Preview

Process Capability

Powerful Essays
Open Document
Open Document
1566 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Process Capability
Process capability studies determine whether a process is unstable, investigate any sources of instability, determine their causes, and take action to resolve such sources of instability. After all sources of instability have been resolved in a process, the natural behavior of the process is called its process capability. Process capability compares the output of a process (called “Voice of the Process”) with the customer’s specification limits for the outputs (called “Voice of the Customer”). A process must be stable (have an established process capability) before it can be improved. Consequently, a process capability study must be successfully completed before a process improvement study can have any chance for success.

Process improvement studies follow the Deming cycle of Plan, Do, Study, Act. First, managers construct a plan to decrease the difference between customer needs (Voice of the Customer) and process performance (Voice of the Process). Recall, that a plan is an intention to move from an existing method or flowchart to a revised method or flowchart by incorporating one or more change concepts. Second, they test the revised flowchart’s (Plan) viability using a planned experiment (Do). Third, they collect data and study the results of the planned experiment to determine if the plan (revised flowchart) will decrease the difference between customer needs and process performance (Study). Fourth, if the data collected about the revised flowchart show if the plan will achieve its objective(s). Finally, the revised flowchart is standardized through "best practices" and training (Act); and the managers responsible for the plan return to the Plan phase of the Deming cycle to find further revisions to the flowchart that will further reduce the difference between customer needs and process performance. If the data collected about the plan show that the plan will not achieve its objective(s), the managers responsible for the plan return to the Plan phase of the

You May Also Find These Documents Helpful

  • Powerful Essays

    Qdc1 Study Guide

    • 3244 Words
    • 13 Pages

    Identify procedures that lead to process improvement. customer satisfaction, achieving higher quality, reducing waste, reducing cost, increasing productivity, and reducing processing time.…

    • 3244 Words
    • 13 Pages
    Powerful Essays
  • Better Essays

    Ops-571 Assignment

    • 1146 Words
    • 5 Pages

    Successful organizations continuously strive to improve the processes they have in place. Process improvement leads to better quality control, higher efficiencies and lower costs. In order to implement a process improvement plan, it is necessary to collect and analyze data from the process. In this paper, I present an analysis of the metric data collected for the process I identified during week #1. As part of the analysis, the control and confidence limits are calculated, as well as other relevant statistics. With this information, a process improvement plan is developed.…

    • 1146 Words
    • 5 Pages
    Better Essays
  • Satisfactory Essays

    Comment on the factors that affect the process design. Identify at least one metric to measure process.…

    • 1027 Words
    • 5 Pages
    Satisfactory Essays
  • Powerful Essays

    Roman Numerals and Process

    • 1690 Words
    • 7 Pages

    1. The capability index allows for some drifting of the process mean. Discuss what this means in terms of product quality output.…

    • 1690 Words
    • 7 Pages
    Powerful Essays
  • Best Essays

    Breyfogle, F. W.. (2010). Process improvement projects shortcomings and resolution. International Journal of Lean Six Sigma, 1(2), 92-98.…

    • 1530 Words
    • 7 Pages
    Best Essays
  • Satisfactory Essays

    HCS 455 Reflective Essay

    • 488 Words
    • 2 Pages

    In the study phase the results of the ‘Do’ stage will be analyzed and measured for surprises, failures, successes, and consequences. In the study phase it is good to review the results and compare them to the predicted outcomes and establish modifications that will make the policy better from what was learned.…

    • 488 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    There are several methods on creating an evaluation plan to make sure that the plan that was implemented is still going in the desired direction. A very common…

    • 809 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    This week students need to select a process improvement project to work on during this course. There are four parts to this mini-project that you will do throughout this course (read all four parts due Week 2, 4, 6, and 8 before continuing with this assignment to understand how this breaks down in the coming weeks - link). Students may select something at work (i.e. a process or quality issue that can be pursued to help grow your career) or it may be something that will simply make your life easier at home (i.e. getting ready in the morning/evening for work, cooking a meal, etc.).…

    • 560 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Bjb Management Strategy

    • 831 Words
    • 4 Pages

    The process-driven quality approach focus on making improvements in the quality of the process applied to…

    • 831 Words
    • 4 Pages
    Good Essays
  • Better Essays

    In every successful organization, management is continual finding ways to tweak operational and managerial process to ensure efficiency and maximize profitability. Through learning curves, flowcharts, and statistical process controls improvement plan enable leaders to advance the company’s business interests through refining the structure of operations as opposed to solving problems singularly. It also eliminates traditional behaviors such as placing blame and pointing fingers and focuses on how the organization on a whole can work together. A true process improvement plan uses historical knowledge and the statistical implementation of data to minimize variations, rid the process on unwanted activities that are noncontributory.…

    • 958 Words
    • 4 Pages
    Better Essays
  • Best Essays

    Using the Six Sigma process improvement method, several steps will identify the bottleneck to improve one aspect of the current process performance. The Six Sigma process is a system of defining, measuring, analyzing, improving, and controlling (DMAIC) a process for an existing process that fall below specifications and looking for incremental improvements (Swinton, 2006). The process will clearly define the problem in the following manner:…

    • 1316 Words
    • 6 Pages
    Best Essays
  • Good Essays

    Welding and Hot Work

    • 747 Words
    • 3 Pages

    I introduced the management team to a proven system management system called the PDCA The Plan-Do-Check-Act concept. (pg. 36) I break down the concept so that it easily understood what type of transformation that I am going to take their company through. The PDCA processes, as follows:…

    • 747 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    What Are Capabilities?

    • 270 Words
    • 2 Pages

    Capability is a capacity for a set of resources to integratively perform a stretch task. It represents the identity of the firm as perceived by both its employees and customers. It is the firm’s ability to perform better than competitors using a distinctive and difficult to replicate set of business attributes. The organization’s capability is comprised of three core assets – physical capital, including all tangible assets; technology capital, including product technology, R&D, information technology and process technology; and human capital, including employees and contract staff.…

    • 270 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    The first step is to develop a plan and establish the objective of the plan. The second step is to carry out, or do, the plan. The third step is to study the plan. In other words, the data should be analyzed, and a summary of what was learned should be given. The fourth step is to act. The next continuous cycles should be established with modifications, if necessary (Gillam & Siriwardena,…

    • 1294 Words
    • 6 Pages
    Powerful Essays
  • Satisfactory Essays

    Meaning and significance of statistical process control (SPC) – construction of control charts for variables and attributed. Process capability – meaning, significance and measurement – Six sigma concepts of process capability. Reliability concepts – definitions, reliability in series and parallel, and product life characteristics curve. Total productive maintenance (TMP) – relevance to TQM, Terotechnology. Business process re-engineering (BPR) – principles, applications, reengineering process, benefits and limitations.…

    • 286 Words
    • 2 Pages
    Satisfactory Essays