OPS/571 week 4
The master schedule has three inputs: the beginning inventory, product forecasts, and customer orders. Customer order quantities may not be committed forecasts. The master schedule has three outputs: projected inventory, master production schedule, and available-to-promise (ATP).
For example, a company that makes industrial pumps wants to prepare a master production schedule for June and July. Marketing has forecasted demand of 120 pumps for June and 160 pumps for July. By evenly distributing over the four weeks in each month, we have 30 per week in June and 40 per week in July.

Now, suppose that there are currently 64 pumps in inventory and there are customer orders that have been committed and must be filled. These inputs result in the following table.

Next, we need to use this information to determine projected inventory, master production schedule (MPS), and ATP.
If no production is planed, projected inventory becomes negative from week 3. This is a signal that production is needed to replenish inventory.

Suppose that a production lot size of 70 pumps is used, 70 pumps will be produced, whenever the projected inventory becomes negative.

As a result of the negative projected inventory, we need to have production in weeks 3, 5, 7 and 8.
After MPS is created, it is now possible to determine the amount of inventory that is uncommitted, and hence available to promise. A "look-ahead" procedure sums booked orders week by week until (but not including) a week in which there is an MPS amount. For the first week, this procedure results in summing customer orders of 33 (week 1) and 20 (week 2) to obtain 53. Then, the amount is subtracted from the beginning inventory of 64 pumps plus the MPS in the two week 1 to obtain the amount that is available to promise, i.e., 64 + 0 - (33+20) = 11. For weeks other than the first week, the beginning inventory drops out of the computation, and ATP is the look-ahead quantity subtracted from the MPS quantity.

You May Also Find These Documents Helpful

  • Better Essays

    The production capacity in my first 2 quarters was low but only because it was upcoming…

    • 1412 Words
    • 6 Pages
    Better Essays
  • Good Essays

    Capsim Simulation S't'R'a'Te

    • 3387 Words
    • 14 Pages

    Finally, the production division plans the assembly line running. Managers should consider the sales forecast and inventory units left last year. Our goal is to produce the number of units can satisfy the market demand and carry unsold unit inventory as few as possible.…

    • 3387 Words
    • 14 Pages
    Good Essays
  • Good Essays

    Micoeconomics

    • 649 Words
    • 3 Pages

    The quantity supplied for prices P(a), P(b), P(c), P(d) were calculated based on the MC’s of each type – if the price is below the MC of the firm, the firm would stop its production. The quantities to be supplied for each price level is like below:…

    • 649 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Business management notes

    • 1673 Words
    • 7 Pages

    43. The MRP process of determining requirements for lower level items based on the master production schedule is referred to as…

    • 1673 Words
    • 7 Pages
    Good Essays
  • Good Essays

    The planning process will take account of engineering changes and exhaust types of revision change and if multiple distributor inventories are being managed, the MRP / DRP process will try to balance their inventories based on a series of parameters specified by the user.…

    • 3602 Words
    • 15 Pages
    Good Essays
  • Satisfactory Essays

    Inventory Models

    • 419 Words
    • 2 Pages

    Since the items are ordered once for the period, the only inventory decision to be made is how much of the product to order at the start of the period.…

    • 419 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    All Model Q Cpim

    • 12219 Words
    • 49 Pages

    Chapter One – Introduction to Materials Management..........................................................................1 Chapter Two – Production Planning System .........................................................................................2 Chapter Three – Master Scheduling.......................................................................................................3…

    • 12219 Words
    • 49 Pages
    Powerful Essays
  • Satisfactory Essays

    DYNAMIC BUFFER SCHEDULE

    • 1551 Words
    • 23 Pages

    Demand Driven Capacity Scheduling and Execution Chad Smith Partner, Demand Driven Institute Co-Author Orlicky’s Material Requirement Planning 3/E Co-Author Demand Driven Performance – Using Smart Metrics All material and © copyright Demand Driven Institute 2013, all rights reserved Planning and Scheduling is Harder Than Ever • • • • The Manufacturing and Supply Chain landscape is more volatile than ever – the bullwhip is alive and well in today’s environment Customer Tolerance Times have decreased substantially relative to the time it takes to procure, manufacture and distribute items Product variety, options and complexity has put tremendous pressure on planning and scheduling systems FLOW is the critical link between service, asset utilization and ROI All material and © copyright Demand Driven Institute 2013, all rights reserved The Demand Driven Operating Method • The protection of FLOW is paramount • ROI is directly proportionate to the speed of flow of relevant materials and information • Demand Driven operating methods seek to protect the flow of both relevant information and materials All material and © copyright Demand Driven Institute 2013, all rights reserved DDMRP and Capacity Scheduling • DDMRP has Implications for Capacity Scheduling • Advanced Session Webinars • Download the paper on DDMRP Master Scheduling for more information All material and © copyright Demand Driven Institute 2013, all rights reserved DDMRP Scheduling Basics DDMRP uses buffered “Decoupling Points” to establish independent planned and scheduled horizons.…

    • 1551 Words
    • 23 Pages
    Satisfactory Essays
  • Good Essays

    secret

    • 11441 Words
    • 44 Pages

    When the monthly production plan has been agreed, there are several important actions to take to ensure that production keeps to this plan. Four are dealt with in this text and three in Text 13.3:…

    • 11441 Words
    • 44 Pages
    Good Essays
  • Good Essays

    Is an efficient way of allocating, controlling and managing materials, capital and human resources to produce final goods from the available inputs? Schedules are more formal in the production of goods rather than services with short, medium and long term planning to assist customer demands. For services the demand is often more straight forward.…

    • 1053 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    My Report in Mrp

    • 1219 Words
    • 5 Pages

    is a software based production planning and inventory control system used to manage manufacturing processes. Although it is not common nowadays, it is possible to conduct MRP by hand as well.…

    • 1219 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    ERP Assignment answers

    • 670 Words
    • 8 Pages

    Given the following information about Xyz Company that produce children cereal A and B complete the tables below:…

    • 670 Words
    • 8 Pages
    Satisfactory Essays
  • Powerful Essays

    HRM Case Study

    • 1569 Words
    • 7 Pages

    Production—What products does the market want? How much of which products should be produced and by when? This activity includes the creation of master production schedules that take into account plant capacities,…

    • 1569 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    Littlefield Technologies

    • 809 Words
    • 4 Pages

    Littlefield Technologies (LT) has developed another DSS product. The new product is manufactured using the same process as the product in the assignment “Capacity Management at Littlefield Technologies” — neither the process sequence nor the process time distributions at each tool have changed. On day 0, the factory began operations with three stuffers, one tester, and one tuner, and a raw materials inventory of 9600 kits. This left the factory with $1,000,000 in reserves. Customer demand continues to be random, but the long-run average demand will not change over the product’ 268-day lifetime. At the end s of this lifetime, demand will end abruptly and factory operations will be terminated. At this point, all capacity and remaining inventory will be useless, and thus have no value. Management would like to charge the higher prices that customers would pay for dramatically shorter lead times. However, historic lead times often extend into several days, so management has been unwilling to quote the shorter lead times.…

    • 809 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    In any manufacturing enterprise production is the driving force to which most other functions react. This is particularly true with inventories; they exist because of the needs of production. In this chapter the relationship of production planning and control to work-in-process inventories is…

    • 2790 Words
    • 12 Pages
    Powerful Essays