Preview

Merton Truck Company

Good Essays
Open Document
Open Document
553 Words
Grammar
Grammar
Plagiarism
Plagiarism
Writing
Writing
Score
Score
Merton Truck Company
MERTON TRUCK COMPANY

1) No. of Model 101= x, no. of model 102=y.Unit contribution/model= S.P – (Variable costs + Fixed cost).For Model 101, variable cost=36000 /unit,For Model 102, variable cost=33000/unit.Fixed cost for both the model= 8600000 Therefore, total contribution z=39000x+38000y-36000x-33000y-8600000Z=3000x+5000y-8600000 The Constraints are:Engine assembly: x + 2y <= 4000Metal stamping: 2x + 2y <=6000Model 101 assembly: 2x <=5000Model 102 assembly: 3y <= 4500x,y>=0.Solving, x=2000, y=1000, z=2400000(b)If engine assembly capacity is increased by 1 unit to 4001, optimal productmix is x=1999, y=1001. By sensitivity analysis, shadow price for engineassembly is 2000 for allowable increase/decrease of available constraint by500. Hence, extra unit of capacity is worth 2000. Therefore, increase incontribution z is 2000
(c) Since, allowable increase of available constraint of engine assembly is500,hence capacity increase by 100 will lead to increase in contribution= shadowprice (engine assembly capacity) * increase in avl. Constraint (<500) = 2000* 100 = 100 times as contribution increase in (b) Also if we use solver, forengine assembly constraint= 4100, x = 1900, y=1100, z= 2600000. Therefore
, increase in contribution = 200000.
(d) Maximum allowable increase is 500.
2) Since shadow price is 2000, maximum rent Merton can give to supplier is2000 for an hour of engine assembly capacity utilization. Also since allowableincrease is 500, maximum number of engine hours it should rent is 500.3) For Model 103, we introduce a 3 rd constraint w.Contribution by w is given as 2000.Hence now, z=3000x + 5000y + 2000w-8600000.As per given data, machine-hour/truck for model 103 are 0.8, 1.5 and 1 onengine assembly line, metal stamping line and Model 101 line respectively.Hence, new constraints:Engine assembly: x + 2y + .8w <= 4000Metal stamping: 2x + 2y + 1.5w <= 6000

Model 101 assembly : 2x + w < = 5000Model 102 assembly : 3y <=

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Pt1420 Unit 4

    • 4123 Words
    • 17 Pages

    We would be willing to pay up to $2.70 per unit for up to 20 more units of resource…

    • 4123 Words
    • 17 Pages
    Satisfactory Essays
  • Powerful Essays

    Available for Use | 33,000.00 | | | Ending Direct Materials Inventory | 2,000.00 | | | Direct Materials Used | | 31,000.00 | | Direct Labor | | 22,000.00 | | Manufacturing Overhead: | | | | Indirect Materials | 1,700.00 | | | Indirect Labor | 800.00 | | | Depreciation – Plant and Equipment | - | | | Plant Utilities, Insurance, and Property Taxes | 1,600.00 | | | Total Manufacturing Overhead | | 4,100.00 | | Total Manufacturing Costs Incurred During the Year | | | 57,100.00 | Total Manufacturing Costs to Account For | | | 70,500.00 |…

    • 687 Words
    • 3 Pages
    Powerful Essays
  • Satisfactory Essays

    Assignment # 3 Math 540

    • 467 Words
    • 2 Pages

    given in the model is $1,658.88, which means that Julia can only borrow $158.88 from her friend, giving her an additional profit of $238.32. Based on the sensitivity analysis, the upper limit of the sensitivity range for budget is $158.00 allowing her to have a maximum budget of $1658.00. Her shadow price reflects an increase of $1.50 for any additional resource. Therefore if she borrows the maximum of $158.88, she will yield an increase in profit of $238.32 and total profit of $2,488.32.…

    • 467 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    ECO 550 FINAL EXAM

    • 1177 Words
    • 4 Pages

    7. A plant manager is attempting to determine the production schedule of various products to maximize profit. Assume that a machine hour constraint is binding. If the original amount of machine hours available is 200 minutes., and the range of feasibility is from 130 minutes to 340 minutes, providing two additional machine hours will result in the:…

    • 1177 Words
    • 4 Pages
    Good Essays
  • Good Essays

    Food Booth Mat 540

    • 517 Words
    • 3 Pages

    is carefully analyzed using a sensitivity analysis. This analysis identifies any effect an independent variable might have on Julia’s given constraints, in this case, her budget. This increase will generate an increase in product availability and also profitability.…

    • 517 Words
    • 3 Pages
    Good Essays
  • Powerful Essays

    Freaudian Analysis

    • 3380 Words
    • 14 Pages

    Find the optimal solution using the graphical method (use graph paper). Identify the feasible region and the optimal solution on the graph. How much is the maximum profit? Consider the following linear programming problem: Minimize Z = 3 x + 5 y (cost, $) subject to 10 x + 2 y ≥ 20 6 x + 6 y ≥ 36 y ≥ 2 x, y ≥ 0 Find the optimal solution using the graphical method (use graph paper). Identify the feasible region and the optimal solution on the graph. How much is the minimum cost? 2. The Turner-Laberge Brokerage firm has just been instructed by one of its clients to invest $250 000 for her, money obtained recently through the sale of land holdings in British Columbia. The client has a good deal of trust in the investment house, but she also has her own ideas about the distribution of the funds being invested. She requests that the firm select whatever stocks and bonds they believe are well rated but within the following guidelines: 1. At least 20% of the investment should be in accounts with only Canadian content. 2. At least 40% of the investment should be placed in a combination of U.S. electronics firms, aerospace firms, and pharmaceutical companies. 3. No more than 50% of the invested amount should be in precious metals. 4. Ratio of aerospace to pharmaceutical investment should be at least 2 : 1 . Subject to these restrains, the client’s goal is to maximize projected return on investments. The analysts at Turner-Laberge, aware of these guidelines, prepare a list of high-quality stocks and bonds and their corresponding rates of return. Projected Rate of Return (%) Investment 3. Canadian RRSP Thompson Electronics, Inc. (USA) United Aerospace Corp. (USA) Palmer Pharmaceuticals (USA) Alberta Gold Mines (Canada) Formulate this portfolio selection problem using LP. 5.3 6.8 4.9 8.4 11.8…

    • 3380 Words
    • 14 Pages
    Powerful Essays
  • Satisfactory Essays

    Quiz1 Managerial

    • 367 Words
    • 3 Pages

    1. Buildz manufacturing currently products 1k tables per month. Following per unit data for 1k tables apply for sales to regular customers…

    • 367 Words
    • 3 Pages
    Satisfactory Essays
  • Good Essays

    Cheat sheet OMIS 355

    • 727 Words
    • 3 Pages

    The following linear programming problem has been written to plan the production of two products. The company wants to maximize its profits. 
X1 = number of product 1 produced in each batch X2 = number of product 2 produced in each batch 
MAX: 150 X1 + 250 X2
Subject to: 2 X1 + 5 X2 ≤ 200 − resource 1 
3 X1 + 7 X2 ≤ 175 − resource 2 X1, X2 ≥ 0. How many units of resource 1 are consumed by each unit of product 1 produced? 2…

    • 727 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Accounting 3230

    • 570 Words
    • 3 Pages

    The Rest-a-Lot Chair Company manufacturers a standard recliner. During February, the firm's Assembly Department started production of 75,000 chairs. During the month, the firm completed 85,000 chairs and transferred them to the Finishing Department. The firm ended the month with 10,000 chairs in ending inventory. All direct materials costs are added at the beginning of the production cycle. Weighted-average costing is used by Rest-a-Lot.…

    • 570 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    MD Widgets manufactures three different product lines, Model X, Model Y, and Model Z. Considerable market demand exists for all models. The following per unit data apply:…

    • 379 Words
    • 2 Pages
    Satisfactory Essays
  • Satisfactory Essays

    Variable Cost and Model

    • 419 Words
    • 2 Pages

    Module Assignment 2-Problem Set Management Marketing MKT-450 Karen D. Nicosia Grand Canyon University August 29, 2010 Instructor: Prof. Freeman Problem 2-5 Video Concepts, Inc. (VCI) manufactures a line of DVD recorders (DVDs) that are distributed to large retailers. The line consists of three models of DVDs. The following data are available regarding the models: DVD Selling Price per unit Model LX1 Model LX2 Model LX3 $175.00 $250.00 $300.00 Variable Cost per unit $100.00 $125.00 $140.00 Demand/Year Units 2000 1000 500 VCI is considering the addition of a fourth model to its line of DVDs. This model would be sold to retailers for $375. The variable cost of this unit is $225. The demand for the new Model LX4 is estimated to be 300 units per year. Sixty percent of these unit sales of the new model is expected to come from other models already being manufacture by VCI (10 percent from Model LX1, 30 percent from Model LX2, and 60 percent from Model LX3).VCI will incur fixed cost of $20,000 to add the new model to the line. Based on the preceding data, should VCI add the new Model LX4 to its line of VCRs? Why? Current Situation Model LX1 Model LX2 2000 units 1000 units Unit price Sales Revenue Unit variable cost Total variable cost Unit contribution Total contribution Net Profit 175.00 350,000.00 100.00 200,000.00 75.00 150,000.00 $150,000.00 250.00 250,000.00 125.00 125,000.00 125.00 125,000.00 $125,000.00 Model LX3 500 units 300.00 150,000.00 140.00 70,000.00 160.00 80,000.00 $80,000.00 Situation Adding Model LX4 Model LX1 Model LX2 946 Model LX3 392 1982 units units units Unit price Sales Revenue Unit variable cost Total variable cost unit constribution Total contribution Fixed costs Net Profit 175.00 346,850.00 100.00 198,200.00 75.00 148,650.00 148,650.00 250.00 236,500.00 125.00 118,250.00 125.00 118,250.00 118,250.00 300.00 117,600.00 140.00 54,880.00 160.00 62,720.00 62,720.00 In my opinion the company should not add the new line Model LX4. Currently, VCI has…

    • 419 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    ___________________________________________________________________________ 1. A Ch3 Student: firm will maximize profit by producing that level of output at which A. the additional revenue from the last unit sold exceeds the additional cost of the last unit by the largest amount. B. the additional revenue from the last unit sold equals the additional cost of the last unit. C. total revenue exceeds total cost by the largest amount. D. total revenue equals total cost. E. both b and c 2. The function a decision maker seeks to maximize or minimize is the ________ function. A. optimal B. decision-making C. objective D. marginal E. none of the above 3. Choice variables A. determine the value of the objective function B. determine the constraint C. can only take on integer values D. cannot be continuous E. both c and d 4. For an unconstrained maximization problem A. the decision maker seeks to maximize net benefits. B. the decision maker seeks to maximize total benefits. C. the decision maker does not take cost into account because there is no constraint. D. the decision maker does not take the objective function into account because there is no constraint. E. none of the above 5. When marginal cost is greater than marginal benefit at the current activity level, the decision maker can increase net benefit by decreasing the activity because A. B. C. D. total benefit will rise by more than total cost will rise. marginal cost is rising faster than marginal benefit is falling. net benefit is upward sloping at this point. total cost will fall by more than total benefit will fall. 6. For a constrained minimization problem, the decision maker A. is constrained by the specific amount of total benefits. B. is…

    • 8076 Words
    • 33 Pages
    Good Essays