Polavaram Dam Project
Polavaram Project is a multi-purpose irrigation project which has been accorded national project status by the central government.[1] This dam across the Godavari River is under construction. It is located in West Godavari district in Andhra Pradesh state of India.

PURPOSE
National River-Linking Project, which works under the aegis of the Indian Ministry of Water Resources, was designed to overcome the deficit in water in the country. As a part of this plan, surplus water from the Himalayanrivers is to be transferred to the peninsular rivers of India. This exercise, with a combined network of 30 river-links and a total length of 14,900 kilometres (9,300 mi) at an estimated cost of US$120 billion (in 1999), would be the largest ever infrastructure project in the world.[2] In this project's case, the Godavari Riverbasin[3] is considered as a surplus one, while theKrishna River basin is considered to be a deficit one.[4]As of 2008, 644 tmcft of underutilised water from Godavari River flowed into the Bay of Bengal.[5] Based on the estimated water requirements in 2025, the Study recommended that sizeable surplus water was to be transferred from the Godavari River basin to the Krishna River basin.[4]

In July 1941, the first conceptual proposal for the project came from the erstwhile Madras Presidency. Later Diwan Bahadur L. Venkata Krishna Iyer, then chief engineer in the Presidency's irrigation department, made the first survey of the project site and made a definitive proposal for a reservoir at Polavaram. Sri Iyer not only visioned cultivation of 350,000 acres (140,000 ha) over two crop seasons through this project, but also planned for a 40 megawatt hydroelectric plant within the project. The entire project was estimated to cost about 65 million (US$990,000). The old final designs[6] of Polavaram dam was planned at full reservoir level (FRL) 208 ft MSL with 836 tmcft gross storage capacity and 150 MW hydroelectric plant. By 1946–47, the estimated cost rose to 1.29 billion. It was christened as Ramapada Sagar Project since the backwaters of the reservoir would touch the Lord Rama temple at Bhadrachalam. In the old finalised project design by Dr.K.L. Rao, the right bank canal of Polavaram project was extended to south of Krishna River to serve irrigation needs in old Guntur district by envisaging aqueduct across the Krishna River.

The project presently under construction is scaled down to FRL 150 ft MSL. The project cost estimate in 2004 stood at 86.21 billion.[7]

In 1980, then Chief Minister of Andhra Pradesh T. Anjaiah laid the foundation stone for the project. However the project stayed idle until 2004 when the Y. S. Rajasekhara Reddy-led government came to power.[8]In 2004, the Government of Andhra Pradesh sanctioned 13.2 billion (US$200 million) for the project.[9] Soon after, tenders were issued for the commensurate worth of services for the right canal of the project.[10] For the left canal, another 13.53 billion were sanctioned by the state government.[7]

The dam could not be taken up for construction during the last century on techno economical grounds. The proposed dam site at Polavaram is located where the river emerges from the last range of the Eastern Ghatsinto plains covered with deep alluvial sandy strata. At Polavaram, the river width is about 1500 m. In view of large depth of excavation which is more than 30 m deep, to reach hard rock at this dam site, the dam project was not found economical to take up. However a lucrative alternate site is feasible located in upstream of Polavaram site where the river passes through deep gorges of Papi hill range.[1] The width of river is about 300 m only in the rocky gorge stretch. Thirty years back, this alternative was found technologically challenging task to connect the reservoir with the irrigation canals via tunnels across the ghat area. Also costly underground hydro electric station is mandated compared to river bed based hydro electric station. When the project was actually taken up in the year 2004, the old finalised designs at Polavaram site are adopted without re-examining the latest cost of upstream alternate site in view of state of the art construction technology of tunnels and underground hydro electric station. The progress up to the year 2012 in construction of dam structures and the hydro electric station is almost nil.[11] The alternate site located in the gorge stretch is still worth of re-examination to reduce the ever increasing cost of Polavaran dam.

The spillway and non-overflow dam are founded onKhondalite bed rock in Polavaram Project.[1]Khondalites, which are feldspar-rich, often contain soft graphite, hard garnet, etc. in addition to other minerals. Khondalites are highly weathered and hence unsuitable at dam site.

As of 2004, the proposed project would hold 75.2 tmcftthereby enabling irrigation of an additional 232,000 acre in Krishna, West Godavari, East Godavari,Visakhapatnam, Vizianagaram and Srikakulam districts of Andhra Pradesh.[7]

The project would constitute an earth-cum-rock fill dam of 2,310 metres (7,580 ft) length, spillway of 907 metres (2,976 ft) with 44 vents to enable discharge of 3,600,000 cu ft/s (100,000 m3/s) of water. To its left, 12water turbines, each having 80 megawatt capacity, were to be installed. The right canal connecting to Krishna River in the upstream of Prakasam Barrage (173 kilometres (107 mi) long) discharges 17,500 cu ft/s (500 m3/s) at head works and left canal (182 kilometres (113 mi) long) discharges 17,500 cu ft/s (500 m3/s) of water.[7]
The proposed project would displace 276 villages and 44,574 families spread across three districts of Andhra Pradesh. Tribals constitute 50% of such a displaced population.[13] Human rights activists came out against the project because of these reasons. In addition, one activist pointed out that this interlinking of the rivers will harm the interests of the Telangana and Rayalaseemaregions of the state.[14] Environmental activist Medha Patkar said that the project not only will displace several thousands of families, it will also submerge severalarchaeological sites, coal deposits, a wildlife sanctuaryand several hectares of farm land.[15]

Sixty-four years after the initial conception of the project, the Government of Andhra Pradesh secured the environmental clearance from the central agency in 2005. This clearance was obtained after the state government prepared a 4,500 crore forest management plan and rehabilitation and resettlement proposal covering 59,756 hectares that were being lost under the project. In addition, 40,000 was to be allotted for each dwelling to be constructed for the displaced as against 25,000 provided by other states.[16] Despite this clearance, the project faced political roadblocks. The Communist Party of India (M) and Telangana Rashtra Samithi were troubled with the issue of submerging agricultural lands and the detriment to Telangana, respectively.[17][18]

Meanwhile, work on the project began in April 2006 and was expected to be completed by February 2007.[19]After 30% work of excavation work on the canals and 15% of the spillway works had been completed, the work was halted in May 2006 to seek clearance from the Ministry of Forests and Environment.[20]

The neighbouring state of Orissa also expressed its concern on the submerging of its land and decided to study this together with the officials from Andhra Pradesh.[21] In response, Chief Minister of Andhra Pradesh Late Y. S. Rajasekhara Reddy clarified that neither Orissa nor Chattisgarh would be affected by the construction.[22] The problem continued until 2010, when Chief Minister of Orissa Naveen Patnaik remained steadfast in his demand for compensation and rehabilitation of tribals of his state who would be displaced due to the submerging of their land.[23]

Orissa and Chattisgarh have filed a petition in the Supreme Court against the Project which submerges large areas of its state and allege that Andhra Pradesh of going ahead with the project without the necessary permissions from CWC and Environment Ministry. The states also allege that public hearing in the effected areas for not held.

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Unit 5 Assignment 1

    • 297 Words
    • 2 Pages

    The main problem in the construction of the Dulhasti Power Plant Project is the project cost estimation and delivery. The project was based on a straight concept: Dilhasti was designed as a 390MW hydroelectric power plant to be built on Chenab River in the Doda region, The project was supposed to build a hydroelectric generating station, and string hundreds of miles of transmission lines starting near the headwaters of a system of rivers flowing onto the plain south of the mountain region.…

    • 297 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    What is a large development project and why would a country wan to have one? A large development project is a project like Akosombo Dam in Ghana, a big investment in which the country hopes it will pay for itself, as in it will produce more tourist or goods to sell. Countries want this because they believe it is a quick way to make a lot of money and to improve the infrastructure of the countries, so the country will be generally improved. Therefore I will investigate the Akosombo Dam in Ghana; first I will give some background information, photos/ diagrams, its history, pros and cons etc.…

    • 856 Words
    • 4 Pages
    Good Essays
  • Good Essays

    The major area of strength in the management of the project is that the project was covered with four phases: inception, development, implementation, and closeout (Anbari, n.d.). In the inception phase, there was already a vision of what the Guri dam will be like. Its purpose is also identified such that it will serve as a reservoir which could store a large amount of water. It was also in this phase that the cost of the project was estimated. Furthermore, this project has seen the need of help from the international companies because of a lack of national knowledge in dam construction. This project also sought for quality. According to Anbari (n.d.), quality and sustainable development in Edelca’s management…

    • 807 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Impact of Dams

    • 1407 Words
    • 6 Pages

    The innovation of dams has created a revolution in the state and phase of water resources since its establishment. Dams serve several purposes that are so beneficial that constructing a dam becomes an imperative mission for a particular nation. In the book, “Principles of Water Resources”, Cech (2009, p . 217) states “ Dams are a basic fundamental, management tool used to control, regulate and deliver water for a variety of purposes”. As mentioned by the author, these several purposes include hydroelectric generation, water supply, irrigation, flood control, recreation, navigation and many more valuable purposes. However, despite the much better outcomes, dams have faced huge criticism over the past years soon after its innovation. This reveals the issue that dams have some negative consequences that have put the subject under so much criticism. However, the range of positivity and negativity differs for each of the backdrops that dams influence. It is important to evaluate dams due to their immense impact in several contexts such as economic, social and environmental.…

    • 1407 Words
    • 6 Pages
    Powerful Essays
  • Powerful Essays

    chilime annual report 2011

    • 17027 Words
    • 69 Pages

    Project affected people - 10% 2. General Public - 14% PPA signed with NEA for: 1. Rasuwagadhi Hydroelectric Project (111 MW) 2. Middle Bhotekoshi Hydroelectric Project (102 MW) 3. Sanjen Hydroelectric Project (42.5 MW) 4.…

    • 17027 Words
    • 69 Pages
    Powerful Essays
  • Powerful Essays

    Philippine Dam Crisis: Contending the Deferment of the Laiban Dam Project 2013 Bulacan State University COLLEGE OF ENGINEERING City of Malolos, Bulacan Philippine Dam Crisis: Contending the Deferment of the Laiban Dam Project BY ALMAZAN, Erwin V. ATIENZA, Joel Jeremiah G. BERSABAL, Marvin R. EUGENIO, Darwin B. TOLOSA, Andrew Ian Grey J. Group 6, ECE 4-A (Accomplished August 16, 2013 in compliance to the requirements of the academic program “Environmental and Safety Engineering”, 1st Semester, SY 2013-2014) Philippine Dam Crisis: Contending the Deferment of the Laiban Dam Project 2013 Abstract Dams were once considered as prime catalysts to the advancement of human progress, harnessing commercial value from arid rivers at the expense, however, of the riparian people and environment within and beyond.…

    • 3212 Words
    • 16 Pages
    Powerful Essays
  • Satisfactory Essays

    Save Ganga Movement

    • 409 Words
    • 2 Pages

    Ganges is the largest and the most sacred river of India with enormous spiritual, cultural, and physical influence. It provides water to about 40% of India's population in 11 states. It is estimated that the livelihoods of over 500 million people in India are dependant upon the river, and that one-third of India's population lives within the Ganges Basin. Despite this magnitude of influence and control by the river over present and future of the country, it is allegedly under direct threat from various man made and natural environmental issues.…

    • 409 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    The History of the Tehri Dam

    • 5230 Words
    • 21 Pages

    A preliminary investigation for the Tehri Dam Project was completed in 1961 and its design was completed in 1972 with a 600 MW capacity power plant based on the study. Construction began in 1978 after feasibility studies but was delayed due to financial, environmental and social impacts. In 1986, technical and financial assistance was provided by the USSR but this was interrupted years later with political instability. India was forced to take control of the project and at first it was placed under the direction of the Irrigation Department of Uttar Pradesh. However, in 1988 the Tehri Hydro Development Corporation was formed to manage the dam and 75% of the funding would be provide by the federal government, 25% by the state. Uttar Pradesh would finance the entire irrigation portion of the project. In 1990, the project was reconsidered and the design changed to its current multi-purpose.[1] Construction of the Tehri Dam was complete in 2006 while the second part of the project, the Koteshwar Dam, is nearly complete with two out of four generators operational. The other two are expected to be commissioned in March 2012 while the pumped storage power planned is slated for commissioning in February 2016.[2]…

    • 5230 Words
    • 21 Pages
    Powerful Essays
  • Satisfactory Essays

    region, was built in Nghe An province with the total expenditure of $1.2 billion, this project is supported…

    • 871 Words
    • 4 Pages
    Satisfactory Essays
  • Satisfactory Essays

    RCC COMPACTION ROLLER

    • 407 Words
    • 2 Pages

    With the advent of opening the economy, speedy and economic construction of dams for hydro power and/ or irrigation has become necessity of the day. Though the technology of RCC dams is more than two decades old in India, the first RCC dams for Ghatghar Pumped Storage Hydro Project in Maharashtra has been undertaken in 2001-2002. It was conceived to complete the lower dam of 81 meter height and 390 meter length at the crest in two seasons. However, the learning curve took more than estimated time and the dam is expected to be completed in 2006 to 2007 working season.…

    • 407 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Bhavnath Temple

    • 1085 Words
    • 5 Pages

    Under Plan A the dam was to impound 4700 million cu.ft of water irrigating 92,000 acres of land at a cost of 1.7 crores. It was expected that the increase in agricultural production would be 30,400 tons every year and this was valued at 1.4774 crores. The new plan (Plan B) called for raising the irrigation potential of the dam by raising the level the three control levels. The dam would now hold 5,700 million cu.ft of water and was estimated to cost 1.9 crores. Therefore,…

    • 1085 Words
    • 5 Pages
    Good Essays
  • Better Essays

    Padma Bridge

    • 3416 Words
    • 14 Pages

    Project cost is estimated to be US$3.00 billion. Funding for the project is provided by the Asian Development Bank (US$615 m), the World Bank ($1.5 billion), Japan International Cooperation Agency ($415 m), Islamic Development Bank ($140 m). The government also signed another $14.84 million agreement with the IDB for the implementation of the water-supply and sanitation project in cyclone-prone…

    • 3416 Words
    • 14 Pages
    Better Essays
  • Satisfactory Essays

    MRVP- construction of Mini dam with bridge cum regulator across Meenachil river at Arunapuram in Pala municipality.…

    • 521 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Project on Cuboid

    • 474 Words
    • 2 Pages

    Therefore the cost of construction of even a smaller size dam involves spending of crores of rupees !!!!!!…

    • 474 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Hydro Power

    • 1083 Words
    • 5 Pages

    Amaravathi Dam at Amaravathinagar, 25 km south on SH 17 from Udumalpet, is located in Indira Gandhi Wildlife Sanctuary in Coimbatore district,Tamil Nadu, India. The 9.31 km², 33.53 m deep[1] Amaravathi Reservoir was created by this steep dam. It was built primarily for irrigation and flood control and now also has 4 megawatts of electric generating capacity installed. It is notable for the significant population of Mugger Crocodiles living in its reservoir and catchment basin.…

    • 1083 Words
    • 5 Pages
    Good Essays