Manufacturing and Economic Order Quantity
FabQual Ltd.
(This case appears in the textbook on pages 463-464 of the second edition and page 464 of the third edition. I have changed the British £ sign to the U.S. $ sign on the monetary data. You can use U.S. $ for all monetary answers.) FabQual Ltd. Manufactures parts and subassemblies for a number of small-volume manufacturers of specialized construction equipment, including bulldozers, graders, and cement mixers. FabQual also manufactures and distributes spare parts. The company has made a specialty of providing spare parts for equipment no longer in production; this includes wear parts that are no longer in production for any OEM. The Materials Management Group (MMG) orders parts – both for delivery to a customer’s production line and for spares – from the Fabrication Department. Spares are stocked in a Finished Goods Store. FabQual’s part number 650810/ss/R9/o is a wear part made only for spares demand. It has had demand averaging 300 units per week for more than a year, and this level of demand is expected to persist for at least 4 more years. The standard deviation of weekly demand is 50 units. (You can ignore this standard deviation information. You will not need to work with it for the questions I have asked.) The MMG has been ordering 1300 units monthly of part number 650810/ss/R9/o from the Fabrication Department to meet the forecast annual demand of 15,600 units. The order is placed in the first week of each month. In order to provide Fabrication with scheduling flexibility, as well as to help with planning raw material requirements, a 3-week manufacturing lead time is allowed for parts. In the Fabrication Department, 2 hours is now allowed for each setup for a run of part number 650810/ss/R9/o. This time includes strip-down of the previous setup; delivery of raw materials, drawings, tools and fixtures, etc; and buildup of the new setup. The 2-hour setup time is a recent improvement over the previous 4 hours, as the result of setup reduction

You May Also Find These Documents Helpful

  • Satisfactory Essays

    Acct 505 Course Project B

    • 598 Words
    • 3 Pages

    ACCT505 Part B Capital Budgeting problem Clark Paints, Inc. Data: Cost of new equipment $200,000 Expected life of equipment in years 5 Disposal value in 5 years $40,000 Life production - number of cans 5,500,000 Annual production or purchase needs 1,100,000 Initial training costs 0 Number of workers needed 3 Annual hours to be worked per employee 2,000 Earnings per hour for employees $12.00 Annual health benefits per employee $2,500 Other annual benefits per employee-% of wages 18% Cost of raw materials per can $0.25 Other variable production costs per can $0.05 Costs to purchase cans - per can $0.45 Required rate of return 12% Tax rate 35% Make Purchase Cost to produce Annual cost of direct material: Need of 1,100,000 cans per year $275,000 Annual cost of direct labor for new employees: Wages 72,000 Health benefits 7,500…

    • 598 Words
    • 3 Pages
    Satisfactory Essays
  • Satisfactory Essays

    The second production plan is the chase aggregate plan. In this plan, the aggregate production rate is equal to the demand forecast. As you can see in Table 2, we will hire 26 employees and lay off 18 employees during these 8 months. From these results, they indicate a fluctuation in the size of the workforce, ranging from a high of 21 employees to a low of 3 employees. This means the company must have enough space, tools, and equipment for up to 21 employees during 8 months. In addition, the total cost of this plan is $331,800, and the unit cost is $18.64 ($331,800 divided by 17,800 units).…

    • 177 Words
    • 1 Page
    Satisfactory Essays
  • Powerful Essays

    Air express companies place many small packages into specially designed cylinders that conform to the…

    • 19490 Words
    • 78 Pages
    Powerful Essays
  • Good Essays

    Case Study

    • 308 Words
    • 2 Pages

    1. One of Specialty’s managers felt that the profit potential was so great that the order quantity should have a 70% chance of meeting demand and only a 30% chance of any stock-outs. What quantity would be ordered under this policy, and what is the projected profit under the three sales scenarios?…

    • 308 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Case Study Specialty Toys

    • 647 Words
    • 3 Pages

    3. Compute the projected profit for the order quantities suggested by the management team under three scenarios: worst case in which sales = 10,000 units, most likely case in which sales = 20,000 units and best case in which sales = 30,000 units:…

    • 647 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Stuart Daw

    • 926 Words
    • 4 Pages

    Present Production activities Roasting Administration activities Purchasing invoice Research & Marketing Procurement activities Equipment Depreciation in equipment Delivery 70,000 Depreciation in vehicle Procurement activities Other overhead 70,000 70,000 Number of kits 27,777 $ 2.52 per kit 10,000 90,000 80,000 10,000 60,000 Number of kits Number of kits Number of deliveries Number of deliveries 27,777 27,777 2,714 2,714 $ $ 2.88 0.36 per kit per kit per delivery per delivery 220,000 20,000 100,000 100,000 Number of purchasing Number of invoices Number of kits 27,777 18,000 27,777 $ $ $ 0.72 5.56 3.60 per kit per invoice per kit 500,000 500,000 Number of kits 27,777 $ 18.00 per kit ABC system…

    • 926 Words
    • 4 Pages
    Good Essays
  • Better Essays

    In this case study the students bought a copier for $18,000 to start their own copy business after noticing a need for it. After purchasing the copier they found out that the one that they purchased is known to break down frequently, and was known to usually take anywhere from one to four days to repair with the time between breakdowns estimated between zero and six weeks. They estimated that they would sell between 2,000 and 8,000 copies per day at .10 per copy. With this expected demand the students wanted to analyze whether they should purchase a back up copier for $8,000 to avoid the potential loss during breakdowns.…

    • 808 Words
    • 4 Pages
    Better Essays
  • Good Essays

    Quality Parts Case Study

    • 956 Words
    • 4 Pages

    In the case study of the factitious company, Quality Parts Company (QPC), QPC supplies gizmos for a computer manufacturer located a few miles away. Although the text states that QPC manufactures only two models of gizmo, it also states that manufacture for models X and Y start at machine 2, the lathe, while model Z requires milling at machine 1. Based on the latter information, this analysis will assume that the former is a mistake, and rely on the three model scenario. The company produces two different models of gizmos in production runs ranging from 100 to 300 units.…

    • 956 Words
    • 4 Pages
    Good Essays
  • Good Essays

    (b) In addition to price fluctuations, you are also uncertain of how much of the material will be required for the project. Scope changes and site conditions will affect the amount of material actually needed. The most likely amount required is 36 tons. However, as little as 28 tons or as much as 56 tons might be required. What is the expected amount of the material needed for the project?…

    • 2102 Words
    • 7 Pages
    Good Essays
  • Satisfactory Essays

    A bakery buys sugar in 15-pound bags. The bakery uses 5000 bags of sugar each year. Carrying costs are $20 per bag per year. Ordering costs are estimated at $5 per order. Assume that the bakery is open 250 days a year and its daily demand is estimated at 20 bags. It takes 5 days for each order of sugar to be filled.…

    • 1687 Words
    • 12 Pages
    Satisfactory Essays
  • Good Essays

    asdads

    • 1033 Words
    • 3 Pages

    (b) False PROBLEMS ON AGGREGATE PRODUCTION PLANNING Washington Laundry Products, Inc., makes commercial and industrial laundry machines (the kinds hotels use), and has these aggregate demand requirements for the next six months. The firm has regular capacity for 120 units, and overtime capacity for 40 more. Currently, subcontracting can supply up to 100 units per month, but the subcontracting firm may soon be unavailable. MonthDemandCosts and other data1220Previous output level150 units2160Beginning inventory100 units3200Stockout cost250 per unit4210Inventory holding cost100 per unit at end of month5200Unit Cost, regular time1,200 per unit6190Subcontracting 2,000 per unitUnit Cost, overtime1,500 per unitHiring workers200 per unitFiring workers500 per unit Use the Chase Strategy and answer the following three questions PeriodDemandRegular Time ProductionOver Time ProductionSubcontr-actingInventoryShortagesIncrease in Production LevelDecrease in Production level122021603200421052006190 APP1 What is the total cost of shortages APP 2 What is the…

    • 1033 Words
    • 3 Pages
    Good Essays
  • Good Essays

    Engineering Management

    • 919 Words
    • 4 Pages

    12-24. An improved design of a computerized piece of continuous quality measuring equipment used to control the thickness of rolled sheet products is being developed. It is estimated to sell for $125,000 more than the current design. Based on present test data, however, the typical user has the following probabilities of achieving different performance results and cost savings (relative to the current unit) in the first year of operation (assume these annual cost savings would escalate 5% per year thereafter; a five-year analysis period is used; the MARR=18%, and the net market value after five years is 0):…

    • 919 Words
    • 4 Pages
    Good Essays