Preview

Production of Aggregate

Satisfactory Essays
Open Document
Open Document
3456 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Production of Aggregate
CHAPTER

Construction Planning, Equipment, and Methods

Sixth Edition

AGGREGATE PRODUCTION
• A. J. Clark School of Engineering •Department of Civil and Environmental Engineering

14

By Dr. Ibrahim Assakkaf ENCE 420 – Construction Equipment and Methods Spring 2003 Department of Civil and Environmental Engineering University of Maryland, College Park

CHAPTER 14. AGGREGATE PRODUCTION

Slide No. 1
ENCE 420 ©Assakkaf

PRODUCTION OF CRUSHEDSTONE AGGREGATE
The production of crushed-stone aggregate involves:
Drilling Blasting Loading Transporting Crushing Screening Product handling and storage

1

CHAPTER 14. AGGREGATE PRODUCTION

Slide No. 2
ENCE 420 ©Assakkaf

PRODUCTION OF CRUSHEDSTONE AGGREGATE

In operating a quarry and crushing plant, the drilling pattern, the amount of explosives, the size shovel or loader used to load the stone, and the size of the primary crusher should be coordinated to assure that all stone from the quarry can be economically utilized.

CHAPTER 14. AGGREGATE PRODUCTION

Slide No. 3
ENCE 420 ©Assakkaf

RECOMMENDED MINIMUM SIZES OF PRIMARY CRUSHERS
Table 1

2

CHAPTER 14. AGGREGATE PRODUCTION

Slide No. 4
ENCE 420 ©Assakkaf

TYPES OF CRUSHERS

Crushers are classified according to the stage of crushing which they accomplish, such as:
Primary Secondary Tertiary

A primary crusher receives the stone directly from a quarry after blasting, and produces the first reduction in size.

CHAPTER 14. AGGREGATE PRODUCTION

Slide No. 5
ENCE 420 ©Assakkaf

TYPES OF CRUSHERS

The output of the primary crusher is fed to a secondary crusher, which further reduces the stone size. Some of the stone may pass through four or more crushers before it is reduced to the desired size. The degree of breakage is spread over several stages as a means of closely controlling product size and limiting waste material.

3

CHAPTER 14. AGGREGATE PRODUCTION

Slide No. 6
ENCE 420 ©Assakkaf

TYPES OF CRUSHERS

You May Also Find These Documents Helpful

  • Good Essays

    Your concrete floor market operate the crusher gear, which will most is actually sort crusher, Arena Sludge hammer Crusher, Increase Throw crusher, golf ball generator as well as other accessories because the concrete industry lots of garbage can be crisp resources. Therefore, the use parts of all these companies are significant crusher retracted, crusher blades, thank,crusher ship and so forth. Likewise your crusher spare parts producer is several, as well as wear-resistant pieces is also multifarious , nonetheless, the reliable manufacture just isn't completely.…

    • 592 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    5.Special feeding structure; rock on rock, and rock on iron in the crusher making the stone to be crushed and reshaped.…

    • 676 Words
    • 3 Pages
    Satisfactory Essays
  • Best Essays

    Hassan A. Tabatabaee, Hussain U. Bahia(2012).Department of Civil and Environmental Engineering, University of Wisconsin-Madison 1415 Engineering Dr., Room 3350, Madison, WI 53706, USA.…

    • 2449 Words
    • 10 Pages
    Best Essays
  • Good Essays

    Separation of Gold

    • 1756 Words
    • 8 Pages

    In an underground mine, primary crushing often takes place in a crusher located near the bottom of the main shaft. Ore is tipped down "ore-passes" and is fed to the crusher before being hoisted to the…

    • 1756 Words
    • 8 Pages
    Good Essays
  • Powerful Essays

    References: ASCE (American Society of Civil Engineers). (2005). Report Card for America 's Infrastructure (on-line). Available: http://www.asce.org/reportcard/2005/index.cfm.…

    • 1860 Words
    • 8 Pages
    Powerful Essays
  • Best Essays

    Bim for Sustainable Design

    • 4795 Words
    • 20 Pages

    McWhorter School of Building Science, Auburn University, Auburn, AL, USA Department of Construction Management, Florida International University, Miami, FL, USA…

    • 4795 Words
    • 20 Pages
    Best Essays
  • Satisfactory Essays

    Lobos

    • 942 Words
    • 4 Pages

    III Sem. 9.30 a.m. - 12.30 p.m. MATDIP301–Advanced Mathematics–I 10MAT31–Engineering Mathematics–III 10CV32–Building Materials & Construction Technology 10CV33–Strength of Materials 10CV34–Surveying–I 10CV35–Fluid Mechanics 10CV36–Applied Engineering Geology…

    • 942 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    In this quarry,the required size of broken rock should be provided before loading for hauling.Th erefore a hydraulic hammer iS used to break oversize boulders.In order to estimate the drilling and secondary breaking cost of per ton limestone,the unit cost of driller and hydraulic ham er has been estimated as $/h that includes ownership and operating costs.The results were 54.1l$/h for driller and 44.46$/h for hydraulic ham er.Then the total working time of driller and ham er had been recorded for each blasting.Since the production of each blasting had been found by weighting,the unit production cost was calculated by multiplying the total working time with the unit cost of equipment and dividing the result by total pro—duction.The blasting cost consisted of the cost of ANFO.The summ ary of the resuits is given…

    • 370 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    5 . Crusher work should always check the locking system , identify problems and timely treatment .…

    • 856 Words
    • 4 Pages
    Good Essays
  • Good Essays

    This project, by Harshad J. Shah, is accepted in its present form by the Department of Civil Engineering Science of Brigham Young University as satisfying in part the requirements for the degree of Master of Civil Engineering.…

    • 1570 Words
    • 7 Pages
    Good Essays
  • Good Essays

    Aggregate supply

    • 494 Words
    • 2 Pages

    In economics, aggregate supply is the total supply of goods and services that firms in a national economy plan on selling during a specific time period. It is the total amount of goods and services that firms are willing to sell at a given price level in an economy.…

    • 494 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    The invention of mobile crusher promote the disposal of stones and speed up the crushing process.With the rapid development of Mining machinery in the world,the demand of stone crusher is very becoming more and more important. If you have more understanding about stone crusher,you will know that stone crusher can be called stone crusher. The common stone crusher types contain jaw crusher,cone crusher and impact crusher. Different kinds of crusher types can meet your different needs. Today,we will talk about mobile crusher maintenace knowledge. If you want to keep your mobile crusher for a long time,it is very necessary for you to learn more knowledge ofmobile crusher maintenance. Mobile crusher is the principle of static pressure. The basket shaking softer the second time. It is easy to install. The size reduction is the high efficiency of bed materials cone crusher. It works stable and saves a lot of time on a large scale.It can be freely laid up-right without supports and has good gridding screen gallery, excellent performance, best mobility and flexibility; meanwhile, it provides excellently selected low cost style and has the features of stable design, light job content, convenient transportation, low feeding height, short assemble time, high dependability and perfect defensive function.…

    • 287 Words
    • 1 Page
    Satisfactory Essays
  • Good Essays

    Thamer Ahmed Mohammed, Megat Johari Megat Mohd. Noor, Abdul Halim Ghazali Department of Civil Engineering Faculty of Engineering University Putra Malaysia 43400 UPM Serdang, Selangor, Malaysia e-mail:thamer@eng.upm.edu.my…

    • 2980 Words
    • 12 Pages
    Good Essays
  • Better Essays

    3Associate Professor and PG Coordinator (M.E C E & M), Civil Engineering Department, B.V.M. Engineering College, Vallabh Vidyanagar-Gujarat-India…

    • 2060 Words
    • 9 Pages
    Better Essays
  • Satisfactory Essays

    Department of Civil and Environmental Engineering Division of Construction Management CHALMERS UNIVERSITY OF TECHNOLOGY NORTHUMBRIA UNIVERSITY Göteborg, Sweden 2010…

    • 28098 Words
    • 113 Pages
    Satisfactory Essays