Millau Viaduct Project Management
The Millau Viaduct is a cable-stayed road bridge which spans the valley of the river Tarn situated alongside the Township of Millau in Southern France. The viaduct standing over 343 meters tall was the world’s tallest cable-stayed bridge and was proposed as the missing link in the A75 auto route that connects Paris in the north to Perpignan in the south. The Millau Viaduct was the product of 17 years of ideas, proposals, planning and designs that resulted in shaving 40 miles off the former route through the region, a boom in local economic development and the completion of the one of the world’s most well managed and constructed projects.

Initiate
Business Case:
The initial objectives of the project are to provide a link in the national and international road network, and to promote economic development and tourism locally by improving access to the connection of Clermont Ferrand and Beziers on the A75 highway. This in turn will serve to relieve the severe traffic congestion due to large quantity of traffic currently passing through the town of Millau.

Stakeholders and Management: * Environmentalist * Residents * Government of France (GoF) * Local Government authorities : The commune of Millau and the Grands Causses Grouping of Communes * The Arrondissement Interdepartemental des Ouvrages d’Art (AIOA) was given responsibility for monitoring the project by the State. It reports to the Infrastructure Directorate of the Aveyron, which manages the construction works of the A75. * Roads users * Media

Project Charter:
Project charter is produced with the initial scope being the feasibility studies into the different routes of the A75 highway. This initial scope will be redefined as the project progresses through each planning stage. Other areas considered are economic development and environmental impact research.

Planning
Project Analysis:
Construct a toll free motorway by connecting route through the Tarn Valley to



References: Smith, N.J. (Ed.), 2008, Engineering Project Management, 3rd Edition, Wiley-Blackwell, Victoria. Steelbridge, 2004, Steel bridges extend structural limits Millau, Steelbridge, viewed 9 March 2013, <http://cnrsm.creteil.iufm.fr/g01_dp/viaduc_millau_apk_44/01_greish/04_millau_steelbridge.pdf>

You May Also Find These Documents Helpful

  • Better Essays

    (Rouse, 2012). A project scope statement is a short document prepared primarily for the customer to clearly describe what the project will deliver and outline generally at a high level all the work required for completing the project. (Valacich, George, and Hoffer, 2012). A Feasibility Study needs to be completed as early in the Project Life Cycle as possible. When completing a feasibility study the best time to complete one is when a range of different alternative solutions have been identified, and one needs to know which solution is the most feasible to implement. The feasibility study analyzes and outlines and several alternatives or methods of achieving business success. The feasibility study helps to narrow the scope of the project to identify the best business…

    • 1134 Words
    • 5 Pages
    Better Essays
  • Better Essays

    · Explain what project scope is and why it is important. Describe the areas of project feasibility that are examined in the analysis phase of the SCLC.…

    • 1385 Words
    • 6 Pages
    Better Essays
  • Powerful Essays

    Term Paper Sec 402

    • 1192 Words
    • 5 Pages

    An outline of the proposed project approach, process, procedures and timelines in other to meet the objectives of the project. If you have a lengthy document please provide a summary no more than 3 pages.…

    • 1192 Words
    • 5 Pages
    Powerful Essays
  • Powerful Essays

    Identify the assumptions that were made to form the basis of defining scope and any that will be made for the purposes of planning the project. List any constraints on the project or dependencies on resources or funding to the project (e.g. time, cost, dates, regulatory issues).…

    • 5764 Words
    • 24 Pages
    Powerful Essays
  • Powerful Essays

    Explain what project scope is and why it is important. Describe the areas of project feasibility that are examined in the analysis phase of…

    • 1348 Words
    • 5 Pages
    Powerful Essays
  • Powerful Essays

    CIS590: Project Plan Paper

    • 4496 Words
    • 18 Pages

    The purpose of this document is to define the scope of the project, assign a Project Manager (PM), define the scope of authority and responsibilities of the PM, identify the project team and its functions and responsibilities, indicate the sources of funding and key stakeholders, and outline oversight and governance organizations. This document also lays the groundwork for decisions and planning regarding project direction, outcomes, and delivery. Upon approval of this project plan, work will be initiated on the project and the necessary resources will be committed to achieve project success.…

    • 4496 Words
    • 18 Pages
    Powerful Essays
  • Satisfactory Essays

    Explain what project scope is and why it is important. Describe the areas of project feasibility that are examined in the analysis phase of the SCLC.…

    • 627 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Project Charter Template

    • 279 Words
    • 2 Pages

    What are the boundaries of the project? What is to be included and what is to be excluded from the project?…

    • 279 Words
    • 2 Pages
    Satisfactory Essays
  • Better Essays

    The requirements are to be defined by the stakeholders and after the information has been discussed and agreed upon it can be documented to define the scope. " In the project scope definition, the elements within the scope and out of the scope are well defined in order to clearly understand what will be the area under the project control. Therefore, you should identify more elements in detailed manner and divide them among the scope and out of scope." ("Tutorialspoint", n.d.). The project scope is defined so that scope creep may be avoided and deadlines can be met. In the analysis of the scope the financial resources required to complete the work will be discussed. Then the positive and negative impacts to the company will be analyzed as the feasibility.…

    • 1174 Words
    • 5 Pages
    Better Essays
  • Powerful Essays

    • Key project deliverables • High level milestones • High level cost estimates • Identify stakeholders • General project approach • Problem statement • High level assumptions • High level constraints • High level risks • Project objectives 1.5 Outline the process groups of the project life cycle • Initiating/Pre-Project Setup • Planning •…

    • 124851 Words
    • 663 Pages
    Powerful Essays
  • Good Essays

    Amiodarone Project

    • 506 Words
    • 3 Pages

    The final phase of the project initiation is finished with an in-depth completion the project charter and the project scope. As Harding (2014) puts it, the charter is a joined document that captures and aligns the organization reason for the project. Whereas, the scope statement focuses on exactly what the project will do. Each section in the project charter and the scope statement was carefully discussed. Knowledge was gained from the amount of work that was involved in the gathering of information for this…

    • 506 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Read Me First

    • 1484 Words
    • 6 Pages

    One of the hallmarks of a successful technology project is having a clear idea of what will be delivered at project completion. A project charter and detailed project requirements help make this clear. As a project manager, you must continually manage according to this idea and make sure that the scope of the effort does not deviate from the goal.…

    • 1484 Words
    • 6 Pages
    Satisfactory Essays
  • Good Essays

    The project scope statement is the formal definition of the project and what needs to be accomplished. This process addresses and documents the characteristics and boundaries of the project and its associated products and services, as well as the…

    • 1086 Words
    • 5 Pages
    Good Essays
  • Powerful Essays

    Tribasa Toll Road Project

    • 2844 Words
    • 12 Pages

    3. How was the transaction structure designed to minimize investor exposure to project risk? ……………………………….....7…

    • 2844 Words
    • 12 Pages
    Powerful Essays
  • Better Essays

    References: Kang, L., Pyoen, A.M., Moon, H., Kim, C., & Kang, M. (2013) Development of improved 4D…

    • 1404 Words
    • 6 Pages
    Better Essays