Here’s the problem, gang…
We now that the bottleneck in the process is the Drying unit. Using the diagram, we can assess: 1. TPT is 19,000*.7 wet barrels/12 work hrs in work day = 1108 wet bbls per day 2. The dryer unit can process 600 bbls wet cranberries per day
Looking at the process we know that there is a bottleneck at Drying unit: I. The capacity of the drying unit is 600 bbl /hr which is much lower than the required 1108 wet bbl/day we need. II. On an average day a total of 10,000 bbl is received out of which 7,000 bbl is wet. At an average processing rate of 600 bbl /hr it will take 11.67 hours to process. Assuming normal working day of 8 hours, there is an overtime of 3.67 hours for each member of the crew on each average working day. III. On a peak day a total of 19,000 bbl is received out of which 13,300 bbl is wet. At an average processing rate of 600 bbl /hr it will take 22.17 hours to process. Thus, there is an overtime of 14 hours.
Lack of drying capacity is one of the major reasons for the increase in overtime cost.

Another reason is the increase in percentage of wet cranberries. * Waiting time for trucks: Inventory build up = arrival rate – processing rate = 1108 bbl – 600 bbl = 508 bbl at this rate the wet bins will be filled in 3500/508 = 6.89 hours. At the end of the day (12 hours) there will be 450*12=5400 bbl in inventory. Out of this 3,500 bbl will be in bins and rest 1,300 bbl will be in trucks. It will take 1,300/600=2.17 hours to empty the waiting trucks. Thus, inventory will start building from 6.89 hours to 14.17 hours. The average waiting time will be (14.17-6.89)/2=3.64 hours. On an average there will be 1300/75 = 17.33 trucks waiting. Thus, the total waiting time will be 17.33*3.64 = 63.08 hours.

Ways to reduce the overtime cost and waiting time:
Install more drying capacity: Add 1 more dryer:
Overtime for each member on average day: On an average day a total of 10,000 bbl is received out of which

You May Also Find These Documents Helpful

  • Satisfactory Essays

    3. Suppose that a peak harvest-season day involves 18,000 barrels of berries, 70% of them wet harvested, arriving uniformly over a…

    • 1037 Words
    • 5 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Kristens Cookies

    • 669 Words
    • 3 Pages

    2. How many orders can you fill in a night, assuming that you are open four hours each night? (Assume that the system is in steady state when the process starts).…

    • 669 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    On an average “busy” day 18,000 bbl arrive over the 12-hr period (7 am to 7 pm). This is based on a typical busy day in September.…

    • 1348 Words
    • 5 Pages
    Powerful Essays
  • Good Essays

    At this rate, the wet bins would be completely filled at 3:25pm. At 7:00pm, when the last truck has arrived at RP1, 4,560 barrels of wet berries would have accumulated, of which 1,360 barrels would be on the trucks. With the plant processing rate of 600 barrels per hour, the trucks would be emptied by 9:16pm with the last truck having waited for 2 hours 16 minutes. The entire process stops at 2:36am, with the total processing time of 19 hours 36…

    • 1691 Words
    • 7 Pages
    Good Essays
  • Satisfactory Essays

    Pumping Iron

    • 368 Words
    • 2 Pages

    Step 1 – Identify the BOTTLE NECK – in this case, the 2nd reactor (Fluidized Bed) was the bottleneck at the 4th step of the 7step process. The 2nd reactor is limited to 400 tons per cycle and each cycle takes 4 hours to complete. Since this is a continuous process system, it is important to ensure the 2nd reactor is always full as it has limited capacity. From there, we worked backwards through the previous three steps to arrive at the initial tons of material required for each process.…

    • 368 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    After running a process flow [see Exhibit 2], it becomes apparent that a main bottleneck exists at the Drying stage of the Wet Berry process, even after using all bins from Bins 17-24 for the Wet Berries, and filling up all dual-processing units (Wet/Dry) with Wet Berries first, before using them for any Dry Berries [see Exhibit 3]; since Dry Berries are able to store overnight, Wet Berries need to be processed first at all times. It is also clear that, since 18 trucks will be delivering every hour, and it takes an average of 7.5 minutes to unload the truck’s raw fruit, we have an immediate backup problem as there is an hour and a quarter line of trucks already waiting. And, when starting the factory at 11:00 AM, we have at least four hours of waiting time for the first truck that arrives at 7:00 AM.…

    • 1079 Words
    • 5 Pages
    Good Essays
  • Good Essays

    Management Examination

    • 679 Words
    • 4 Pages

    The table also gives the number of workers at each station. What is the capacity of this process (in units per minute)?…

    • 679 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    Uniform delivery over 11 hr period is 1210 bbl/hr arrival of wet and 520 bbl/hr of dry…

    • 607 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Stonehaven Case Analysis

    • 1913 Words
    • 8 Pages

    Manufacturing Lead Time (MLT) = Since the machines work simultaneously, the MLT is 41 min/batch.…

    • 1913 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    Manzana

    • 993 Words
    • 4 Pages

    The immediate recommendation is to allocate one-third of the Rater’s working hours to assist the distribution team as this will lead to a flow rate of 40 requests per day for distribution and 37 requests per day for rating (Appendix 2 – Page 9 – Process analysis (Revised)).…

    • 993 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Flow Rate

    • 1997 Words
    • 8 Pages

    Chapter 3 introduced the three basic building blocks of process flow namely the (average) flow time, (average) flow rate and (average) inventory. It is followed by a sequence of three chapters, 4, 5 and 6, which examine each one of these measures individually. Chapter 5 is concerned with flow rate analysis and issues of capacity. The major managerial concept discussed in the in the chapter is that of the bottleneck. We use the notion of the theoretical capacity as a practical and easy to grasp introduction to this topic.…

    • 1997 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    Donner Case

    • 973 Words
    • 4 Pages

    * This means that Lamination and exposure are the bottle neck of the process, and the cycle time for this step will be 22 min / panel. Which means that the capacity will be 2.7 panels / hour…

    • 973 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Dore-Dore Q&a

    • 466 Words
    • 2 Pages

    1. What is Dore-Dore’s motivation to converting to cells? Should the company continue with its plans for complete implementation of cells in children knit wear? If not, which knitwear products are best made in cells?…

    • 466 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    NCC Case Question 3 And 4

    • 368 Words
    • 4 Pages

    The most noticeable bottleneck in the current process/system is the Drying station. The maximum input of to the Drying station is around 1050bbls/hr, but it can only process maximum of 600bbls/hr. Because the input rate exceeds the maximum capacity of the Drying station, waiting time exists.…

    • 368 Words
    • 4 Pages
    Satisfactory Essays
  • Good Essays

    Fluid Catalytic Cracking

    • 3780 Words
    • 16 Pages

    (5,300,000 barrels) per day of feedstock and FCC units worldwide processed about twice that amount.…

    • 3780 Words
    • 16 Pages
    Good Essays

Related Topics