA, ABB make (MPR No. 2973 dt.26/09/03).
You are kindly requested to give an approval to procure the relay as per MPR .

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Dc Input D10 Unit 5

    • 256 Words
    • 2 Pages

    This product is a 10 DC Input, 8 Relay Output DL105 Module that was made by Automation Direct. This module is a product of Koyo, PLC Direct, and Facts engineering working together. This version of the module has a 10-30 VDC power supply instead of a VAC powered output. To protect the module from noise pollution, the module has a protective NEMA casing. The diagnostics of the module allow the users to debug and identify problems. The drive has the dimensions 5.12 x 3.16 x 3.63. The ambient temperature that best works for the module between -20 and 70 degrees Celsius.…

    • 256 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    802.3 is the IEEE working group and it provides standards and recommendations in architecture and internetworking in LANs and MANs…

    • 545 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    The Service Provider for the telecom system is out of business and parts are not available for maintenance…

    • 782 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    310 network lab 3

    • 533 Words
    • 3 Pages

    It is very important to prevent power surge powers with the equipment and hazard shock to people…

    • 533 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Back up Pumps turn on- Lights on the control panel indicated to the operators that the secondary loop water pumps have been turned on. They are unaware that the pumps are disengaged and not performing.…

    • 676 Words
    • 3 Pages
    Good Essays
  • Good Essays

    A large-scale incident that seriously impacts any part of our infrastructure is a frightening one, but considering our heavy reliance on an electrical system that utilizes antiquated and/or obsolete technology, restoring electrical service after massive disruptions (by natural or man-made causes) requires special consideration.…

    • 653 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Seamgas Inc Case Study

    • 355 Words
    • 2 Pages

    Substation yards are co-shared with Powerlink but PowerGenex owns 66kV and 11kV busbars and feeders on the secondary side of power transformers that are owned by Powerlink. These 66kV and 11kV feeders supply power to a small number of farms and Seamgas’s gas wells and processing plants. This SAMP focusses on primary plant assets that are overdue for replacement or require replacement within 10 years. Secondary systems and Telecommunications assets have an expected life of 20 years and the next replacement cycle falls beyond the 10 year period of this SAMP.…

    • 355 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Aspects Of Safeguarding

    • 110 Words
    • 1 Page

    “The main aspects of safeguarding are; minimizing the risk of harm to children's welfare and working in full partnership with other agencies to agreed local policies (Department for Education, 2004). The college has a safeguarding procedure in place, any concern about learners and/or colleagues should be documented and passed to senior leader and/or safeguarding officer. All the data documented follows Data Protection Act (1998) “Teacher must keep all records within confidentiality agreements.” There is online form to document concerns and safeguarding officers available on site or via telephone. Attended safeguarding officer’s presentation were I was made aware of how to prevent extremism and radicalization of any vulnerable adults &…

    • 110 Words
    • 1 Page
    Good Essays
  • Powerful Essays

    ERCOT: Economic Dispatch

    • 1347 Words
    • 6 Pages

    The ERCOT ISO has the responsibilities of ensuring reliable power grid operations in the ERCOT region…

    • 1347 Words
    • 6 Pages
    Powerful Essays
  • Good Essays

    Chad's Creative Concepts

    • 835 Words
    • 4 Pages

    Layout of the manufacturing process and equipment configurations- the importance of the relayout is to reduce the setup time…

    • 835 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Phillips plant’s receives the modules from the Crawley plant which at times are defective so they have to bear the repairing cost along with the overtime and additional inspections. There have been delay in production many times and even complaints from customers. All this along with the 12 modules are the major issues to be handled by the Phillips plant.…

    • 740 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    The battery is used as a back up to the starter generators while in flight or can be used for ground operations. It is connected to the hot battery bus regardless of the battery relay position. The hot battery bus powers the engine fire extinguishers, firewall shutoff valves, entry and cargo lights, clocks, modifications, ground communications, RNAV memory to older avionics and standby boost pumps. The hot bus also supplies the battery power relay that allows the battery to run other electrical systems not connected to the hot bus.…

    • 595 Words
    • 2 Pages
    Satisfactory Essays
  • Best Essays

    References: 4. HomePlug Powerline Alliance, “HomePlug AV White Paper,” August 18, 2005 (Accessed at May 25, 2006, at http://www.homeplug.org/en/docs/HPAV-White-Paper_050818.pdf)…

    • 3916 Words
    • 16 Pages
    Best Essays
  • Good Essays

    Assignment1 IENG 4562

    • 419 Words
    • 3 Pages

    experienced a power surge. 10 percent of the detectors inspected have failed. What is the…

    • 419 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Protective relaying is a very important component of the electrical system. It protects very important and expensive pieces of equipment such as transformers from damage due to faults and other abnormal conditions that may exist on the power grid. More importantly it keeps us with power to our homes at an affordable price. Relaying, while initial costs are high, save utilities money which they can…

    • 334 Words
    • 2 Pages
    Good Essays