Mineral Water Project
Mineral Water Plant
(Projects)

Page 1 2

INTRODUCTION

The demand for mineral water is increasing at a rapid rate, as people become more health conscious and take precautions against water borne diseases.
Bottled mineral water provides easy transportability and assured water quality. THE PROJECT INVOLVES MACHINERY FOR
• PURIFYING WATER
• BOTTLE MANUFACTURING.
• BOTTLING PURIFIED WATER.
• LABELLING CAPACITY

The plant is being designed for minimum economically viable capacity, such that the capital outlay is optimized.
The capacity of the various units are as under:
- Purification: 1000 litrers / hour i.e. 8000 litres / 8 hour shift
- Bottle Manufacturing: 550 Bottles per hour per machine. 2 nos. machines will give 1100 bottles per hour i.e. 8800 bottles per 8 hour shift.
- Bottling : 24 Bottles per minute of 1000 ml. i.e. 1440 Bottles / hour i.e. 11520 Bottles per 8 hour shift.
- Labelling : Heat Shrink Tunnel would handle 1000 Bottles per hour.
All the 4 capacities have been nearly matched - for any adjustments some of the machines can be run for longer duration. PROCESS FLOW

The plant has 6 components :
1] Purification: Water received from the external source is passed through the purification plant and stored in a stainless steel tank. Thereafter it is fed to the bottling section - and continuos operation achieved.
2] Bottle Manufacturing: Pet preforms are blown into bottles and a sufficient number of bottles, say 1000 nos., kept ready while the machine continues to produce more during the shift , when the bottling has been started.
3] Rinsing - Filling - Capping: The bottles are fed into the machine which automatically rinses, fills and screws the cap on it. Caps are stamped with the date of manufacture and expiry before being put into the hopper for screwing on to the bottle.
4] Labeling: We are proposing use of heat shrink labels and tamper evident heat shrink sleeve on the neck of each bottle.
The

You May Also Find These Documents Helpful

  • Powerful Essays

    Greaves Brewery

    • 1117 Words
    • 5 Pages

    Based on available data and utilizing several forecasting and analysis techniques it is our recommendation to order 4,000,000 bottles to align the operation for efficient sales and to adequately support the operation.…

    • 1117 Words
    • 5 Pages
    Powerful Essays
  • Satisfactory Essays

    Stoichiometry Lab Report

    • 783 Words
    • 4 Pages

    11. Set up the apparatus (funnel, ring stand, filter paper) for filtration while the precipitate in the beaker settles.…

    • 783 Words
    • 4 Pages
    Satisfactory Essays
  • Good Essays

    Exam 2 Operations Management

    • 2658 Words
    • 11 Pages

    A production facility works best when it focuses on a fairly limited set of production objectives.…

    • 2658 Words
    • 11 Pages
    Good Essays
  • Good Essays

    Annual production capacity of a 10 bbl (12 hectoliters) BrewPub System , based on:  one bbl = brewer’s barrel = 31 gallons = 117.4 liters = 1.174 hectoliters  two week production cycle ales  50 week work year  ten fermenter tanks, called fermenters (capacity 10-hl/fermenter) Capacity/fermenter = 10,000 liters x 25 batches = 25,000 liters/annually Capacity/fermenter x 10 fermenter = 250,000 liter/annualyl  five serving tanks (capacity 4 hectoliters per serving tank)  Annual system capacity = 234,608 l/ann = 496,000 pints/ann = 4,000 kegs/ann…

    • 625 Words
    • 3 Pages
    Good Essays
  • Good Essays

    The above table showing the total capacity per hour of each machine center was calculated by taking the number of machines and multiplying them by the run time per piece per minute. This enables you to see the amount produced each minute from each machine center. I then multiplied that by the obvious 60 minutes per hour to determine the output from each machine center each hour. We know from the text that Al Beck is running two eight hour shifts so the machines are running for a minimum of 16 hours per day. Knowing this, I then take my output per hour and divide it by 16-hour days to find the actual production rate.…

    • 783 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Rohm and Hass

    • 454 Words
    • 2 Pages

    Each machine uses about 2g. (50/24) of Met. Fluid Conc. with price 5.68$/gal during 4 weeks…

    • 454 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Stonehaven Inc

    • 785 Words
    • 7 Pages

    + (4.00 x 4) = 17.6 min/batch Manufacturing Lead Time (MLT) 23 min/batch. Capacity = 480 min/day ÷ 23 min/batch =…

    • 785 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    Distillation Lab

    • 758 Words
    • 4 Pages

    The simple distiller is composed of a 100ml round bottom flask that is attached to: a 3-way adapter, thermometer, condenser and vacuum adapter. The apparatus is heated up by placing a powermeter at the bottom of the 100ml round flask. When the temperature becomes high enough to effect the boiling point of one of the compounds in the solution, vapor is created. The gas then travels down the condenser where it condenses back into a liquid. The distilled liquid is then collected by placing a tube on the bottom of the condensing tube. In this cause, the…

    • 758 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    We start by making a process flow diagram for the flow of berries at RP1 from the moment berries arrive at the RP1 in trucks to the moment they leave in RP1 after being bag packed, bulk loaded into trucks or loaded into bulk tins.…

    • 1798 Words
    • 8 Pages
    Powerful Essays
  • Good Essays

    Economics Test Questions

    • 348 Words
    • 2 Pages

    Current operations allow the company to make 500 boxes per day, in two 8-hour shifts (250 boxes per shift). The company has introduced some small changes in equipment, and conducted…

    • 348 Words
    • 2 Pages
    Good Essays
  • Satisfactory Essays

    1. Once in the hood, pull out the plunger from your syringe, cap it with a syringe cap and place the powders inside the barrel.…

    • 615 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Tap Water Research Paper

    • 917 Words
    • 4 Pages

    A couple of decades ago, people turn to the tap for drinking water. Now, most people, both young and old, drink water from bottles. In fact, the demand for bottled water is so great that it has become a multimillion-peso business in the country today.…

    • 917 Words
    • 4 Pages
    Good Essays
  • Satisfactory Essays

    If we assume that we will work 4 hours (240 minutes) each night, and it takes us on average 22 minutes (26+20+20 /3) to produce a dozen. (Considering that one order is a dozen.)…

    • 534 Words
    • 3 Pages
    Satisfactory Essays
  • Better Essays

    cleanliness of the filters and the source. “Spring water is produced from natural aquifers located around…

    • 1379 Words
    • 6 Pages
    Better Essays
  • Powerful Essays

    capacity in the long-term, schedule in such a way as to minimize operation costs, keep inventory…

    • 6643 Words
    • 42 Pages
    Powerful Essays