Preview

METHOD STUDY 3

Powerful Essays
Open Document
Open Document
4666 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
METHOD STUDY 3
PRODUCTIVITY, BUILDABILITY AND CONSTRUCTABILITY: IS WORK STUDY THE MISSING LINK?

Improving productivity, increasing output for the same inputs, has been a longstanding concern of the UK Construction Industry. The different approaches to improving productivity will be briefly reviewed as will the decline in awareness of classical work study and use by construction firms. Definitions of “buildability” and “constructability” will be considered and reports seeking to improve buildability reviewed. The key results of several questionnaire surveys will be presented and contractual relationships are identified both as a major deterrent to improved buildability and as the means by which buildability problems are being overcome. Suggestions are made for an expansion of the role of the Architectural Technologist.

Keywords: architecture, buildability, construction management, constructability, productivity.

INTRODUCTION

The owners of buildings, particularly when building for investment or speculative gain, invariably seek a better performing product, or larger buildings at a cheaper price. The Construction Research and Innovation Strategy Panel (CRISP 1996) asserts that “the UK construction industry has one of the highest unit output costs in Europe, despite having one of the lowest unit input costs in terms of labour and materials”. While the validity of these claims cannot be verified and international comparisons of industry performance are notoriously difficult there can be no doubt that major clients are demanding improved value from construction.

The public client, a post- war socialist response to the satisfaction of society’s needs, has been replaced by the private client as the transition from a command economy to a market led free enterprise economy has transformed Britain over the past half century. The Latham report (1994), written from the viewpoint that clients’ needs are paramount, proposed fundamental changes to the culture and



References: Anderson, W. E. and Bailey, P. (1981) Productivity and the Design Team. Building Technology and Management. (Dec): 3-6. Barnes, R. M. (1966) Motion and Time Study- Design and Measurement of Work, (5th Edition) Brennan, M.P.J. (1995) The demise of work study and its application in educational establishments. Unpublished BA dissertation, University of Liverpool. Bishop, D. (1966) Architects and Productivity. RIBA Journal. (Nov): 513- 515. CIRIA (1983) Buildability: an assessment (Special Publication 26). London: Construction Industry Research and Information Association. CRISP (1996). Building productivity and profits in the construction industry. Watford: Construction Research and Innovation Strategy Panel. Currie, R.M. (1977) rev’d Faraday JE. Work Study. London: Pitman Publishing. Construction Industry Institute (1993) Australian Constructability Principles File. CIIA, University of South Australia, Adelaide. Forbes, W.S. and Stjernstedt, R. (1972) The Finchampstead project. Building. 223(6751): 111-124. Latham, M. (1994) Constructing the team. HMSO McEvoy, J Moore, D. (1996) The Renaissance - the beginning of the end of implicit buildability. Building Research and Information. 24(5): 259-269. Spackman, C. (1997) On the line. Construction Manager. 3(1, Feb): 27. Shaw, A.G. (1960) The Purpose and Practice of Motion Study (2nd Ed). Manchester: Columbine Press. Stevens, A.J. (1987) Housebuilding Productivity in the UK- results of case studies. Whitehead, B. (1970) Facts on Building. An essential aid to productivity. Building, (13 March). Whitehead, B. (1976) Use of Productivity Improvement Techniques in the Building Industry in Great Britain. Proceedings CIB W65 Symposium. Champaign, Illinois. 222-235 280

You May Also Find These Documents Helpful

  • Best Essays

    Busi 650-ILP Final

    • 3605 Words
    • 15 Pages

    Delgado-Hernandez, D., & Aspinwall, E. (2008). A framework for building quality into construction projects - Part I. Total Quality Management & Business Excellence, 19(10), 1013-1028.…

    • 3605 Words
    • 15 Pages
    Best Essays
  • Powerful Essays

    Construction Congress, Walsh, K. D., American Society of Civil Engineers., M.E. Rinker, Sr. School of Building Construction., & International Council for Building Research, Studies and Documentation. (2000). Construction Congress VI: Building together for a better tomorrow in an increasingly complex world : proceedings of the congress : February 20-22, 2000, Orlando, Florida. Reston, Va: The Society.…

    • 1188 Words
    • 5 Pages
    Powerful Essays
  • Best Essays

    Managing Change

    • 2917 Words
    • 12 Pages

    The pace of change has accelerated to a significant pace in organisation over recent years. Changes in external environment have brought about the need for organisations to adapt their internal attitudes, strategies, structures and operations to meet the demands of new external conditions (Craig et al 2005). The construction Industry is no exception to this rule and in July 1994 Sir Michael Latham was commissioned by the United Kingdom government and industry organisations to review procurement and contractual arrangements in the UK construction industry, aiming to tackle controversial issues facing the industry during a period of lapse in…

    • 2917 Words
    • 12 Pages
    Best Essays
  • Satisfactory Essays

    This report has been produced for Master Builders Australia Ltd (MBA) according to their terms of…

    • 19304 Words
    • 78 Pages
    Satisfactory Essays
  • Best Essays

    PUSPASARI, T.R.. (2005). FACTORS CAUSING THE POOR PERFORMANCE OF CONSTRUCTION PROJECT . Available: http://eprints.utm.my/3723/2/TatianaRinaPuspasariMAD2005ABS.pdf. Last accessed 10/11/2012.…

    • 2267 Words
    • 10 Pages
    Best Essays
  • Best Essays

    Discussions during the last few years (e.g. Egan 1998; Finch 2000; Spencer and Winch 2002; Saxon 2005) have shown that integrating design and construction potentially delivers better value for money as well as…

    • 4891 Words
    • 20 Pages
    Best Essays
  • Best Essays

    Bibliography: Costa et al. (2006). Benchmarking Initiatives in the Construction Industry: Lessons Learned and Improvement Opportunities. Journal of Management in Engineering , 22 (4), 158-167.…

    • 4257 Words
    • 18 Pages
    Best Essays
  • Powerful Essays

    busi 414 final paper

    • 3812 Words
    • 11 Pages

    References: Chini, A. R., & Valdez, H. E. (2003). ISO 9000 and the U.S. Construction Industry. Journal Of Management In Engineering, 19(2), 69. DOI 10.1061/ (ASCE) 0742-596x (2003) 19:2 (69).…

    • 3812 Words
    • 11 Pages
    Powerful Essays
  • Best Essays

    In a time of uncertainty; the construction industry which has in the past been widely criticised for its lack of trust, inefficiency and instability are leaving clients with little choice but to vertically integrate some of the functions that has previously been bought through the market.…

    • 2175 Words
    • 9 Pages
    Best Essays
  • Powerful Essays

    A brief review of text books and reports reveal that construction excellence has not only become an option but a necessity, if the UK construction industry is to survive economics dynamics and changing social needs. Considering the industry is one of the pillars of the domestic economy making approximately 10 percent of GDP and employing considerable number of workers, it is important to note that construction excellence is critical for the UK economy and its future.…

    • 1657 Words
    • 7 Pages
    Powerful Essays
  • Good Essays

    Riba Plan of Work

    • 2055 Words
    • 9 Pages

    The choice of procurement route has a fundamental influence on how different Work Stages proceed. This is summarised in outline as far as possible but the exact way in which different Stages are conducted within the overall project programme needs careful consideration at the outset. It is worth noting that the RIBA Plan of Work was originally developed to reflect the needs of Traditional contract forms. The subsequent development of alternative contract forms such as PFI, BSF and partnered contracts means that RIBA Stages don’t necessarily fit precisely with discrete stages in these alternative contract forms. The Achieving Excellence in Construction Procurement guide 11 Sustainability identifies the intervention points for larger programmes such as BSF including PFI. See www.ogc.gov.uk.…

    • 2055 Words
    • 9 Pages
    Good Essays
  • Best Essays

    Building Technology

    • 1732 Words
    • 7 Pages

    Fleming, I. (2009). Construction Technology: an illustrated handbook. Chichester West Sussex: John Wiley and Sons.…

    • 1732 Words
    • 7 Pages
    Best Essays
  • Good Essays

    The intent of this paper is to discuss the stakeholder’s concerns relative to the significance of perceived performance criteria and the related performance outcomes in a construction sector environment located in Hong Kong. The key participants to this study consisted of clients, designers, consultants and contractors. Using a one-way analysis of variance (ANOVA), the research established nine performance criteria namely profitability, care for environmental protection, timeliness of project delivery, quality of life, safety, effectiveness of the construction process, no claims or disputes, job satisfaction, and innovative ideas for design and method. Outliers between the performance criteria and the outcome would represent weaknesses needing performance improvement. The hypotheses developed emphasized that there are variables that govern the research population when analyzing the importance of performance criteria in relation to planned performance outcomes, different types of construction projects may demand different performance levels, and the roles of participants in the construction projects may have varied opinions on what criteria would be most important. Data from 324 practitioners engaged in construction projects in Hong Kong were compiled and analyzed. The respondents were grouped by their roles in the construction project, by the type of construction projects, and by their functional role in their respective organization. Based on the results of the data analysis, the research rated timeliness of delivery or completion of the project as the most important performance criterion out of the nine areas followed by profitability, care for environmental protection, quality of life, safety, effectiveness of the construction process, no claims or disputes, job satisfaction, and last was innovative ideas for design and method. Similar research work was conducted by R.F.Fox, R.R.A Issa, and D Ahrens (2003) as published in the Journal of Construction…

    • 829 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Nielsen, J. and Schäffer, V., “Resource Planning under Uncertainty (in Danish)”, Thesis Department of Construction Management, Technical University of Denmark, 1991.…

    • 3612 Words
    • 15 Pages
    Powerful Essays
  • Powerful Essays

    Galleon Trade

    • 51518 Words
    • 207 Pages

    population living in urban areas rose from around 30% in 1985 to 40% in 2000. More…

    • 51518 Words
    • 207 Pages
    Powerful Essays

Related Topics