Preview

New Installation Options for a High-Availability SAP System Based on SAP NetWeaver 7.1

Powerful Essays
Open Document
Open Document
2561 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
New Installation Options for a High-Availability SAP System Based on SAP NetWeaver 7.1
New Installation Options for a HighAvailability SAP System Based on SAP NetWeaver 7.1 Including EHP1 (7.11) in a Microsoft Cluster

Applies to:
SAP systems based on SAP NetWeaver 7.1 including EHP1 (7.11) and higher.

Summary
As of SAP NetWeaver 7.1 including EHP1 (7.11), and higher, SAP has adapted the installation procedure for a high-availability system on Windows Microsoft Failover Clustering to make it easier and less error-prone for customers. This document shows the new features and main advantages of the new cluster setup compared to the previous one. Authors: Goran Condric, Klaus-Georg Adams

Company: SAP AG, Created on: 9 January 2008

Authors Bio
Goran Condric joined SAP in 2000 and works in the Microsoft Platforms team. He is responsible for the deployment of SAP systems on Windows and the architecture of SAP high-availability solutions on Microsoft Failover Clustering. He also works on new virtualization concepts for SAP software on Microsoft platforms. Klaus-Georg Adams joined SAP in 2001. He works in the Software Logistics team and is responsible for the architecture of the SAP NetWeaver installation.

SAP COMMUNITY NETWORK © 2009 SAP AG

SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com 1

New Installation Options for a High-Availability SAP System Based on SAP NetWeaver 7.1

Table of Contents
New Installation Options for a High-Availability SAP System Based on SAP NetWeaver 7.1 Including EHP1 (7.11) in a Microsoft Cluster......................................................................................................3 Old Setup for an SAP High-Availability System Based on SAP NetWeaver 7.0 and 7.1 with Microsoft Custer ........................................................................................4 New Setup for an SAP High-Availability System with Microsoft Custer (SAP NetWeaver 7.11 and higher) .5
First Cluster Node

You May Also Find These Documents Helpful

  • Satisfactory Essays

    The company is reengineering the company’s Intranet/Information systems and enterprise resource planning (ERP) system. The upper management has chosen to implement SAP to connect all aspects of the company; accounting, manufacturing, aircraft services, supply inventory, and customer resource management (CRM). Implementing this new information system (IS) will allow the different parts of the company to operate as one, by allowing the various modules in SAP to communicate and exchange data. SAP will replace all of the outdated and splintered software the company currently uses by allowing easier communication between the departments and the programs that are used. The change was started about three years ago and will be completed in about two years for a total of five years to complete and be fully implemented. Connecting all of the different departments will save a tremendous amount of money for the company. Reengineering the IS systems will allow the sales department and customer representatives more easy access to the customer’s information, such as current and future orders, current aircraft service status or new aircraft delivery time; thereby increasing the customers value and customer…

    • 464 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Q3: How is the adoption of SAP viewed by (a) production staff, (b) IT staff and (c) the management?…

    • 691 Words
    • 3 Pages
    Good Essays
  • Good Essays

    4. What were the benefits and risks of the move to SAP ERP software? [table]…

    • 493 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    Complicating matters was the reluctance by many people on the business side to embrace SAP. The company will have to work on the cultural piece, the education piece, and then the technical piece of it. Recalled MacDonald, ¡§Once providing resources to support the implementation became part of line management¡¦s job expectations and was clearly embedded in their performance requirements, we started to see a lot of progress¡K. We had to dedicate resources to making this successful.¡¨…

    • 509 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Erp Definition

    • 8083 Words
    • 33 Pages

    This report aims at investigating the possibility of introducing SAP R/3 package to Joshua Arkwright & Sons (JAS), a medium sized, family run manufacturing company. It includes a detailed analysis of the strategic position, operational situation and current challenges of JAS, as well as the potential benefit that may rise from the implementation of SAP R/3 package, and other information relating to the implementing requirements and costs.…

    • 8083 Words
    • 33 Pages
    Powerful Essays
  • Better Essays

    Nibco

    • 1087 Words
    • 5 Pages

    NIBCO’s Inc. is a midsized manufacturer of values and pipe fitting headquartered in Elkhart, Indiana (Brown, Dehayes, Hoffer, Martin & Perkins, 2012, p.468). NIBCO had over 3000 employees and reported $461 million annual revenue. The company implemented SAP R/3 among its ten plants and four new distribution centers. Top management did not take the advice of their consultants concerning taking a slower approach instead of the BIG Bang approach, instead they decided to go along with Boston Consulting Group (BCG) to eliminate the legacy system and replace them with integrated systems. There were four different types of legacy systems that supported the order entry, manufacturing, distribution and accounting functions (Brown et.al 2012, p.470). Different sections in the organization were using their own versions of manufacturing software package with separate database. NIBCO’s decided they needed standardized software across the company that’s how ERP package came about.…

    • 1087 Words
    • 5 Pages
    Better Essays
  • Satisfactory Essays

    3. What advice can you give to RR's technical team on their approach of migrating legacy system, with the SAP software?…

    • 542 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Basic Overview of SAP BO Development tools: a) Web Intelligence/Infoview b) Desktop Intelligence c) Crystal Reports Designer d) Universe Designer e) Live Office f) Webi Rich Client g) SAP BO Dashboards/Xcelsius. h) Hands on: Developing a sample BO webi, deski report using efashion universe. Overview of SAP BO Migration: a) Need for migration b) Introduction to Major BO Version releases, Service Packs, Fix Packs etc. c) Basic Idea of Import Wizard d) Basic Idea of Life Cycle Manager e) Planning a large scale BO Migration project. f) Best Practices to be followed for a Migration Project g) Hands On: Migrating a basic BO server.…

    • 457 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    SAP HANA Case Study

    • 869 Words
    • 4 Pages

    In order to successfully implement SAP HANA the company’s management needs to address a number of critical technological, organisational and managerial issues. Key among these are as follows;…

    • 869 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    * IT assesses usage and creates an intranet portal for information users at senior levels who don’t utilize the ERP functionality — saving 120 SAP licenses.…

    • 722 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Sender to IS: For Java proxies, an XI internally configured connection is always used. For ABAP proxies, the communication path is configured globally…

    • 7071 Words
    • 29 Pages
    Good Essays
  • Satisfactory Essays

    SAP se16

    • 1830 Words
    • 8 Pages

    SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com | UAC - uac.sap.com…

    • 1830 Words
    • 8 Pages
    Satisfactory Essays
  • Powerful Essays

    Student

    • 18892 Words
    • 76 Pages

    This guide describes a comprehensive procedure for installing, configuring, and building an IBM® WebSphere® Portal v8.0.0.1 dynamic cluster using:…

    • 18892 Words
    • 76 Pages
    Powerful Essays
  • Powerful Essays

    SAP Report

    • 1278 Words
    • 4 Pages

    Another issue arising from the implementation of SAP is regarding to the software itself. From the case study, ATLAM aware that the implementation of SAP involved unique risks and challenges especially on the security issue. They have to ensure that the access to the software is in a tight security protection. Therefore, in order to do that ATLAM need to allocate each user with one ID per user per task for the use of internal control and audit purposes. However, Lim as a User Representative mentioned that the security issue will cost a lot and they will have to cut a lot of cost in many aspects.…

    • 1278 Words
    • 4 Pages
    Powerful Essays
  • Satisfactory Essays

    BI installation on Linux

    • 721 Words
    • 3 Pages

    Unlike SAP BO 4.0 installation on Windows, Installation on UNIX like operating systems is a little complicated process, especially when you do not have root rights, and has to go and explain the “System Admin” why you need changes / new additions to libraries, kernel parameters, and environmental variables. So it will need lot of patience, discussions and planning.…

    • 721 Words
    • 3 Pages
    Satisfactory Essays