Faculty of Business and Law

|Level: 3 |Module: SIM335 Managing Projects |
|Assignment Code: SIM335 |Module Leader: Michael Cassop-Thompson |
| | |
|Contribution to module assessment: 100% |

This is an individual assignment - complete both tasks 1 and 2

Background: The assignment is intended to bring out the benefits and limitations of different approaches to project planning and control by relating these to the circumstances in the cases outlined. It is also intended to allow students to demonstrate their learning and competence in respect of the management of resources generally, but in particular elements of scope, schedule, quality, and cost.

Case 1:. Hansdon Ltd is an organisation which provides consultancy advice to the sport and physical activity sector. Consultancy for the company includes: human resource projects, wetside projects (i.e. swimming pool safety), dryside projects (i.e. installation of sophisticated equipment). As part of your job as the Hansdon Ltd special projects manager you have produced a list of activities that need to be addressed to source a technological solution for allowing customer admissions to sports facilities. The details are shown in the table provided. Please note: You must use the methodology detailed above table 1 headed “essential methodology”.

Task 1 (40% marks)

1) Draw the network diagram (use activity on the node). (8 marks)

2) Explain how you determined the timing of activities and the total float. (6 marks)

3) Explain how you determined the project duration and the critical path. (6

You May Also Find These Documents Helpful

  • Best Essays

    Is3350 Unit 1 Assignment

    • 3307 Words
    • 14 Pages

    In order to calculate the timing of an activity ‘Duration’ of the activity needs to be summed up with the ‘Earliest Finish…

    • 3307 Words
    • 14 Pages
    Best Essays
  • Good Essays

    Project Management

    • 694 Words
    • 3 Pages

    References: Brown, C. (2011). Requirements risk. Business Analysts Articles: Business Analysis and Systems Analysis. Retrieved from http://www.modernanalyst.com/Resources/Articles/tabid/115/articleType/ArticleView/articleId/212/Requirements-Risk-Management.aspx.…

    • 694 Words
    • 3 Pages
    Good Essays
  • Satisfactory Essays

    Problem 1 The following data were obtained from a project to create a new portable electronic. Activity Duration Predecessors A 5 Days --- B 6 Days --- C 8 Days --- D 4 Days A, B E 3 Days C F 5 Days D G 5 Days E, F H 9 Days D I 12 Days G Step 1: Construct a network diagram for the project.…

    • 605 Words
    • 3 Pages
    Satisfactory Essays
  • Powerful Essays

    Project Management

    • 1515 Words
    • 7 Pages

    Construct a Cost-Benefit Analysis matrix for an organization that is considering replacing its internal payroll system with a payroll outsourcing service. Include direct and indirect revenue enhancements and direct and indirect cost reductions.…

    • 1515 Words
    • 7 Pages
    Powerful Essays
  • Powerful Essays

    Project Management

    • 2565 Words
    • 9 Pages

    - Project stakeholders are individuals and organizations that are actively involved in the project, or whose interests may be affected as a result of project execution or project completion. They may also exert influence over the project's objectives and outcomes.…

    • 2565 Words
    • 9 Pages
    Powerful Essays
  • Satisfactory Essays

    Project Management

    • 252 Words
    • 2 Pages

    2. Assume that the project is time constrained and try to resolve any over allocation problems by leveling within slack. What happens?…

    • 252 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Project Management

    • 689 Words
    • 3 Pages

    Project indirect cost represents overhead cost. Indirect cost varies directly in time. For instance, if our daily overhead cost is 250 euro, any reduction in project duration has to represent a saving of 250 euro per day. Project direct cost is clearly charged to a specific work package such as labor, materials and equipments. In order to create a cost-duration graph we have to apply three major steps:…

    • 689 Words
    • 3 Pages
    Powerful Essays
  • Good Essays

    Project Management

    • 844 Words
    • 4 Pages

    McDonald's is creating a multinational distribution system for all of its foreign and domestic subsidiaries. The project manager is from the corporate headquarters and he manages teams from each of the countries involved. The project would be classified as A) Global B) Overseas C) Local D) Domestic E) Foreign…

    • 844 Words
    • 4 Pages
    Good Essays
  • Powerful Essays

    Output and Average Age

    • 1584 Words
    • 7 Pages

    1 a) Write the problem statements as of what is needed to solve this problem.…

    • 1584 Words
    • 7 Pages
    Powerful Essays
  • Satisfactory Essays

    Project Management

    • 305 Words
    • 2 Pages

    1. If I were in Lauren’s shoes, I would make sure it’s clear to the strategic management group that my estimate – a more detail/micro estimate – came in well over their initial macro estimate. That being said, I would also provide upper management with the ideas (outsourcing, change scope, cancel project..) developed with stakeholders in the brainstorming meeting. Simply moving forward with the project after finding such a large gap in estimates would be a terrible idea that would most likely to back fire. It’s important that the executives understand major differences or flaws in the project plan.…

    • 305 Words
    • 2 Pages
    Satisfactory Essays
  • Good Essays

    Project Management

    • 361 Words
    • 2 Pages

    Give some examples of each of the three “occasions for decision” cited by Chester Barnard. Explain in your own words why Barnard thought the third category was most important.…

    • 361 Words
    • 2 Pages
    Good Essays
  • Good Essays

    Project Management

    • 1497 Words
    • 5 Pages

    In human resources at some point in time a company may change its processes of how things have been done, add a new policy, or implement a new type of software. This paper will discuss a company considering replacing its internal payroll system with a payroll outsourcing service. It will demonstrate certain risks are associated with the change and how to minimize them. The writer will also Compare the advantages and disadvantages of using a Gantt chart versus using the Performance evaluation and review technique (PERT) and critical path method (CPM) when managing projects. Lastly, receiving feedback from potential users of the new system and how to deal with those who may be against the change will be discussed.…

    • 1497 Words
    • 5 Pages
    Good Essays
  • Satisfactory Essays

    project management

    • 360 Words
    • 2 Pages

    The Burke-Litwin diagnostic model is a comprehensive approach that focuses primarily on transformational factors that affect change. These transformational factors include the external environment, mission and strategy, leadership, and organizational culture (Akin, Dunford & Palmer, 2009). The Burke-Litwin model takes a top down approach where change should start at the top of the organization and flow down to the bottom. The primary transformational factor affecting both Sears and J.C. Penney was the external environment. Each of these companies faced tremendous pressure from non- traditional retailers offering online convenience for affordable prices. In addition, their inability to embrace ecommerce in its infancy compounded the difficulties for both retailors.…

    • 360 Words
    • 2 Pages
    Satisfactory Essays
  • Powerful Essays

    Project Management

    • 2680 Words
    • 11 Pages

    2. According to the authors, the analytic method, when applied to systems, focuses on __________.…

    • 2680 Words
    • 11 Pages
    Powerful Essays
  • Best Essays

    There are numerous contributing factors that define why an alliance will be created whether within the private or public sector. The case study of LoJack-MicroLogic will be analysed in reference to the private sector to determine whether it can be deemed a success or failure. Relevant frameworks and concepts will be utilised to help make a judgement that will be enforced by various academic theory.…